Report to:  Development Services Committee                             Date of Meeting:  June 6, 2006  

 

 

SUBJECT:                          PRELIMINARY REPORT

                                            Korean Mil Al Church

                                            Applications for Zoning By-law Amendment and Site Plan Approval to permit a place of worship and employment uses at 2705 Elgin Mills Road E.

                                            East of Highway 404 on the south side of Elgin Mills Road E., Cathedral Secondary Plan Area

                                            ZA 06 106824 & SC 06 112095

                                           

PREPARED BY:               Sabrina Bordone, Planner - West Development Team

 

 

RECOMMENDATION:

That a Public Meeting be held to consider Zoning Amendment application (ZA 06-106824) submitted by the Korean Mil Al Church to permit a place of worship and employment uses at 2705 Elgin Mills Road E., located east of Highway 404 on the south side of Elgin Mills Road E. within the Cathedral Community.

 

EXECUTIVE SUMMARY:

Not applicable

 

FINANCIAL CONSIDERATIONS:

Not applicable


1. Purpose                2. Background         3. Discussion             4. Financial         5. Environmental

 

6. Accessibility       7. Engage 21st             8. Affected Units       9. Attachment(s)

 

 


PURPOSE:


The purpose of this report is to provide preliminary information regarding applications submitted by the Korean Mil Al Church for a Zoning By-law Amendment and Site Plan Approval to permit a place of worship and employment uses at 2705 Elgin Mills Road E., and to recommend that a Public Meeting be held to consider the zoning application. 

 


 

BACKGROUND:


The 4.0 ha (9.9 ac) subject lands support an existing single-storey detached residential dwelling with a separate detached garage building located in the rear yard.  The subject lands are municipally identified as 2705 Elgin Mills Road E., which is situated within the Cathedral Community (Figure 1).  The subject lands contain mature trees in both the front and rear yards.  The site is characterized by a north-to-south downward slope. 

 

Adjoining the subject lands are:

 

  • A single detached dwelling and agricultural lands to the north;
  • Vacant lands to the south;
  • Highway 404 to the west; and,
  • A single detached dwelling to the east.

 

Official Plan and Zoning

The subject lands are designated “Industrial – Business Corridor Area” in the Official Plan.  The Secondary Plan for the Cathedral Community shows Markland Street bisecting the subject lands in a west to east direction in the future.   The 2.57 ha (5.86 ac) portion of the subject lands that are situated north of Markland Street are designated as “Business Corridor”; whereas, the 1.5 ha (3.71 ac) portion of the subject lands situated south of Markland Street are designated “Business Park”.  The applicant is proposing a place of worship on the northern portion of the site, which is provided for under the “Business Corridor” designation.  Employment uses are anticipated for the southerly portion of the subject lands, which are currently provided for in the “Business Corridor” designation. 

 

By-law amendment required to permit a place of worship and a range of employment uses 

The subject lands are zoned “Rural Residential” (RR4) by By-law 304-87, as amended (Figure 2).  An amendment is required to permit a place of worship on the northerly portion of the subject site.  Although the applicant has advised staff that there are no current plans for the southerly portion of the site at this time, rezoning to permit employment uses is appropriate at this time.

 

Applicant proposes a place of worship as a first phase of development  

The applicant has submitted applications for a Zoning By-law Amendment and Site Plan Approval to permit the construction of a place of worship on the northerly portion of the subject lands.  The proposed three-storey, approximately 6,656 m2 (71, 646 ft2), place of worship will comprise a main sanctuary with ancillary uses including a gymnasium, kitchen, multi-purpose room, offices and daycare.  The applicant is proposing two phases of construction with Phase I being comprised of the ancillary uses and Phase II being comprised of the main sanctuary.  The applicant has advised that both the main sanctuary and ancillary uses will be constructed at the same time if funding permits. 

 

The applicant is proposing a total of 453 parking spaces to be provided on site, with 199 spaces located within the Elgin Mills Road E. frontage and the remaining 254 parking spaces located within the future Markland Street frontage.  The applicant is currently in the process of working with Town Staff to determine whether the proposed number of parking spaces is sufficient.  A single right in/out access off Elgin Mills Road E. is currently proposed on the site plan (Figure 4).   

 


 

OPTIONS/ DISCUSSION:


The following is a brief summary of the concerns/issues raised to date.  These matters, and others identified through the circulation and detailed review of the proposal, will be addressed in a final staff report to be presented to Committee at a later date:

 

Site Plan is under review

The main entrance for the proposed place of worship faces the future Markland Street, as shown on the south elevation (Figure 5).  Staff have suggested that the main entrance be relocated to the north elevation to create a stronger visual presence from Elgin Mills Road E.  Staff have also requested that the applicants move the building closer to Elgin Mills Road E.  A majority of the parking will then be situated at the rear of the building, which will enhance the streetscape presence for the proposed place of worship.  Staff will continue working with the applicant to address building location and street relationship. 

 

As previously stated, a number of mature trees are situated on the subject lands.  Staff have requested that the applicant submit a tree inventory and preservation plan to determine how the existing vegetation will be incorporated into the proposed site plan.  Staff have also requested that the applicants submit a landscape plan, as minimal landscaping is shown on the proposed site plan.  Enhanced landscape treatments, such as landscaping islands to break up the asphalted parking areas, have been suggested to the applicant.  

 

Staff have also recommended that the applicant modify the built form of the proposed place of worship to work with the natural north-to-south downward slope that characterizes the site.  Changes to the façade treatments and building materials have been suggested and will be finalized through the site plan approval process.  

 

Proposed single right-in/out access is not sufficient

The applicant is proposing a single right-in/out access to the subject property off Elgin Mills Road E.  Staff are concerned that the proposed single right-in/out access is insufficient for patrons to enter and exit the site and for emergency vehicles to access the subject property.  The applicant has been requested to seek approval from York Region and the Ministry of Transportation for this proposed right in/out access, and to explore opportunities for future access to Markland Street.            

 

The main access to the proposed place of worship will be from the south once the construction of Markland Street is completed.  However, due to non-participating landowners, the future Markland Street will terminate at the west boundary of the subject property until the road allowance is conveyed or an easement is secured through either of the adjoining properties.  In order for the future Markland Street to intersect with the Woodbine Avenue By-pass, both the subject property and the adjacent landowner to the east (2755 Elgin Mills Road E.) will need to convey the required road allowance (Figure 6).  Staff will consider the application premature in the absence of Regional and/or Provincial approval for the proposed right in/out access or the extension of the future Markland Street.  An access and traffic circulation study by a qualified transportation engineer will be required prior to site plan approval.        

 

Applicant to enter into Developer’s Group Agreement

As part of the approval process for the proposed development, the applicant will be required to enter into a Developer’s Group Agreement with other developers in the West Cathedral Community for the payment of mutual infrastructure requirements, i.e. stormwater management, external road and servicing, etc.  The applicant will be required to provide a release from the Trustee of the Developers Group confirming that the owner has provided their proportionate share of the costs required by the Developers Group Agreement.                                        

 


 

FINANCIAL TEMPLATE (Separate Attachment):


Not applicable

 


 

ENVIRONMENTAL CONSIDERATIONS:

The subject lands contain mature trees situated in the both the front and rear yards.  Staff have requested that the applicant submit a tree inventory and preservation plan to determine how the existing vegetation will be incorporated into the proposed site plan. 

 

 

ACCESSIBILITY CONSIDERATIONS:

Accessibility considerations will be reviewed as part of the site plan approval process. 

 

 

ENGAGE 21ST CONSIDERATIONS:

The proposed development relates to several key 21st century objectives including fostering a sense of community by recognizing, promoting, and strengthening multi-culturalism, as well as strengthening harmony in diversity by recognizing and respecting religious differences.

 

 

BUSINESS UNITS CONSULTED AND AFFECTED:

The applications have been circulated to all relevant agencies and departments.  Their comments will be incorporated into the review process as required. 

 

 

RECOMMENDED

                            BY:    ________________________          ________________________

                                       Valerie Shuttleworth, M.C.I.P, R.P.P                 Jim Baird, M.C.I.P, R.P.P

                                             Director, Planning & Urban Design                Commissioner, Development

                                                                                                                                Services

 

 

File path: Amanda\File 06 106824\Documents\Recommendation Report


 

ATTACHMENTS:


 

Figure 1 – Location Map

Figure 2 – Area Context and Zoning

Figure 3 – Air Photo (2005)

Figure 4 – Site Plan

Figure 5 – Elevations

Figure 6 – Proposed Road Pattern

 

 

APPLICANT/AGENT:

 

Deborah M. Wylie

Armstrong, Hunter & Associates

156 Duncan Mills Road, Suite 6A

Toronto, ON  

M3B 3N2

 

Tel:  (416) 444-3300

Fax:  (416) 444-3315

 

 