Report to:  Development Services Committee                              Date of Meeting: June 6, 2006

 

 

SUBJECT:      RECOMMENDATION REPORT

Tucciarone Family

Applications for Draft Plan of Subdivision Approval and By-Law Amendment

South side of Elgin Mills Road, west of Woodbine Avenue

Community

File Nos.:  ZA.01-110135 & SU.01-110135

 

PREPARED BY:  Stephen Kitagawa, Senior Planner, extension 4530

 

 

 

RECOMMENDATION:

That the draft plan of subdivision 19T-95075, prepared by KLM Planning Partners Inc., dated May 1, 2006, to permit 47 single detached units, 38 semi-detached units and 2 part blocks, a 0.633 hectare (1.56 ac) gas station site and 1.44 hectares (3.56 ac) of employment lands, south side of Elgin Mills, west of Woodbine Avenue, be approved subject to conditions of draft plan approval and the red-line revisions set out in Appendix ‘A’ to this report;

 

That the Director of Planning and Urban Design be directed to issue draft approval when the following requirements have been complied with: 

 

  • the Owner shall enter into an agreement with the Town, applying specifically to lot 65,  plan 19T-95075, which agreement shall be registered on title, committing the Owner not to enter into any agreements of purchase and sale with anyone, including other developers or builders, for the subject blocks, until the following conditions have been met:

 

1.                  The Town has completed a detailed design study for the Woodbine Avenue By-pass;

 

2.                  The Landowner’s Group has prepared a survey plan of the proposed Woodbine Avenue By-pass right-of-way that reflects the recommendations of the detailed design study, to the satisfaction of the Town and the Region of York;

 

3.                  The Owner has conveyed to York Region, free of all costs and encumbrances, any land required for the Woodbine Avenue By-pass within the boundaries of the draft plan 19T-95075 as identified by the above survey; and,

 

4.         If required, the draft plan has been revised to reflect any changes to the Woodbine Avenue By-pass alignment and any associated changes to the configuration of the subject blocks and lots, resulting from the above survey.

That the application submitted by the Tucciarone family to amend Zoning By-laws 177-76 and 304-87, as amended, be approved, and the draft by-law attached as Appendix ‘A’ to the staff report dated June 6, 2006, be enacted;

 

That the applicant agree to pay their proportionate share of the Hwy. 48 flow control measures, to the satisfaction of the Director of Engineering;

 

That the Tucciarone family be granted a servicing allocation of 87 units, such allocation to be from the total allocation for the Cathedral community, in accordance with the February 15, 2005 and November 22, 2005, reports on servicing allocation;

 

That the Town reserves the right to revoke or reallocate the servicing allocation for this development;

 

That the Region of York be advised of the servicing allocation for this development;

 

THAT the Mayor and Clerk be authorized to execute a Parkland Conveyance Agreement between the Town and the Cathedral West Landowners Group, in a form satisfactory to the Town Solicitor and the Commissioner of Development Services.

 

That the applicant provide the Town with the required payment of 30% subdivision processing fees in accordance with the Town’s Fee By-law (By-law 2005-357);

 

And further that the draft plan approval for plan of subdivision 19T-95075 will lapse after a period of three years commencing the date of issuance of draft approval, in the event that a subdivision agreement is not executed within that period.

 

EXECUTIVE SUMMARY:

The  14.68 hectare (36.28) site is located on the south side of Elgin Mills Road, west of Woodbine Avenue within the West Cathedral Community.

 

The proposed 87 single detached, semi-detached and townhouse units within Phase 1  comply with the uses and density provided for in the Urban Residential – Low Density designation in the Official Plan.  A zoning by-law amendment is required to implement the draft plan.

 

The draft plan of subdivision (Phase 1 and 2) proposes 199 residential units in the form of single detached, semi-detached and townhouse dwellings.  The plan also includes a 0.633 hectare (1.56 ac) gas station site and 1.45 hectares (3.58 ac.) of employment lands located west of the proposed Woodbine By-pass.  The 11.23 hectare (27.76 ac) first phase of the draft plan of subdivision proposes 47 single detached units, 38 semi detached units and 4 part blocks (2 units).  Phase 2 (3.47 hecatares/8.51 ac) will not be draft approved until additional servicing capacity has been allocated. 

 

A statutory Public Meeting was held on June 7, 2005, to consider six draft plans of subdivision and companion zoning by-law amendment applications within the West Cathedral Community.

 

Staff are generally satisfied with the configuration of the draft plan of subdivision and recommend that the plan be draft approved, subject to the conditions set out in Appendix ‘B’.

 

FINANCIAL CONSIDERATIONS:

Not applicable.


1. Purpose                2. Background         3. Discussion             4. Financial         5. Environmental

 

6. Accessibility       7. Engage 21st             8. Affected Units       9. Attachment(s)

 

 


PURPOSE:


This report presents an overview and evaluation of the proposed plan of subdivision (19T-95075).  The report also includes draft zoning by-law amendments to permit the proposed development.  The report recommends approval of the draft zoning by-laws and the draft plan of subdivision, subject to conditions.


 

BACKGROUND:


The 14.68 hectare (36.28 ac.) site (Phase 1 and 2) is located on the south side of Elgin Mills Road, west of Woodbine Avenue and Victoria Square.  Proposed residential plans of subdivisions are located to the north (across Elgin Mills Road) and south.  To the east is the Victoria Square Community Centre and park and to the west are lands designated Business Park and Business Corridor in the Official Plan.  An application for a place of worship has been submitted for lands west of the subject property.

 

Official Plan designation

The subject lands are designated Urban Residential – Low Density, Open Space – Greenway Link and Business Corridor in the Cathedral Community Secondary Plan (OPA 42).  The Secondary Plan was originally approved by York Region in 1997, amended by Town Council in June 2004 and approved by the Region in 2005.  The proposed single detached and semi detached lots within Phase 1 comply with the uses and density (17 to 37 units per hectare) provided for in the Urban Residential - Low Density designation (see Table A).

 

Existing Zoning

The lands are currently zoned Rural Residential Four (RR4) by By-law 304-87.  A zoning by-law amendment is required to implement the draft plan of subdivision.

 

A draft plan of subdivision with a mix of singles, semis, townhouses, a gas station site and employment lands

The draft plan of subdivision (Phase 1 and Phase 2) proposes 197 residential units in the form of single detached, semi-detached and townhouses, plus 2 residential part lots.  The plan also includes a 0.633 hectare (1.56 ac) gas station site and 1.451 hectares (3.58 ac.) of employment lands located west of the proposed Woodbine By-pass.  The applicant has servicing allocation for 87 units which comprises the residential portion of Phase 1.  The gas station and employment lands do not require servicing allocation (Figure 4).  Phase 2  will not be draft approved until additional servicing capacity has been allocated by the Region. 

 

 

TABLE A

Phase 1

 

Units

Hectares

Acres

Gross Site Area

Roads and laneways

Park

School

Open Space

Buffer

Gas Station

Employment lands

Road widening

Single detached

Semi-detached

Residential Part Blocks (singles)

Residential Part Block (townhouse)

 

 

 

 

 

 

 

 

 

47

38

1.5

 

0.5

11.238

3.816

0.175

1.387

0.418

0.014

0.633

1.451

0.200

2.032

0.976

0.102

 

0013

27.769

9.429

0.432

3.427

1.032

0.035

1.564

3.585

0.494

5.021

2.412

0.252

 

0.033

Phase 2

Units

Hectares

Acres

Gross Site Area

Roads and laneways

Buffer

Landscape feature

Single detached

Semi-detached

Townhouses (Low Density

Townhouses (Medium Density)

 

 

 

 

3

28

31

 

50

3.447

3.498

0.389

0.022

0.121

0.710

0.681

 

0.969

8.517

8.643

0.961

0.054

0.299

1.754

1.683

 

2.394

Net Residetial Area (Low Density)

149 singles/semis/townhouses

4.635

11.452

Net Residetial Area (Medium Density/Community Amenity)

50 townhouses

0.969

2.394

Net Residential Density (Low Density)

 

32.14 uph

13.01 upa

Net Residential Density (Medium Density/Community Amenity)

 

51.59 uph

20.88 upa


 

OPTIONS/ DISCUSSION:


Public Meeting was held on June 7, 2005

A statutory Public Meeting was held on June 7, 2005, to consider six draft plans of subdivision and companion zoning by-law amendment applications within the West Cathedral Community.  The following concerns were raised with respect to the Tucciarone family draft plan of subdivision:

 

·        Traffic pressures on Victoria Square

Currently the Region has scheduled the construction of the Woodbine Avenue By-pass from Major Mackenzie Drive to north of Victoria Square in the 2006 Ten Year Capital Plan for construction in the year 2012.  However, the Cathedral Developer’s Group and the Town have requested that the project be considered in three distinct phases.  Phase 1 is the portion of road from just north of Major Mackenzie to Elgin Mills; Phase 2(a) is the portion of road works that extends approximately 200 metres north of Elgin Mills Road.  Phase 2(b) extends to the north limit of the Cathedral Secondary Plan; and Phase 3 extends to connect to Woodbine Avenue.  The locations of these phases are shown in Figure 5.  The Town, the Region and the Landowners are currently finalizing a tri-party agreement to advance construction of Phases 1 and 2(a) of the By-pass to 2007/2008.

To date, 300 units have been allocated to Cathedral Town Phase 1 and Phase 2 draft plans, which where approved 2003 and 2005 respectively.  Subject to advancement of Phases 1 and 2(a) of the Woodbine By-Pass construction (Figure 5) and the Developer’s Group entering into a pre-paid Development Charges Credit Agreement, the Town allocated servicing capacity for an additional 800 units (500 in February 2005 and 300 in November 2005) for a total of 1,100 units to the West Cathedral Community.

 

To allow flexibility in the final alignment of the by-pass, should revisions be required, a condition of draft plan approval has been incorporated, whereby the owner agrees to convey to the Region of York, free of all costs, any portion of the by-pass within the boundaries of the draft plan of subdivision, if required by the detailed design study.  This will not affect any of the units within the applicant’s phase 1 since all the units adjacent to the by-pass are in phase 2.  The only portion of Phase1 that would be affected by the by-pass is a landscape buffer adjacent to the cul-de-sac located in the southern quadrant of the draft plan.

 

·        Construction traffic and its impact on area homeowners

      Residents expressed concern with respect to the impact construction vehicles would have on their homes.  The Engineering Department requires a Traffic Control Plan and Staging Plan which controls construction traffic by addressing issues such as construction signage, barriers, construction entrances and the diversion of traffic.  Staff are satisfied that the Traffic Control Plan will sufficiently address the construction traffic issue.  A condition of draft plan approval requires the developer to direct construction traffic away from Victoria Square.

 

·        Ensuring an appropriate mix of designs for the townhouses adjacent to Elgin Mills

      The townhouses adjacent to Elgin Mills Road are part of Phase 2 that currently has no servicing capacity.  Although, once Phase 2 proceeds, the applicant is required to submit design concepts prior to registration and must obtain site plan approval for the townhouses prior to the issuance of building permits which will give the Town control over the mix of designs for the townhouses adjacent to Elgin Mills.

 

Victoria Square residents were concerned about the massing and elevations of proposed townhouses fronting onto the Woodbine Avenue and Elgin Mills entrances to Victoria Square.  Prior to site plan approval of these townhouse blocks, staff will meet with representatives of the Victoria Square residents to review the townhouse site plans.

 

·        Ensuring the designs are appropriate for the character of the Cathedral Community

      The applicant has submitted to the Town for review, housing prototypes which will help staff understand the impact of the various housing types on lot size configurations and will ensure that the designs are appropriate for the character of the Cathedral Community.  Furthermore, the Developer must prepare Architectural Control Guidelines to the Town’s satisfaction prior to final approval of the plan.

 

·        Resolving the location of the drainage feature located on the mutual property line

      An existing drainage feature is located along the west limit of the plan just south of Elgin Mills Road, along the mutual property line of the applicants and the adjacent owner to the west.  Following a site walk, the TRCA agreed to boundaries of the open space corridor which would encompass the valley land and watercourse corridor.  The corridor would be zoned in an open space zoning category which has the affect of prohibiting structural encroachment and ensuring the long term preservation of the lands in perpetuity, to the satisfaction of the TRCA.  In addition, a 10 metre structural setback has been incorporated into the draft zoning by-law for any lots abutting the valley corridor or open space blocks. 

 

      The agent representing the adjacent landowner to the west (Harmon property) indicated that a cost sharing agreement between the property owners has yet to be resolved.  Compensation from the developers group for the portion of the open space block, located on the Harmon property, is required.  The owners of the Harmon property have not joined the Cathedral Developers group and compensation for the portion of the open space block located on their lands will be resolved once they become members of the developers group. 

 

Servicing capacity sufficient for Phase 1

The draft plan is limited to a total of 87 residential units (including 2 units allocated to the 8 part blocks to be developed in conjunction with the Cathedral Town South subdivision to the north), which is part of the original 800 units granted to the Cathedral Town landowers by Council in February and November 2005.  The non-residential components of the draft plan are not subject to servicing restrictions.

 

In February, 2005, Markham Council endorsed a proposed flow control option intended to bring the Town’s sewage allocation to a point that would match its current water allocation.  Regional Council approved the flow control option in June 2005.

 

The applicant will be required to pay $100 per unit as their proportionate share for the cost of the Highway 48 Flow Control System, which is required to create the sanitary sewer capacity for this project.

 

Re-design of cul-de-sac

Staff initially had concerns with the cul-de-sac located at the southern end of Street 5.   

 

Staff have agreed to permit the cul-de-sac, however, in order to mitigate the amount of pavement that is created, the applicant and staff have agreed to provide a 1.5 metre landscape strip adjacent to the by-pass.  In addition, although the cul-de-sac does not relate to the grid pattern, it provides variation of built form and a break in the townhouse blocks adjacent to the by-pass.

 

The draft plan of subdivision conforms to the approved Parks and Open Space Master Plan

The Cathedral landowners group have prepared a detailed Parks and Open Space Master Plan which has been approved by the Town.  The Master Plan provides a 0.17 ha (0.43 ac) park block on the east side of Prince Regent Street, south of Elgin Mills Road.   There is an existing row of mature Norway Maple and Colorado Spruce trees within the park block which is intended to be preserved.  The park block will be combined with the existing Victoria Square Community Centre and Park to the east.    

 

Agreement to advance the construction of the Woodbine Avenue By-pass

Council authorized staff in March 2005, to finalize a tri-party agreement between the Region, Town and the Cathedral Developers Group, to advance the construction of the Woodbine Avenue By-pass.  The agreement advances the construction schedule from its current date of 2011/2012 to 2007/2008.  Detailed conditions are set out in the tri-party agreement.

 

The Region of York requests that prior to draft plan approval, the Cathedral West Landowners Group enter into an agreement with the Region for the construction and completion of the Woodbine Avenue By-pass, as outlined in the report adopted by York Region Council at its meeting on June 23, 2005 and revised on February 16, 2006.

 

At the May 23, 2006 meeting, Town of Markham Council adopted a resolution that the precondition requested by the Region be incorporated instead as a condition of draft plan approval.  This change has been reflected in the conditions of draft plan approval attached as Appendix ‘A’ to this report.

 

 

 

 

Draft zoning by-law implements draft plan

The draft zoning by-laws delete the lands from the rural area by-law and incorporates them into the urban expansion by-law to permit the construction of the 87 units.  The by-law also includes exceptions to require a minimum setback from the Open Space zone (OS1) and deems Woodbine Avenue as the front lot line for the employment lands located on the west side of Woodbine Avenue By-pass.

 

All studies submitted

The May 17, 2005, preliminary report identified a series of background studies that were to be submitted prior to draft plan approval, including:

 

Functional Servicing Study (submitted, not yet approved)

Noise Impact Study (submitted, not yet approved)

Internal Traffic Study (submitted, not yet approved)

Stormwater Management Study (submitted, not yet approved)

Heritage Resource Study (approved)

Tree Preservation Plan (submitted, not yet approved)

Phase 1 EA (submitted, not yet approved)

Hydrogeologic Study (submitted, not yet approved)

Lotting Distribution Plan (submitted, not yet approved)

Housing Prototypes (submitted, not yet approved)

 

These studies have been submitted by the applicant, and are currently under review by Town staff.  The approval of the above noted studies will be required as conditions of draft approval.  Red line revisions to the draft plan may be required, once the studies have been reviewed.


 

FINANCIAL TEMPLATE (Separate Attachment):


Not applicable.


 

ENVIRONMENTAL CONSIDERATIONS:

The applications were circulated to the TRCA.  All environmental matters are addressed in the draft conditions and the draft zoning by-law.

 

ACCESSIBILITY CONSIDERATIONS:

Not applicable.

 

ENGAGE 21ST CONSIDERATIONS:

The proposed development promotes a number of key goals set out in “Engage 21st Century Markham” by providing for efficient use of infrastructure, land use patterns  and density, compact development and high levels of architectural and urban design.

 

BUSINESS UNITS CONSULTED AND AFFECTED:

The application has undergone a full circulation.  Comments have been incorporated into the report, draft by-law and draft conditions.

 

CONCLUSION:

Staff are generally satisfied with the configuration of the draft plan of subdivision and recommend that the plan be draft approved, subject to the conditions above and in Appendix ‘B’.

 

RECOMMENDED BY:

 

 

 

 

________________________                        ________________________

Valerie Shuttleworth MCIP, RPP                      Jim Baird MCIP, RPP

Director of Planning and Urban Design              Commissioner of Development Services

 

DOCUMENT:

Q:\Development\Planning\APPL\SUBDIV\01 110135 TUCCIARONI - CATHEDRAL\ReportTemplate_060426_v2.doc


 

ATTACHMENTS:


Figure 1- Location Map

Figure 2 – Air Photo

Figure 3 – Site Context and Zoning

Figure 4 – Proposed Draft Plan of Subdivision

Figure 5 – Phasing for Woodbine By-Pass

 

Appendix A – draft zoning by-law

Appendix B – draft conditions

 