Report to: Development Services Committee                               Date of Meeting: June 6, 2006

 

 

SUBJECT:                          RECOMMENDATION REPORT

                                            Box Grove Centre Inc., Box Grove Hill Developments Inc.& Box Grove North Inc. (19TM-030012) Phase 2

                                            Proposed Plan of subdivision and implementing zoning by-law amendments, Box Grove Planning District.                           SU. 03-115555 and  ZA. 03-115538

 

PREPARED BY:               Biju Karumanchery, Development Manager, East District  ext. 2970.

 

 

RECOMMENDATION:

That the staff report entitled “Box Grove Centre Inc., Box Grove Hill Developments Inc. & Box Grove North Inc. (19TM-030012) Phase 2, Proposed Plan of subdivision and implementing zoning by-law amendments, Box Grove Planning District” dated June 6, 2006, be received;

 

That Phase 2 of draft plan of subdivision 19TM-030012 (SU. 03-115555) located east of 9th Line, north of 14th Avenue, proposed by Box Grove Hill Developments Inc. & Box Grove North Inc. & Box Grove Centre Inc., be draft approved subject to the conditions outlined in Appendix ‘A’;

 

THAT the Director of Planning and Urban Design be directed to issue draft approval once the Owner has complied with the requirement to enter into the agreement set out below restricting pre-sale of certain residential lots in the subdivision;

THAT prior to issuance of draft plan approval, the Owner shall enter into an agreement with the Town, applying to Lots 343, 359, 378, 395 and 410 of draft plan 19TM-030012, which agreement shall be registered on title, committing the Owner not to enter into any agreements of purchase and sale with anyone, including other developers or builders, for the subject lots until such time as:

·        the detailed design for the Markham By-pass (including the completion of the Reference Plan) has been completed; and,

·        a revised draft plan, if required, has been approved by the Town of Markham in consultation with York Region, which incorporates the detailed design of the Markham By-pass, as surveyed. 

      

That zoning application (ZA 03-115538) to amend By-law 304-87 and By-law 177-96, submitted by Box Grove Centre Inc., Box Grove Hill Developments Inc. & Box Grove North Inc. for lands east of 9th Line, north of 14th Avenue, be approved and the implementing Zoning By-Laws attached as Appendix ‘B’ be finalized and enacted;

 

That the applicants agree to pay their proportionate share of the Highway 48 flow control measures, to the satisfaction of the Director of Engineering;

 

That servicing allocation for 527 units be granted to Box Grove Hill Developments Inc., Box Grove North Inc. and Box Grove Centre Inc. (19TM-030012) Phase 2 in accordance with the November 22, 2005 report on servicing allocation;

 

That the Town reserve the right to revoke or reallocate water and sewage allocation at its sole discretion;

 

That the Region of York be advised of the servicing allocation for this development;

 

That the applicants provide to the Town the 30% payment of the required subdivision processing fees in accordance with the Town’s Fee By-law (2005- 357);

 

And further that the draft plan of subdivision approval shall lapse after a period of three years commencing June 6, 2006, in the event that a subdivision agreement is not executed within that period.

 

EXECUTIVE SUMMARY:

The applicant has submitted applications for draft plan of subdivision approval and zoning by-law amendment to permit 527 residential units as well as a 0.1 ha.(0.25 ac.) parkette, a storm water management pond and approximately 17.9 ha. (44 ac.) of employment lands.  A future service station and associated retail/convenience store is proposed on the Town Arterial Road at the east limit of the Plan.  The residential component consists of 383 single detached units and 144 semi-detached units.

 

The subject lands form part of the Box Grove Planning District and are generally located east of 9th Line, north of 14th Avenue, south of Highway 407 and west of the Canadian Pacific Railway tracks and Reesor Road.  The property consists of approximately 54.7 hectares (135 acres).  The lands comprise the 2nd Phase of a larger draft plan of subdivision which was partially draft approved and zoned in 2004 based primarily on the availability of servicing allocation.

 

Sufficient employment lands will be available within approved and proposed developments in the area which, when combined with employment lands expected to be available to the east, will satisfy the obligation in the MOU and the Secondary Plan that 42.5 ha (105 acres) of employment lands be provided within the Box Grove Planning District.  In addition, a service station identified in the Community Design Plan at the northwest corner of the proposed employment collector road and proposed Town Arterial Road (possible Markham By-Pass Link) is proposed to be relocated to Block 460 within the Plan subject to the approval of an Official Plan Amendment application recently submitted by the applicant.

 

Construction of the 9th Line re-alignment is currently underway, and is expected to be completed by the summer of 2006, subject to the right-of-way for the Rouge Bank Drive extension being acquired by the Town.  The purchase of the right-of-way as well as adjacent parkland necessary to complete the developer’s parkland obligations in the area is expected to be completed shortly. 

The Environmental Assessment Study for the Markham By-Pass has been completed and is awaiting Ministry of Environment approval.  A number of matters with regard to the Town Arterial Road right-of-way acquisition and construction remain to be determined.

There are lands in the Town’s ownership to be transferred to the Owner upon confirmation of ultimate alignment of Town Arterial Road (possible Markham By-Pass).

 

A Phasing Plan has been prepared and the Phasing Agreement between the Town and the Developer’s Group has been executed and reflects most of the requirements of the Memorandum of Understanding (MOU) executed in June, 2002 between the developers, the Town and the Region.  Most of the developer’s obligations within the MOU have been completed or are being addressed to the Town’s satisfaction.  Sufficient servicing allocation has been assigned by Council to accommodate the 527 proposed units but the issuance of building permits is to be limited to 291 units within the subject Plan, in accordance with the MOU and the Phasing Agreement, until the Markham By-Pass link is operational. 

 

While the proposed Draft Plan deviates slightly from the Community Design Plan in certain instances, the proposed plan of subdivision generally conforms to the intent of the Secondary Plan and Community Design Plan.  Staff are satisfied with the configuration of the draft plan of subdivision and recommend that the plan be draft approved, subject to the conditions above and in Appendix ‘A’.

 

FINANCIAL CONSIDERATIONS:

Not applicable


1. Purpose                     2. Background                      3. Discussion                        4. Financial        

 

5. Others (Environmental, Accessibility, Engage 21st, Affected Units)             6. Attachment(s)

 


PURPOSE:


The purpose of this report is to recommend draft plan approval of Phase 2 of a larger draft plan of subdivision which was partially draft approved and zoned based primarily on the availability of servicing allocation, subject to the conditions attached as Appendix ‘A’ and the enactment of implementing zoning by-laws (Appendix B).


 

BACKGROUND:


Location and Area Context

The subject lands form part of the Box Grove Planning District and are generally located east of 9th Line, north of 14th Avenue, south of Highway 407 and west of the Canadian Pacific Railway tracks and Reesor Road (Figure 1 & 2).  The property consists of approximately 55 hectares (135 acres). 

 

Draft plan approval was granted for Phase 1 land

In May 2004, Council granted draft plan of subdivision approval for the applicant’s Phase 1 lands (Figure 4).  That plan included 827 residential units, employment lands, a number of natural features (woodlot, two minor tributaries of the Little Rouge Creek, minor tributary of Rouge River), a school block and a portion of a future place of worship site.  In June 2005, the Owner registered 442 residential units and conveyed to the Town two minor tributaries of the Little Rouge Creek.  Some 75 units were transferred to other developers and those units were also registered in 2005.  Eight units were deleted through minor revisions to the Plan at the final plan approval stage.  Registration of the remaining Phase 1 lands consisting of 302 residential units and three employment blocks totalling 14.9 ha. (36.8 acres) is imminent.

 

Lands in Town’s ownership to be transferred to the applicant upon confirmation of ultimate alignment of Town Arterial Road (possible Markham By-Pass)

In 2001, the Committee of Adjustment approved the conveyance of a 16.2 ha (40 acres) parcel of land from the Ontario Realty Corporation (ORC) to Box Grove Hill Developments Inc. located north of 14th Avenue and west of Reesor Road.  The lands to be retained having an area of 15.48 ha (38.25 acres) remained under ORC ownership at that time.

 

The proposed future alignment of the Town Arterial Road, also known as the Markham By-Pass link, was proposed across part of the retained parcel.  The ORC agreed to sell to the Town 8.51 ha (21.04 acres) which had the potential to accommodate the Markham By-Pass alignment, with the applicant front ending the acquisition of these lands (see Figure 2).  When the alignment of the By-Pass has been finalized, the Town will retain ownership of a 20 metre right of way through these lands, plus any lands needed for tapers, approaches or other traffic control features as typically required for a Town arterial road.  All land in excess of the 20 metre right of way will be conveyed to the applicant.  The applicant also agreed at the time to protect for the possibility of the Markham By-Pass becoming a 36 metre Region of York right of way.  The additional right of way of approximately 16 metres, plus any land needed for tapers or approached, will be dedicated to the Region based on their approved design and requirements at the applicable stage in the development approval process.  Conditions to this effect are included in Appendix ‘A’(condition 17.3).  An agreement reflecting the above arrangement was entered into between the applicant and the Town in 2001.

 

Proposed plan of subdivision (Phase 2)

The subject lands comprise the 2nd Phase of a larger draft plan of subdivision which was partially draft approved and zoned based primarily on the availability of servicing allocation.  The subject site is intended to eventually accommodate 527 conventional residential units as well as a 0.1 ha.(0.25 ac.) parkette, a storm water management pond and approximately 17.9 ha. (44 ac.) of employment lands including a future service station and associated retail/convenience store.  The residential component consists of 383 single detached units and 144 semi-detached units (Figure 4).  The proposed residential mix / lot frontages are outlined below:

 

Unit Type

Frontage

No. of Units

Metres

Feet

Single Detached

Min. 10.4

31.4

  86

Single Detached

Min. 12.8

41.9

216

Single Detached

Min. 14.0

45.9

  81

Semi-Detached

Min. 7.5

24.6

144

TOTAL                                                                                                       527

All the proposed semi detached units are located in the south portion of the Plan, between the easterly tributary of the Little Rouge Creek (Trib B) and the CPR rail line.

 

Applicant is a signatory to the Developers Group Agreement                                      A Developers Group Agreement is in place for the Box Grove Area to secure community facilities including parkland and schools, and to compensate the landowners on whose properties the community facilities are located.  The applicant is a signatory to the Developers Group Agreement.

Phasing Plan has been prepared and the Phasing Agreement has been executed

In May 2004, Council endorsed the Box Grove Community Phasing Plan subject to revisions.  This Phasing Plan reflects the requirements of the Secondary Plan and the  Memorandum of Understanding (MOU) between developers in the Box Grove area, the Town and the Region of York, dated June 13, 2002, which outlined the obligations of the parties towards transportation and servicing improvements for the Box Grove community.  A Development Phasing Agreement for the Box Grove area, between the Town and the Box Grove developers, which formalizes appropriate items identified in the Secondary Plan, MOU and the Development Phasing Plan was executed on June 30, 2005. 

 

Acquisition of required road and parkland are expected in the near future

The 9th Line re-alignment is critical to the continued development of the Box Grove area.  While the majority of this road has been constructed the Region of York has indicated that it will not allow this road to become operational until Rouge Bank Drive has been extended to a signalized intersection at the re-aligned 9th Line to provide the residents of the Legacy community with direct access to the re-aligned 9th Line.  However, construction of Rouge Bank Drive extension has been delayed since the required right-of-way for this road traverses a non participating owner’s property.  The Town, in cooperation with the Developers Group, is in the final stages of negotiating the purchase of the necessary land from the property owners.  It is expected that the lands can be acquired and the 9th Line re-alignment can be completed during the summer of 2006.

 

As part of the purchase of the right-of-way, the Town will also be acquiring a parcel of parkland of approximately 1.1 ha. (2.8 ac.) necessary to complete the Community Park and satisfy the parkland requirements in the Box Grove area. 


 

OPTIONS/ DISCUSSION:


Proposed plan of subdivision generally conforms to Secondary Plan and Community Design Plan

The lands comprising the draft plan are primarily designated in both the Secondary Plan

and the Community Design Plan (Figure 5) as Urban Residential – Low Density II, Community Amenity Area I, Community Amenity Area II, Business Park Area and Business Corridor Area.  Both Urban Residential II – Low Density and Community Amenity Area I designations permit single detached and semi-detached dwellings and all but 15 units are located within these designations.  The 15 units located within a Community Amenity Area II designation are discussed in further detail later in this report.

With regard to the proposed Plan, the Secondary Plan provides residential density requirements only for the Urban Residential II – Low Density designation and the proposed density of the units within this designation is shown in the table below.  In addition, since all the residential units within the proposed subdivision are of a low density nature the table below also shows the overall net residential density within the subdivision:

 

 

Proposed Density

Permitted Net Density

Low Density Housing II

17.0 to 37.0 units per net ha.

(6.8 to 14.9 units per net acre)

24.65 units per net hectare

(9.97 units per net acre)

Overall Net Residential Density

 

27 units per net hectare

(10.98 units per net acre)

 

Housing type mix targets contemplated by the Secondary Plan have been modified    Appendix 1 to the Secondary Plan, which is not an operative part of the Plan, sets housing type mix targets of  77% low density housing and 23% medium density housing for the Secondary Plan area.  The Community Design Plan refined those housing type mix targets, in part through the elimination of Community Amenity Area II lands which would have contained medium density housing, to accommodate the final alignment of the employment collector.  The proposed housing mix within the plans of subdivision (Phases 1 and 2), which is approximately 91% low density housing and 9% medium density housing is generally consistent with the distribution of residential land use categories (which determines the housing types) in the Community Design Plan.

The location of 15 single and semi-detached  units within a small Community Amenity Area II designation is considered acceptable                                                                     The Secondary Plan identified a Community Amenity Area II designation between    Trib. B and the employment collector (Figure 5).  However, in accordance with provisions of the Secondary Plan, refinements to the design vision for the Planning District were undertaken through the Community Design Plan.  One of the refinements included a realignment of the employment collector so that it became a single loaded road adjacent to the east side of Trib B providing visual interest and secure public access to the valley.  This adjustment eliminated the majority of the Community Amenity Area II designation within the Planning District, leaving a small vestige of this designation at the southwest corner of the employment collector and the right-of-way for the proposed Markham By-Pass Link.

This designation would only accommodate medium or high density developments but the applicant is proposing 12 semi-detached and three single detached units.  The applicant’s goal is to be consistent with the built form in the immediate vicinity.  As there is no compelling reason to have a medium density development in this particular area staff does not object to the development as proposed.

 

Service station site is proposed to be relocated                                                                The Community Design Plan identifies a future service station site at the northwest corner of the employment collector and the right-of-way for the proposed Markham By-Pass Link.  However, to address the concerns of certain residents to the east of the proposed subdivision whose property was being significantly impacted by a previously proposed alignment of the Markham By-Pass Link right-of-way, Regional staff conducting the EA for the By-Pass moved the final proposed alignment of the Markham By-Pass Link, in consultation with Town Staff and the applicant, slightly to the west.  This realignment created a parcel (Block 460) on the east side of the proposed Markham By-Pass, generally where it meets the CPR Rail line.  This parcel, in the applicant’s opinion, was not ideal for industrial development and the applicant has submitted an Official Plan Amendment application to redesignate Block 460 to permit a service station (see Figure 2) and associated convenience retail use.

Realignment of employment collector provides access to employment lands east of the proposed Markham By-Pass                                                                                                           The slight realignment of the Markham By-Pass Link, as discussed above, has resulted in a realignment northward of the employment collector relative to its position in the Community Design Plan.   The new location of the signalized intersection where the employment collector meets the By-Pass (Figure 4) will allow the extension of the employment collector east of the By-Pass and thereby provide good access to the By-Pass for the future employment lands located east of the By-Pass.  This is significant in light of the Secondary Plan provision which prohibits direct vehicular access from individual lots and blocks to the By-Pass or the Town Arterial Road. 

An appropriate amount of employment lands have been provided                                  The Secondary Plan requires that 42.5 ha (105 acres) of employment lands be provided within Box Grove, of which 14.912 ha (36.8 acres) were draft approved as part of Phase 1.  The proposed plan of subdivision includes 17.87 ha. (44 ac.) of employment lands required for the Box Grove Area (Figure 4).  Staff’s calculations indicate that lands owned by others to the east can, based on reasonable assumptions for roads and valley lands, accommodate the remainder of the required employment lands.

It should be noted that all of the employment lands east of the Town Arterial Road have been denoted with a Regional Gateway symbol in the Secondary Plan to reflect the fact that these lands have been identified by the Province as a potential site for a regionally scaled transportation gateway, intended to become a transfer point among various modes of local, regional and interregional transit facilities.   Development of the Regional Gateway is to be integrated with, and include employment generating land uses.  Employment lands in the Draft Plan in this area will be zoned with a Hold ‘H’ provision to ensure that the development of the lands will be carried out in a comprehensive manner with input from the Province and other external agencies.

Most obligations of the Memorandum of Understanding have been met

As noted earlier, the Owner, together with other developers in the Box Grove area, entered into a Memorandum of Understanding (MOU) with the Town and the Region of York outlining obligations of the parties towards transportation and servicing improvements for the Box Grove community.  To date the obligations have been addressed by the developers as follows:

 

  • Municipal water has been installed to the property line of each remaining lot in the existing Box Grove Hamlet.
  • Oversizing of sanitary sewers to accommodate existing properties in the Box Grove Hamlet has been designed and submitted to the Town for approval.
  • Construction of the 9th Line re-alignment is currently underway, and is expected to be completed by summer of 2006, subject to the right-of-way for the Rouge Bank Drive extension being acquired by the Town (see discussion above).
  • Sufficient employment lands appear to be available within approved and proposed developments in the area which, when combined with employment lands expected to be available to the east, will satisfy the obligation in the MOU and the Secondary Plan that 42.5 ha (105 acres) of employment lands be provided within the Box Grove Planning District.
  • With the approval of the existing applications for draft plan approval, on the north and south sides of 14th Avenue, and the imminent acquisition of parkland from a non participating landowner as discussed above, all the required parkland required for the Box Grove area and agreed to with the area developers will be available.
  • A financial contribution of $500,000 to the Town by the developers will have been submitted in full once a small draft approved plan of subdivision on the south side of 14th Avenue is registered.  

 

The Box Grove developers are also obligated to construct a road that could form part of the Markham By-Pass.  This is discussed later in this report.

 

The EA Study for the Markham By-pass has been completed and is awaiting MOE approval; the detailed design of the By-Pass may affect lotting

The Region of York has completed the “Individual Environmental Assessment for Transportation Improvements in the Markham By-Pass Corridor South of Highway 407” (Markham By-Pass EA).  This Study includes the realignment of 14th Avenue to provide for an at-grade intersection with the Markham By-Pass extension near the CP Rail with protection for an ultimate grade separation of 14th Avenue over both the Markham By-Pass and the CP Rail.  The EA Study was submitted to the Ministry of the Environment (MOE) on December 23, 2005 for formal review as required under the Ontario Environmental Assessment Act (EAA).  Timing of final approval is uncertain at this time.  The preferred alignment of the Markham By-Pass, with a 36 metre right-of-way, traverses the east portion of the subject lands.

 

While the general location of the recommended alignment of the Markham By-Pass and the 14th Avenue grade separation is known, it is possible that modifications to these alignments could potentially occur through the EA approvals process and the final detailed design and alignment of the By-Pass.  While the Region of York would prefer that the east portion of the plan not be draft plan approved until a final decision has been made by the Ministry of the Environment with respect to the Markham By-Pass EA, the Region is requesting that, in the event the Town chooses to draft approve the entire Plan, certain pre-conditions of draft approval as well as specific conditions of draft approval related to this matter be part of the approval. 

 

The pre-condition to be satisfied prior to the granting of draft plan approval involves a requirement that the applicant enter into an agreement with the Town, to be registered on title, which prohibits the sale of five (5) residential lots until such time as the detailed design of the By-pass is completed and a revised Draft Plan, if required, has been approved by the Town in consultation with the Region.  The related condition of Draft Plan approval requires that these five (5) lots be subject to a Holding provision pending the completion of the detailed design of the By-Pass and the approval of a revised Draft Plan if necessary.  A pre-condition of draft approval has been included as part of the staff recommendation  above and conditions of Draft Plan approval are included in Appendix ‘A’.  

 

The Town Arterial Road is required to support the build out of the subject Plan

The Secondary Plan identifies a route alignment and a 20 metre right-of-way for a Town Arterial Road from the realigned 9th Line where it meets the CPR Havelock Line northeast to the Highway 407/Markham By-Pass ramp/interchange.  This route alignment is expected to be shared with the alignment of a portion of the Markham By-Pass, subject to its confirmation as the most appropriate route through the Environmental Assessment Study.  It is expected that construction of the Markham By-Pass, if approved by the MOE, will not be initiated until 2012 or later.  In the interim the area Developers Group will be required to construct the Town Arterial Road, subject to the Town acquiring the necessary right-of-way from non participating owners.  The necessary land acquisition is to be financed through Town Wide Development Charges.  Based on the current transportation study for the area the completion of the Town Arterial Road is required to support the full build out of the Box Grove area.  Building permit restriction until this road is built is discussed in greater detail below.

 

A number of matters with regard to the Town Arterial Road right-of-way acquisition and construction remain to be determined

A number of matters with regard to the Town Arterial Road right-of-way acquisition and construction remain to be determined.  Although staff has initiated discussions with regard to the acquisition of the land necessary to complete the right-of-way for the Town Arterial Road from two non participating landowners, the timing of land acquisition is not certain. Expropriation may be one alternative but since the properties in question are not currently part of a plan of subdivision process, expropriations may involve an Environmental Assessment process for one or both parcels of land.  Further, since the lands are already part of the Environmental Assessment process for the Markham By-Pass the Town’s ability to carry out a separate EA process for the same properties at this time must also be determined.

 

Another possibility is to obtain the necessary lands as a condition of a future subdivision approval.  In the Spring 2006 servicing allocation distribution staff is recommending that 150 units of allocation be assigned to the Box Grove Trustee to facilitate the development of a key parcel of land which will contain a segment of the Town Arterial Road.  An application for this parcel has not been submitted but it is hoped that the availability of servicing allocation would provide the incentive and encourage the submission of an application.

 

Further, the Town in consultation with the Region of York and the Box Grove developers must also determine whether to proceed as per the MOU with an interim two lane rural road or, in order to avoid “throw-away” costs, construct the ultimate four lane road consistent with the future Markham By-Pass.   Finally, the future intersection alignment of 14th Avenue with an interim two lane or ultimate four lane road and the C.P Railway track has to be finalized and additional lands east of the C.P.R may be required to construct a safe intersection.

 

Sufficient servicing allocation is available to accommodate 527 units (Phase 2)

Sufficient servicing allocation (1365 units) for the first Phase of development in Box Grove, including Phase 1 of this Plan of subdivision, was granted in 2004.  The Phasing Agreement between the Town and the Developers’ Group executed in June 2005, which was based on the principles established in the MOU, provide that servicing allocation over and above the initial 1365 units is subject to the 9th Line re-alignment being completed and operational by December 31, 2006 and the Town Arterial Road being designed and constructed no later than December 31, 2007, subject to the necessary right-of-way being available.

 

As noted above, the 9th Line re-alignment is expected to be completed this summer but the timing of completion of the Town Arterial Road remains uncertain. 

 

As discussed below, build-out of the applicant’s residential lands in the area will not be permitted until the Town Arterial Road is completed, pursuant to the MOU.

 

Building permits will be limited to 80% of the units within the applicant’s ownership  

The MOU and the Phasing Agreement  provides that no Group member (with the exception of certain  small landholdings specified in the Phasing Agreement) shall receive building permits for more than 80% of the total number of units within their ownership until the Town Arterial Road (Markham By-Pass Link) is fully constructed, including across non participating owner(s) lands, (subject to the acquisition of such non- participating owner’s land by the Town), provided such 80% release of lands for development can be supported by transportation analysis.

 

The transportation study submitted for the Box Grove area provides that the Markham By-Pass Link will be required to support the build out of the Phase II lands.  An update of the Transportation Study will be required prior to the registration of the final 20% of the applicant’s land holdings in the area. 

 

Within the Box Grove area the applicant owns residential lands that will accommodate, according to currently submitted plans, approximately 1294 units.  Therefore, the zoning of approximately 258 of these units, which include about 236 units within the proposed Plan, will be subject to a Hold ‘H’ provision which will not allow building permits to be issued until the Markham By-Pass Link is completed.

 

Certain site specific technical studies remain to be completed

The Owner will be required to provide an updated Traffic Impact Study and Internal Functional Traffic Design Study prior to the build out of the Box Grove area.  A Servicing Study and a detailed Noise Study will need to be completed, to the satisfaction of the Town, prior to registration of any phase.

 

Public Meeting was held to consider subdivision and zoning amendment applications

On Tuesday, February 17, 2004, a public meeting was held to consider the proposed plan of subdivision and zoning amendment applications.  The following summarizes the

concerns raised with respect to the subject lands (Phase 2) and how each issue has been addressed:

 

9th Line will be accessible during construction

One resident expressed a concern that access might be restricted on 9th Line during construction.  Construction vehicles will be required to access the subject lands primarily from Copper Creek Drive (employment collector) but 14th Avenue may also be utilized, subject to Region of York approval. 

 

Acceptable location for proposed gas bar

The lands at the northwest corner of the proposed employment collector road and proposed Town Arterial Road (possible Markham By-Pass Link) are currently identified in the Community Design Plan as an automobile service centre site.  A resident inquired about the safety of locating a gas station at this intersection with regard to access and egress.  However, as noted above, the applicant is proposing to relocate the service station site to the east (Block 460).  At either location, access/egress for a service station will be reviewed in consultation with the Region of York at the site plan approval stage.

 

Additional concern was raised by area resident following Public Meeting

Following the public meeting, an additional letter was received by an area resident expressing concerns with the potential location of the Markham By-Pass. 

 

The Owner of 7960 Reesor Road expressed concern with the location of the proposed Town Arterial Road and the possible location of the Markham By-Pass link as initially proposed and as it relates to their property. 

 

The previously proposed alignment of the Town Arterial Road and the possible Markham By-Pass link, approximately 250 metres south of the Hwy. 407, would have required the acquisition of more or less 57 metres of the rear portion of the non-participating property in question (7960 Reesor Road).  This would have resulted in a rear yard setback of approximately 22 metres for the existing house on that property from the proposed road right-of-way and this was a matter of serious concern for the property owners. 

 

However, as noted above, the final proposed alignment of the By-pass Link was adjusted to reduce the impact on 7960 Reesor Road and it is staff’s understanding that the property owners are not objecting to the final preferred alignment of the road.

 

Proposed zoning by-law amendments

In accordance with the Secondary Plan requirements, the applicants have applied for zoning by-law amendments to implement the proposed draft plans of subdivision.  The subject lands are currently zoned Agricultural One (A1) and Institutional (INST) under the Town’s rural area By-law 304-87 (Figure 2).  It should be noted that in 1983, the majority of the northwest portion of the lands owned by the applicant were zoned Institutional (INST) under By-law 304-87 consistent with the Ministers Zoning Order, which permitted a cemetery use.  Through the approval of the Box Grove Secondary Plan by the Ontario Municipal Board, the Minister’s Zoning Order was rescinded and the lands can now be rezoned to implement the proposed draft plan of subdivision.

 

Amendments are required to delete the lands from By-law 304-87, and to incorporate the subject lands within the Town’s Urban Expansion By-law 177-96.  The proposed zoning for the plan of subdivision under By-law 177-96 will include the following:

 

  1. Residential Two (R2) zone category for all single detached and semi-detached lots, with exceptions;
  2. Business Corridor (BC);
  3. Business Park (BP); and
  4. Hold ‘H’ provision related to the construction of the Markham By-pass Link will be applied to the 236 units located on the east side of the easterly tributary of the Little Rouge Creek.  In addition, five lots will be subject to a separate Hold ‘H’ provision to address requirements of the Region of York related to the alignment of the Markham By-pass.  A Hold ‘H’ provision will also be applied to the lands zoned Business Park on the east side of the Markham By-Pass to ensure that the development of the lands will be consistent with the Regional Gateway provisions of the Secondary Plan as discussed above. 

 

These zone categories/exceptions will contain development standards consistent with those proposed on similar lots on other proposed plans of subdivision in the vicinity and current Town standards.  Draft amending zoning by-laws for the proposed plan of subdivision are attached as Appendix ‘B’.   

 

Conclusion 

While the proposed Draft Plan deviates slightly from the Community Design Plan in certain instances, the proposed plan of subdivision generally conforms to the intent of the Secondary Plan and Community Design Plan.  Staff are generally satisfied with the configuration of the draft plan of subdivision and recommend that the plan be draft approved, subject to the conditions of draft approval attached as Appendix ‘A’, and that the implementing zoning by-law contained in Appendix ‘B’ be finalized and enacted.

 


 

FINANCIAL TEMPLATE:


Not applicable.


 


 

ENVIRONMENTAL CONSIDERATIONS:

All of the valleylands to be dedicated and the required buffers were conveyed to the Town as part of registration of Phase 1 of the overall Draft Plan.

 

ACCESSIBILITY CONSIDERATIONS:

Not applicable.

 

ENGAGE 21ST CONSIDERATIONS:

The Box Grove development plans were prepared in consultation and cooperation with the existing residents in the area which is in keeping with a goal set out in “Engage 21st Century Markham”, namely investment in the expectations and requirements of the different communities within the Town.  Approval of the proposed draft plan of subdivision will promote another key goal which is Managed Growth.  The Box Grove Phasing Plan establishes a framework for the phasing and coordination of key infrastructure relative to the timing of development.  It is intended that build out of the proposed Plan, in accordance with the Phasing Plan, will result in key pieces of infrastructure such as the 9th Line re-alignment and the Town Arterial Road being constructed.  

 

BUSINESS UNITS CONSULTED AND AFFECTED:

The requirements of other municipal departments and external agencies have been incorporated into the draft plan and recommended conditions of draft plan approval.  

 

RECOMMENDED BY:

 

 

 

 

________________________________                    ______________________________

Val Shuttleworth, M.C.I.P., R.P.P.                               Jim Baird, M.C.I.P., R.P.P.

Director, Planning & Urban Design                               Commissioner, Development Services

 

 

 

Q:\Development\Planning\APPL\SUBDIV\03 115555_BoxGroveHill Phase 2\Box Grove Hill  Phase 2 - Final Report.doc


 

ATTACHMENTS:


Figure 1.  - Location Map

Figure 2   - Area Context / Zoning

Figure 3   - Aerial Map

Figure 4   - Proposed Draft Plan of subdivision

Figure 5   - Subject property as it relates to Community Design Plan

 

 


 

Applicant Contact Information:

KLM Planning Partnership Inc.             Tel: (905) 669-4055

c/o Roy Mason                                     Fax: (905) 669-0097

64 Jardin Drive, Unit 1B

Concord, ON,  L4K 3P3