Report to: Development Services Committee Date of Meeting:
SUBJECT: RECOMMENDATION REPORT
Tucciarone Family
Applications for Draft Plan of Subdivision Approval and By-Law Amendment
South side of
Community
File Nos.: ZA.01-110135 & SU.01-110135
PREPARED BY:
RECOMMENDATION:
That the draft plan of subdivision 19T-95075, prepared by KLM
That the
Director of
1.
The
Town has completed a detailed design study for the Woodbine Avenue By-pass;
2.
The
Landowner’s Group has prepared a survey plan of the proposed Woodbine Avenue
By-pass right-of-way that reflects the recommendations of the detailed design
study, to the satisfaction of the Town and the Region of York;
3.
The
Owner has conveyed to York Region, free of all costs and encumbrances, any land
required for the Woodbine Avenue By-pass within the boundaries of the draft
plan 19T-95075 as identified by the above survey; and,
4. If
required, the draft plan has been revised to reflect any changes to the
Woodbine Avenue By-pass alignment and any associated changes to the
configuration of the subject blocks and lots, resulting from the above survey.
That the application submitted by the Tucciarone family to amend Zoning
By-laws 177-76 and 304-87, as amended, be approved, and the draft by-law
attached as Appendix ‘A’ to the staff report dated
That the applicant agree to pay their proportionate share of
the Hwy. 48 flow control measures, to the satisfaction of the Director of
That the Tucciarone family be granted a servicing allocation of 87
units, such allocation to be from the total allocation for the Cathedral
community, in accordance with the
That
the Town reserves the right to revoke or reallocate the servicing allocation
for this development;
That the Region of York be advised of the servicing allocation for this development;
THAT the
Mayor and Clerk be authorized to execute a Parkland Conveyance Agreement between
the Town and the Cathedral West Landowners Group, in a form satisfactory to the
Town Solicitor and the Commissioner of Development Services.
That the applicant provide the Town with the required
payment of 30% subdivision processing fees in accordance with the Town’s Fee
By-law (By-law 2005-357);
And further that the draft plan
approval for plan of subdivision 19T-95075 will lapse after a period of three
years commencing the date of issuance of draft approval, in the event that a
subdivision agreement is not executed within that period.
EXECUTIVE SUMMARY:
The 14.68 hectare (36.28) site is located on the
south side of
The proposed 87 single detached, semi-detached and townhouse units within Phase 1 comply with the uses and density provided for in the Urban Residential – Low Density designation in the Official Plan. A zoning by-law amendment is required to implement the draft plan.
The draft plan of subdivision (Phase 1 and 2) proposes 199 residential units in the form of single detached, semi-detached and townhouse dwellings. The plan also includes a 0.633 hectare (1.56 ac) gas station site and 1.45 hectares (3.58 ac.) of employment lands located west of the proposed Woodbine By-pass. The 11.23 hectare (27.76 ac) first phase of the draft plan of subdivision proposes 47 single detached units, 38 semi detached units and 4 part blocks (2 units). Phase 2 (3.47 hecatares/8.51 ac) will not be draft approved until additional servicing capacity has been allocated.
A statutory Public Meeting was
held on
Staff are generally satisfied with the configuration
of the draft plan of subdivision and recommend that the plan be draft approved,
subject to the conditions set out in Appendix ‘B’.
FINANCIAL CONSIDERATIONS:
Not applicable.
1.
Purpose 2. Background 3. Discussion 4.
Financial 5.
Environmental
6. Accessibility 7. Engage
21st 8. Affected Units 9. Attachment(s)
This report presents an overview
and evaluation of the proposed plan of subdivision (19T-95075). The report also includes draft zoning by-law
amendments to permit the proposed development.
The report recommends approval of the draft zoning by-laws and the draft
plan of subdivision, subject to conditions.
The 14.68 hectare (36.28 ac.)
site (Phase 1 and 2) is located on the south side of
Official Plan designation
The subject lands are designated Urban Residential – Low Density, Open Space – Greenway Link and Business Corridor in the Cathedral Community Secondary Plan (OPA 42). The Secondary Plan was originally approved by York Region in 1997, amended by Town Council in June 2004 and approved by the Region in 2005. The proposed single detached and semi detached lots within Phase 1 comply with the uses and density (17 to 37 units per hectare) provided for in the Urban Residential - Low Density designation (see Table A).
Existing Zoning
The lands are currently zoned Rural Residential Four (RR4) by By-law 304-87. A zoning by-law amendment is required to implement the draft plan of subdivision.
A draft plan of subdivision with a mix of singles, semis, townhouses, a
gas station site and employment lands
The draft plan of subdivision (Phase 1 and Phase 2) proposes 197 residential units in the form of single detached, semi-detached and townhouses, plus 2 residential part lots. The plan also includes a 0.633 hectare (1.56 ac) gas station site and 1.451 hectares (3.58 ac.) of employment lands located west of the proposed Woodbine By-pass. The applicant has servicing allocation for 87 units which comprises the residential portion of Phase 1. The gas station and employment lands do not require servicing allocation (Figure 4). Phase 2 will not be draft approved until additional servicing capacity has been allocated by the Region.
TABLE A |
|||
Phase 1 |
|||
|
Units |
Hectares |
Acres |
Gross Site Area Roads and laneways Park School Open Space Buffer Gas Station Employment lands Road widening Single detached Semi-detached Residential Part Blocks (singles) Residential Part Block (townhouse) |
47 38 1.5 0.5 |
11.238 3.816 0.175 1.387 0.418 0.014 0.633 1.451 0.200 2.032 0.976 0.102 0013 |
27.769 9.429 0.432 3.427 1.032 0.035 1.564 3.585 0.494 5.021 2.412 0.252 0.033 |
Phase 2 |
Units |
Hectares |
Acres |
Gross Site Area Roads and laneways Buffer Landscape feature Single detached Semi-detached Townhouses (Low Density Townhouses (Medium Density) |
3 28 31 50 |
3.447 3.498 0.389 0.022 0.121 0.710 0.681 0.969 |
8.517 8.643 0.961 0.054 0.299 1.754 1.683 2.394 |
Net Residetial Area (Low Density) |
149 singles/semis/townhouses |
4.635 |
11.452 |
Net Residetial Area (Medium Density/Community Amenity) |
50 townhouses |
0.969 |
2.394 |
Net Residential Density (Low Density) |
|
32.14 uph |
13.01 upa |
Net Residential Density (Medium Density/Community Amenity) |
|
51.59 uph |
20.88 upa |
Public Meeting was held on June 7, 2005
A statutory Public Meeting was
held on
·
Traffic
pressures on
Currently
the Region has scheduled the construction of the Woodbine Avenue By-pass from
Major Mackenzie Drive to north of Victoria Square in the 2006 Ten Year Capital
Plan for construction in the year 2012.
However, the Cathedral Developer’s Group and the Town have requested
that the project be considered in three distinct phases. Phase 1 is the portion of road from just
north of Major Mackenzie to Elgin Mills; Phase 2(a) is the portion of road
works that extends approximately 200 metres north of
To date, 300 units have been allocated to Cathedral Town Phase 1 and Phase 2 draft plans, which where approved 2003 and 2005 respectively. Subject to advancement of Phases 1 and 2(a) of the Woodbine By-Pass construction (Figure 5) and the Developer’s Group entering into a pre-paid Development Charges Credit Agreement, the Town allocated servicing capacity for an additional 800 units (500 in February 2005 and 300 in November 2005) for a total of 1,100 units to the West Cathedral Community.
To allow flexibility in the final alignment of the by-pass, should revisions be required, a condition of draft plan approval has been incorporated, whereby the owner agrees to convey to the Region of York, free of all costs, any portion of the by-pass within the boundaries of the draft plan of subdivision, if required by the detailed design study. This will not affect any of the units within the applicant’s phase 1 since all the units adjacent to the by-pass are in phase 2. The only portion of Phase1 that would be affected by the by-pass is a landscape buffer adjacent to the cul-de-sac located in the southern quadrant of the draft plan.
·
Construction
traffic and its impact on area
homeowners
Residents
expressed concern with respect to the impact construction vehicles would have
on their homes. The
· Ensuring an appropriate mix of designs for the townhouses adjacent to Elgin Mills
The
townhouses adjacent to
·
Ensuring
the designs are appropriate for the character of the Cathedral Community
The applicant has submitted to the Town for review, housing prototypes which will help staff understand the impact of the various housing types on lot size configurations and will ensure that the designs are appropriate for the character of the Cathedral Community. Furthermore, the Developer must prepare Architectural Control Guidelines to the Town’s satisfaction prior to final approval of the plan.
·
Resolving
the location of the drainage feature located on the mutual property line
An
existing drainage feature is located along the west limit of the plan just
south of
The agent representing the adjacent landowner to the west (Harmon property) indicated that a cost sharing agreement between the property owners has yet to be resolved. Compensation from the developers group for the portion of the open space block, located on the Harmon property, is required. The owners of the Harmon property have not joined the Cathedral Developers group and compensation for the portion of the open space block located on their lands will be resolved once they become members of the developers group.
Servicing capacity sufficient for Phase 1
The draft plan is limited to a total of 87 residential units (including 2 units allocated to the 8 part blocks to be developed in conjunction with the Cathedral Town South subdivision to the north), which is part of the original 800 units granted to the Cathedral Town landowers by Council in February and November 2005. The non-residential components of the draft plan are not subject to servicing restrictions.
In February, 2005, Markham Council endorsed a proposed flow control option intended to bring the Town’s sewage allocation to a point that would match its current water allocation. Regional Council approved the flow control option in June 2005.
The applicant will be required to pay $100 per unit as their proportionate share for the cost of the Highway 48 Flow Control System, which is required to create the sanitary sewer capacity for this project.
Re-design of cul-de-sac
Staff initially had concerns with the cul-de-sac located at the southern end of Street 5.
Staff have agreed to permit the cul-de-sac, however, in order to mitigate the amount of pavement that is created, the applicant and staff have agreed to provide a 1.5 metre landscape strip adjacent to the by-pass. In addition, although the cul-de-sac does not relate to the grid pattern, it provides variation of built form and a break in the townhouse blocks adjacent to the by-pass.
The draft plan of subdivision
conforms to the approved Parks and Open Space Master Plan
The Cathedral landowners group have
prepared a detailed Parks and Open Space Master Plan which has been approved by
the Town. The Master Plan provides a 0.17
ha (0.43 ac) park block on the east side of Prince Regent Street, south of
Elgin Mills Road. There is an existing
row of mature Norway Maple and Colorado Spruce trees within the park block
which is intended to be preserved. The
park block will be combined with the existing Victoria Square Community Centre
and Park to the east.
Agreement to advance the construction of the
Council authorized staff in March 2005, to finalize a tri-party agreement between the Region, Town and the Cathedral Developers Group, to advance the construction of the Woodbine Avenue By-pass. The agreement advances the construction schedule from its current date of 2011/2012 to 2007/2008. Detailed conditions are set out in the tri-party agreement.
The Region of York requests that prior to draft plan approval, the Cathedral West Landowners Group enter into an agreement with the Region for the construction and completion of the Woodbine Avenue By-pass, as outlined in the report adopted by York Region Council at its meeting on June 23, 2005 and revised on February 16, 2006.
At the
Draft zoning by-law implements draft plan
The draft zoning by-laws delete the lands from the rural area by-law and incorporates them into the urban expansion by-law to permit the construction of the 87 units. The by-law also includes exceptions to require a minimum setback from the Open Space zone (OS1) and deems Woodbine Avenue as the front lot line for the employment lands located on the west side of Woodbine Avenue By-pass.
All studies submitted
The
Functional Servicing Study (submitted, not yet approved)
Noise Impact Study (submitted, not yet approved)
Internal Traffic Study (submitted, not yet approved)
Stormwater Management Study (submitted, not yet approved)
Heritage Resource Study (approved)
Tree Preservation Plan (submitted, not yet approved)
Phase 1 EA (submitted, not yet approved)
Hydrogeologic Study (submitted, not yet approved)
Lotting Distribution Plan (submitted, not yet approved)
Housing Prototypes (submitted, not yet approved)
These studies have been submitted
by the applicant, and are currently under review by Town staff. The approval of the above noted studies will
be required as conditions of draft approval.
Red line revisions to the draft plan may be required, once the studies
have been reviewed.
FINANCIAL TEMPLATE (Separate Attachment):
Not applicable.
ENVIRONMENTAL CONSIDERATIONS:
The applications were circulated
to the T
Not applicable.
ENGAGE 21ST CONSIDERATIONS:
The proposed development promotes a number of key goals set out in “Engage 21st Century Markham” by providing for efficient use of infrastructure, land use patterns and density, compact development and high levels of architectural and urban design.
BUSINESS UNITS CONSULTED AND AFFECTED:
The application has undergone a full circulation. Comments have been incorporated into the report, draft by-law and draft conditions.
CONCLUSION:
Staff are generally satisfied with the configuration
of the draft plan of subdivision and recommend that the plan be draft approved,
subject to the conditions above and in Appendix ‘B’.
RECOMMENDED BY:
________________________ ________________________
Director of
DOCUMENT:
Q:\Development\Planning\APPL\SUBDIV\01 110135
TUCCIARONI - CATHEDRAL\ReportTemplate_060426_v2.doc
Figure 1- Location Map
Figure 2 – Air Photo
Figure 3 – Site Context and Zoning
Figure 4 – Proposed Draft Plan of Subdivision
Figure 5 – Phasing for Woodbine
By-Pass
Appendix A – draft zoning by-law
Appendix B – draft conditions
APPLICANT/AGENT:
KLM
Attn:
L4K 3P3
Tel: (905) 669-4055
Fax: (905) 669-0097