Report to: Development Services Committee Date of Meeting:
SUBJECT: RECOMMENDATION REPORT
Applications for Draft Plan of Subdivision Approval and Rezoning by Majorwood Developments Inc. 2938 Major Mackenzie Drive East, West side of Woodbine Avenue north of Major Mackenzie Drive, West Cathedral Community, File Nos. SU 02 118584 and ZA 02 118517.
PREPARED BY: Ron Blake, Manager of Development
West District Team
Extension 2600
RECOMMENDATION:
THAT the report entitled:
“RECOMMENDATION REPORT: Applications for Draft Plan of Subdivision Approval and
Rezoning, Majorwood Developments Inc., 2938 Major Mackenzie Drive East, West
side of Woodbine Avenue north of Major Mackenzie Drive, West Cathedral
Community, File Nos. SU 02 118584 and ZA 02 118517”, be received
THAT the record of the public
meeting held on June 7, 2005, relating to the application by Majorwood
Developments Inc. 2938 Major Mackenzie Drive East, West side of Woodbine Avenue
north of Major Mackenzie Drive, be received;
THAT Draft Plan of Subdivision
19TM-02015 prepared by Templeton
THAT the Director of
·
That
the Owner enter into an agreement with the Town, applying specifically to Block
64 of draft plan 19TM-02015, which agreement shall be registered on title,
committing the Owner not to enter into any agreements of purchase and sale with
anyone, including other developers or builders, for the subject block, until
the following conditions have been met:
1.
The Environmental Assessment
Study for the Highway 404 off ramp extension has been approved by
2.
If required, the draft plan has
been revised, to the satisfaction of the Town of Markham and the Region of
York, to reflect any changes to the subject block and to identify the approved
alignment of the Highway 404 off-ramp extension as a public road in accordance
with the approved Highway 404 off-ramp extension Environmental Assessment
Study; and,
3.
The abutting owners have
entered into an agreement with the Town, and other public agencies as required,
or other suitable arrangements have been made to the satisfaction of the Town, to
either construct the Highway 404 off ramp extension (excluding the overpass
structure), or to construct an extension of Nichols Boulevard from Major
Mackenzie Drive to the southern boundary of the subject lands.
THAT the
Mayor and Clerk be authorized to execute a Parkland Conveyance Agreement
between the Town and the Cathedral West Landowners Group, in a form
satisfactory to the Town Solicitor and the Commissioner of Development Services.
THAT the applications to amend zoning by-laws 304-87 and
177-96 be approved and the implementing by-laws set out in Appendix ‘B’ to this
report to this report be enacted;
THAT the applicants agree to pay their proportionate share
of the Hwy. 48 flow control measures, to the satisfaction of the Director of
THAT the applicants be granted a servicing allocation of 97 units, such
allocation to be from the total allocation for the Cathedral community, in
accordance with the February 15 and
THAT the Region of York be advised of the servicing
allocation for this development;
THAT the
Town reserve the right to revoke or reallocate servicing supply to the draft
plan of subdivision should the development not proceed in a timely manner;
AND THAT
the applicant submit the required 30% subdivision
processing fee in
accordance with the Town’s Fee By-law (By-law 2005-357);
AND FURTHER THAT the draft plan approval for plan of
subdivision 19TM-02015 will lapse after a period of three years commencing on
the date of issuance of draft plan approval, in the event that a subdivision
agreement is not executed within that period.
EXECUTIVE SUMMARY:
The 14.32 hectare (35.37 ac.)
site is located north of
The proposed detached and
semi-detached lots within Phase 1 comply with the uses and density (17 to 37
units per hectare) provided for in the Urban Residential - Low Density
designation in the Official Plan. A
zoning by-law amendment is required to implement the draft plan, and is
attached as Appendix ‘B’ to this report.
The first phase of the draft
plan of subdivision proposes 97 residential units in the form of detached (34
units), semi-detached (58 units) and 5 reserve units. This phase also includes a 2.75 ha (6.8 acre)
stormwater management pond and a 0.30 ha (0.74 acre) portion of a neighbourhood
park located north east of the By-pass.
In addition, 4.51 ha (11.14 acres) of employment land and a 0.23 ha
(0.57 acre) Community Amenity Area block are included in the draft plan. Servicing allocation has been granted only
for Phase 1. The employment lands do not
require servicing allocation. The second
phase will not be approved until additional servicing capacity becomes
available.
A statutory Public Meeting was
held on
Staff are generally satisfied with the configuration of the draft plan
of subdivision and recommend that the plan be draft approved, subject to the
conditions above and in Appendix ‘A’.
FINANCIAL CONSIDERATIONS:
Not applicable
1.
Purpose 2. Background 3. Discussion 4.
Financial 5.
Environmental
6. Accessibility 7. Engage
21st 8. Affected Units 9. Attachment(s)
This report
presents an overview and evaluation of the proposed subdivision. The report also includes draft zoning by-law
amendments to permit the proposed development. The report recommends approval
of the draft zoning by-laws and the draft plan of subdivision, subject to
conditions.
Site location and
area context
The 14.32 hectare (35.37 acre) site is located between
The draft
plan of subdivision proposes a mix of detached and semi-detached dwellings in
Phase 1, with the addition of townhouse dwellings in Phase 2. Most units will be on conventional lots,
while a small area of lane-based product on the east side of Street ‘A’ is
proposed for Phase II. A small parcel of
parkland, to be developed in association with a large neighbourhood park on the
property to the north, is included in Phase I.
A second neighbourhood park west of Street ‘A’ will be developed in
Phase II, also in conjunction with the subdivision to the north. A large stormwater management pond is located
on the east side of the property adjacent to the by-pass, and an employment
area is located between
The Phase
1 draft plan of subdivision consists of the following elements:
|
|
Hectares |
Acres |
Gross Site Area |
|
14.32 |
35.37 |
Roads |
|
3.46 |
8.55 |
|
|
0.30 |
0.74 |
Stormwater Management Pond |
|
2.75 |
6.79 |
Overland Flow |
|
0.02 |
0.05 |
Community Amenity Area |
|
0.23 |
0.57 |
Business Corridor |
|
4.51 |
11.14 |
0.3 m reserves |
|
0.01 |
0.03 |
Net Residential Area |
|
3.04 |
7.50 |
Net Non-residential Area |
|
11.28 |
27.87 |
Single Detached Units (includes 5 residential reserve units) Townhouse Units Total Residential Units |
|
39 58 97 |
|
|
|
|
|
Net Residential Density: Low (units per hectare/acre in relation to net site area) |
|
31.91 |
12.93 |
As shown in Figure 4, the Phase 1 draft plan proposes a mix of detached
and semi-detached dwellings in conventional lot configurations. Typical lot depths are approximately 30
metres and typical frontages are 11.6 metres for detached and 15 metres for
semi-detached lots. The detached
dwellings are located near the stormwater management pond, and the semi-detached
units are located at the south end of the subdivision near the commercial plaza
to the south. The phase II subdivision
will consist of mostly townhouse units located on the west side of Street ‘A’
north of Markland.
The plan also proposes an employment corridor between the Woodbine Avenue
By-pass and Highway 404. This employment
area conforms to the Cathedral Community Secondary Plan (OPA 42) and the
approved Community Design Plan for the West Cathedral Community. In accordance with a recent Ontario Municipal
Board settlement, a portion of the proposed retail development to the south
will extend in the Majorwood development east of
Staff are satisfied with the
proposed phasing strategy
The draft plan of subdivision delineates Phase I and Phase II
areas. Due to the servicing allocation
limit of 800 units, granted to the West Cathedral Community by Council in
February and November 2005, only the Phase I portion of the draft plan of
subdivision is to be approved and zoned at this time. Approval of the Phase II portion of the draft
plan must be deferred until additional servicing allocation becomes available.
Statutory public meeting for all the West
Cathedral Community draft plans of subdivision held on June 7, 2005
A number of
local residents spoke at this meeting.
Key comments relating to this application included:
·
Need
for a well monitoring program during construction;
·
Need
for a streescape plan for
·
Support
for the Woodbine Avenue By-pass and the reduced traffic along old Woodbine that
would result;
·
Future
extension of municipal water services to
·
Need
for comprehensive planning in the West Cathedral Community (schools, parks,
open space and environmental planning);
·
Servicing
allocation;
·
Impact
of Construction Vehicles on
These
issues are addressed in subsequent sections of the report.
Draft plan conforms to the Cathedral Community
Secondary Plan
The Cathedral Community Secondary Plan (OPA
#42), approved in 1997, contemplates development of a mixed-use community on
approximately 310 hectares (765 acres) in northwest
The subject lands are designated Urban
Residential - Low Density; Urban Residential - Medium Density, Open Space
(Neighbourhood Park); Open Space (Stormwater Management Pond); and Business
Corridor Area Area by OPA 42, as amended.
The proposed subdivision conforms to the land use pattern set out in the
Secondary Plan.
Applications for amendments to the
zoning by-law are required
Development of the subject lands is currently governed by the Town’s
Rural Area By-law (304-87), which zones the lands Agricultural One (A1). The proposed development is not permitted by
this By-law, and the subject lands will have to be deleted from the Town’s
rural Area By-Law (304-87) and incorporated into the Urban Expansion Area
By-law (177-96).
The draft zoning by-law amendment, attached as Appendix B to this
report, proposes to zone the residential areas within the Residential Two [R2]
category of By-law 177-96. The employment lands are proposed to be zoned under
the Business Corridor Area zone of By-law 177-96. The neighbourhood parks and the Stormwater
Management Pond are zoned OS1 in the draft by-laws.
In addition, the draft zoning by-law applies a Holding Provision (H3)
zone to Block 68 in the Business Corridor area.
Prior to removal of the (H3), only existing uses are permitted. The by-law establishes that the (H3) will not
be removed until the Town has approved an Environmental Assessment study for
the 404 off ramp extension (and there has been no request for a bump-up); if
required, the draft plan has been revised to reflect the recommendations of the
design study; and the Landowner’s Group has entered into an agreement to either
construct the 404 off-ramp extension or the extension of Nichols Boulevard.
The zoning by-law also applies a Holding Provision (H4) zone to Block 68,
the Community Amenity Area lands on the east side of the by-pass. Prior to removal of the (H4), the Woodbine
Avenue By-pass must be built to its ultimate alignment, such that the temporary
‘T’ intersection to be located on the Block is no longer required.
Key issues raised at the public meeting, as
they apply to the subject draft plan, are addressed through conditions of draft
plan approval
·
Streetscape study for
·
·
Traffic impacts on existing
·
Future extension of municipal water
services to
·
Need for comprehensive planning of
the Cathedral Community: In addition to the Cathedral
Community Secondary Plan, which was recently updated and amended, and the
comprehensive West Cathedral Community Design Plan (approved by Council in June
2004), the Landowner’s Group has prepared detailed, community-wide background studies
as required by the Cathedral Secondary Plan.
These studies have been completed to the Town’s and other agencies’
satisfaction. The status of these
studies is addressed in more detail below.
·
Servicing allocation:
The draft plan is limited to a total of 97 residential units (including
5 units allocated to the 10 part blocks to be developed in conjunction with the
Cathedral Town South subdivision to the north), which is part of the original
800 units granted to the Cathedral Town landowers by Council in February and
November 2005. The non-residential
components of the draft plan are not subject to servicing restrictions.
·
Impacts of construction vehicles on
The community-wide
background studies have been approved by the appropriate agencies and Town
Departments
The Secondary Plan requires that the following community-wide background
studies be prepared prior to any draft plan approval in the Cathedral Community:
·
Master
servicing plan
·
Development
Phasing Plan
·
Tree
Conservation Plan
·
External
Traffic Study
·
Noise
Study
·
Community
Design Plan and Parks Master Plan
·
Cultural
Heritage Resource Study
·
Environmental
and Stormwater Management Plan/EIS
All of the above studies have been submitted and approved by the
appropriate outside agencies and Town Departments.
The applicant has
submitted the required subdivision-specific background studies
The
·
Functional servicing study (including grading
plan);
·
Noise impact study;
·
Internal Traffic Study;
·
Stormwater Management Study;
·
Cultural Heritage Resource Study;
·
Site and Grading Specific Tree Preservation
Plans;
·
Phase 1 Environmental Assessment;
·
Hydrogeological Study;
·
Lotting distribution plan – a rendered concept plan which identifies the
lotting mix within each draft plan area. The Town is looking for a mix of lot
sizes within each residential street or block.
·
Housing prototype review – conceptual housing
prototypes should be reviewed with the town prior to the finalization of the
Architectural Control Guidelines. We wish to understand the impact of various
housing types on lot size and configuration.
These
studies have been submitted by the applicant, and are currently under review by
Town staff. The approval of the above
noted studies will be required as conditions of draft approval.
Design issues identified in the preliminary
report have been addressed
The
preliminary report identified several outstanding issues regarding the design
of the subdivision, including the need to develop a strategy for delivery of
the by-pass; the need to resolve the transition and mix of units between the Majorwood
subdivision and the Cathedral Town South subdivision along Street ‘A’; the need
to complete further design studies of the Highway 404 off-ramp extension prior
to permitting pre-sale of draft approved blocks, and releasing the affected blocks
and road allowances for registration.
These issues have been addressed as follows:
·
Detailed strategy for delivery of
the by-pass
Council
authorized staff in March 2005, to finalize a tri-party agreement between the
Region, the Town and the Cathedral Landowners’ Group, to advance the
construction of the Woodbine Avenue By-pass.
The agreement advances the construction schedule of Phase 1 and 2a of
the By-pass from its current date of 2011/2012 to 2007/2008. Detailed conditions are set out in the tri-party
agreement.
The Region of York requests that prior to draft plan approval, the Cathedral West Landowners Group enter into an agreement with the Region for the construction and completion of the Woodbine Avenue By-pass, as outlined in the report adopted by York Region Council at its meeting on June 23, 2005 and revised on February 16, 2006.
At the
The parties have prepared a draft tri-party agreement, which is expected to be executed by July 2006.
A temporary leg
of the By-pass will be required through Block 68 to form a temporary ‘T’
intersection with Old Woodbine. As a
condition of draft plan approval, the Town is requiring that this block be
conveyed into public ownership to accommodate the ‘T’ intersection. This configuration will be needed until the
full length of the By-pass (including Phase 2b north of the Monarch subdivision)
is constructed. Once the By-pass is
completed, and the T intersection is no longer required, Block 68 can then be
conveyed back to the landowner.
·
Mix of units and better transition
between the Majorwood subdivision and the subject lands along Street ‘A’
The units fronting onto the east
side of Street ‘A’ in the Majorwood subdivision are not part of Phase 1, and
will not be draft plan approved until servicing allocation is available for
Phase 2. However, the owner is proposing
lane based product on the east side of Street ‘A’ which will match the lane
based product in the subdivision to the north.
Staff are satisfied with the proposed layout and unit mix. (See Figure 4)
·
Uncertainty regarding the final
alignment of the Highway 404 off ramp extension
With regard to the Highway 404 off
ramp extension, an Environmental Assessment study must be completed to
determine a preferred alignment, as well as impacts on the adjacent network of
collector roads, including
In order to proceed with draft plan approval, yet at the same time
protect for possible revisions to the draft plan to reflect changes in the
alignment of the off ramp extension (as well as the need for a possible
extension of Nichols Boulevard), staff propose the following general approach
for the draft plan approval of Block 64 in the employment lands:
·
Draft
plan approval for Phase 1 will not be issued until the owner enters into an
agreement not to pre-sell Block 64. This
agreement will remain in effect until the Environmental Assessment study has
been approved by the Town and the appeal period has expired without a bump-up
request; any revisions to the draft plan, if required, have been approved; and
the Landowners Group or abutting owners have agreed either to construct the
Highway 404 off ramp extension, or the Nichols Boulevard extension. (See
Recommendations section of this report);
·
Block
64 will not be released for registration until these conditions have been met;
·
That
a holding (H) provision be placed on the above-noted blocks as part of the
approved zoning by-law amendment, and that the H not be removed until the above
conditions have been met. The draft
zoning by-law amendment, attached as Appendix ‘B’, places Block 64 under a hold
provision, and establishes appropriate conditions for lifting the hold.
Redesign of Markland
and relocation of the Markland bike path
Staff have agreed to the relocation of a bike path originally proposed
by the Town on
The draft plan of subdivision conforms to the
approved Parks and Open Space Master Plan
The
A
significant portion of stormwater management pond is also located within this
plan. This pond will be conveyed to the
Town at the time of registration. It
will not be calculated as part of the parkland requirement for the West
Cathedral community.
The subdivision has received servicing
allocation
In February
and November 2005, Council granted 800 units of servicing allocation to the
Red-line revisions to the draft plan are
required
The
conditions of draft plan approval set out a number of red-line revisions to the
draft plan. These include:
CONCLUSIONS
Staff
recommend that Council endorse the draft plan of subdivision, subject to the
conditions set out in this report, including the requirement that the Owner
enter into an agreement not to pre-sell certain blocks until the Town has
completed a detailed design study for the Highway 404 off ramp extension. Staff are of the opinion that the requirement
for the owner to enter into an agreement not to pre-sell these blocks, plus the
related conditions of draft plan approval, will allow for timely approval of
the draft plan, without compromising future opportunities to realign the off
ramp extension or construct alternative routes if the off ramp proves
infeasible.
FINANCIAL TEMPLATE (Separate Attachment):
Not applicable
ENVIRONMENTAL CONSIDERATIONS:
Environmental
issues associated with the West Cathedral Community were addressed
comprehensively within the Environmental and Stormwater Master Plan and the
Environmental Impact Study. Both these
studies have been approved by the Town and the
Not applicable
The proposed development promotes a number of key goals set out in “Engage 21st Century Markham” by providing for efficient use of infrastructure, land use patterns and density, compact development and high levels of architectural and urban design.
BUSINESS UNITS CONSULTED AND AFFECTED:
The
application has undergone a full inter-departmental and agency circulation.
Comments have been incorporated into the report and the proposed conditions of
draft plan approval.
RECOMMENDED BY:
|
|
|
Valerie Shuttleworth, M.C.I.P., R.P.P. Director of |
|
Jim
Baird, M.C.I.P., R.P.P. Commissioner of Development Services |
Figure 1 – Location Map
Figure 2 – Air Photo
Figure 3 – Site Context and Zoning
Figure 4 – Proposed Draft Plan of Subdivision
Figure 5 – Proposed Bicycle Path along By-pass
Appendix A – Draft plan Conditions
Appendix B – Draft Zoning By-law Amendments
Q:\Development\Planning\APPL\SUBDIV\02
118584 majorwood developments inc\Recommendation Report from work-Majorwood
2.doc
FIGURE 1
APPLICANT
AND AGENT: Frank Palombi
Majorwood
Developments
c/o Lakeview Group of Companies
Ph 416-785-8172
Fax 416-781-2981
Email: frank@lakeviewhomesinc.com
LOCATION MAP: