Report to: Development Services Committee Date of Meeting: May 16, 2006
SUBJECT: Recommendation Report
Application
for Site Plan Control Approval
Ruland
Properties Inc. (The Remington Group)
Proposed
Markham
Centre, south side of
SC
06 108800
PREPARED BY:
RECOMMENDATION:
That the
report dated May 16, 2006, entitled “Recommendation Report, Application for Site Plan Control Approval
– Ruland Properties Inc. (The Remington Group) Proposed Office Building –
Honeywell Canada, Markham Centre, south side of Enterprise Boulevard ”
be received;
That the application for site plan control approval by Ruland Properties for a 5-storey, 14,320 square metre (155,000 square feet) office building to house Honeywell Canada’s corporate offices be endorsed in principle, subject to the conditions attached as Appendix A;
That
site plan approval be delegated to the Director of Planning and Urban Design or
her designate, to be issued following execution of a site plan agreement. Site Plan approval is issued only when the
Director has signed the site plan; and,
That Council authorize the enactment of a by-law to remove the Hold (H)
provisions on the subject lands and that the H removal by-law be enacted in
advance of a site plan and a subdivision agreement being executed, subject to
the Owner providing an undertaking to the Town, prior to lifting the H,
committing to execute a Subdivision Agreement and Site Plan Agreement to the
satisfaction of the Commissioner of Development Services and the Town
Solicitor.
EXECUTIVE SUMMARY:
This report recommends site plan control approval of the application by Ruland Properties (the Remington Group) for a 5-storey, 14,320 square metre (155,000 square foot) office building within their Downtown Markham project to accommodate the corporate offices of Honeywell Canada. In June, 2003, Council granted draft plan approval to the Remington Group’s comprehensive, mixed-used project ‘Downtown Markham’ project, which implements many of the Town’s objectives for Markham Centre.
The Honeywell building represents the first new office component within Downtown Markham, and the applicants have provided a concept as to how the balance of the lands within this block will ultimately be built-out, including provisions for future parking structures. The Honeywell office project is a very positive contribution to the prestige office employment base of Markham Centre, and efforts are being made to expedite approval.
While the project is consistent with the Downtown Markham precinct plan and the intent of the Markham Centre Zoning By-law, the applicant will be seeking relief from the by-law by way of minor variance to address several issues, including front yard setback and structured parking provisions. A consent application will also likely be required to create an individual development parcel for the purposes of the long-term lease and registration of various agreements.
Since the granting of draft plan approval, the Remington Group has been addressing certain technical issues associated with the conditions, prior to executing a subdivision agreement. Resolving these issues and other changes to the plan to introduce a park as the central component require amendments to the conditions of draft plan approval. These changes, which will be the subject of a future staff report, should not affect the processing of this site plan application.
In order to allow this development to proceed in advance of the developer’s group agreement being in place, the conditions of site plan control approval require the owner to provide an undertaking to the Town committing to execute a Developer’s Group Agreement and pay their proportionate share of the costs of community infrastructure and facilities relating to the Honeywell building.
The report also recommends that Council authorize the lifting of the Hold (H) in advance of the subdivision and site plan agreements being executed. This would allow processing of the application to continue through the summer recess of Council and provide for the issuance of building permits as soon as they are available. The early (H) removal would be conditional on the Owner providing an undertaking to the Town committing to execute the agreements.
The proposal will be reviewed by the Markham Centre Advisory, prior to final site plan approval, and requirements of the various commenting agencies have been included as conditions of approval.
FINANCIAL CONSIDERATIONS:
Not applicable
1.
Purpose 2. Background 3. Discussion 4.
Financial 5.
Environmental
6. Accessibility 7. Engage
21st 8. Affected Units 9. Attachment(s)
The purpose of this report is to discuss and make recommendations on an application for site plan control approval by Ruland Properties for a 5-storey, 14,320 square metre (155,000 square foot) office building within their Downtown Markham project to accommodate the corporate offices of Honeywell Canada.
In June,
2003, Council granted draft plan approval to the Remington Group’s comprehensive,
mixed-used project ‘Downtown Markham’.
It is a project, which implements many of the Town’s objectives for
Markham Centre, including protecting for the introduction of rapid transit
through the centre; respecting and enhancing the Rouge River valley; providing
for a internal road network; creating a series of new public spaces and urban
parks, including a large, urban central park as a new focus for Town-wide
activities and celebrations; and, providing for a variety of development
parcels to accommodate a wide range of uses.
Downtown
Markham will contribute to achieving the Markham Centre vision though the
introduction of up to approximately 362,750 square metres (3,904,736 square
feet) of office and business park uses, 33,755 square metres (363,348 square
feet) of grade-related retail and up to 3,889 residential units in a medium to
high density form.
The plan, which will be phased, anticipates an approximate
20 year plus build-out, and
provides for a series of residential and mixed-use neighbourhoods and local
parks. Office uses are strategically
located within three large blocks between
In July, 2004, the Markham Centre Zoning By-law (2004-196) was enacted to implement the Downtown Markham plan. This application represents another significant step in the development of Markham Centre and realizing the Town’s mixed use vision for an urban core.
Since the granting of draft plan
approval and enactment of the By-law, the applicant has been working towards
addressing certain technical issues associated with the conditions of draft
plan approval, prior to executing a subdivision agreement. Addressing these technical issues will likely
result in certain amendments to the conditions of draft plan approval, which
will be the subject of a future staff report.
In the meantime, the applicants are proceeding with obtaining phase one
site plan approvals to be in a position to finalize building permits, once the
subdivision agreement has been executed.
Project Description Including Block Build-out Concept
The applicants are proposing a
5-storey, 14,320 square metre (155,000 square foot) office building on the
south side of
It should be noted that the applicant is seeking a second signature tenant for this building which could result in additional floors being added. This should not alter the footprint of the building, nor affect the design concept or building materials. Staff will continue to work with the applicant to ensure an appropriate building massing and level of finishes.
This building represents the first
office component within this block and the applicants will be providing a
concept as to how the block will ultimately be built-out, including provisions
for future parking structures. The
concept will outline the balance of a building programme for the lands on the
south side of
Presently, surface parking only is proposed for the Honeywell building. Located behind a 30 metre landscaped setback, this parking is being provided at a ratio consistent with that of the new Markham Centre Zoning By-law No 2004-196 (specify ratio). The applicants are proposing this parking on a temporary basis until additional demand and office development warrants a parking structure.
Building materials consist of a
mix of elements, including a precast stone base material, a combination of
brick colours, spandrel glass, accented by aluminum columns and, panels on the
roof (see Figure 5). The
Zoning and Official Plan
The lands are designated Community Amenity Area within the Markham Centre Secondary Plan (OPA 21). The general Community Amenity Area policies in the Plan recognize a mix of residential, commercial, employment and community uses, including the proposed office building. The lands are zoned Markham Centre Downtown One MC-D1 Zone in the Markham Centre Zoning By-law, which implements the secondary plan policies and permits business offices and associated uses.
Variances / Consent will be Required
Notwithstanding the proposal is consistent with the Downtown Markham precinct plan and intent of the Markham Centre Zoning By-law, relief will likely be required to the by-law to address several issues. The by-law does not recognize the proposed colonnade in front of the building as its main wall, thereby necessitating relief to the front yard setback provisions of the by-law. The applicant’s intent to proceed initially with surface parking only, also necessitates relief to the by-law which specifies a maximum of 20 percent of the parking will be provided on the surface.
As noted, parking is proposed to be provided in accordance with the Markham Centre By-law. However, in order to address current market expectations for parking, the by-law contemplates a process whereby additional, short-term parking may be available through temporary use permission or by minor variance. A temporary by-law would be reported on separately to Council. In addition, a consent application may be required to create an individual development parcel for the purposes of the long-term lease and/or registration of various agreements.
Proceeding in Advance of a Subdivision Agreement
Draft plan approval for the
Remington Group’s comprehensive 98.3 ha Downtown Markham development was granted in
2003, and since then the applicant has been working towards addressing
certain technical issues associated with the conditions of draft plan approval,
prior to executing a subdivision agreement.
As a result of addressing these issues and other changes relating to
introducing a park as the central component of the plan, amendments to the
conditions of draft plan approval will be required. These amendments, which will be the subject
of a future staff report, should not affect the processing of this site plan
application. The conditions of site plan
approval require the Owner to provide an undertaking to the Town committing to
execute a Subdivision Agreement, which includes the subject lands, to the satisfaction
of the Town Solicitor and Commissioner of Development Services.
The Markham Centre Landowners Group Agreement has not been Executed
In order to allow this development to proceed in advance of the Developer’s Group Agreement being in place, the conditions of site plan control approval require the owner to provide an undertaking to the Town committing to execute a Developer’s Group Agreement and pay their proportionate share of the costs of community infrastructure and facilities relating to the Honeywell building, to the satisfaction of the Town Solicitor and Commissioner of Development Services. It is noted that this project does not require a servicing allocation, and is similar to other office developments which have been expedited in Markham Centre.
Hold (H) must be
Lifted
Consistent with the Markham Centre By-law, these lands are subject to a series of Hold (H) provisions relating to requirements which must be addressed including the completion of various studies, agreements and other financial obligations, prior to development occurring. In order to ensure that this building can proceed as expeditiously as possible, particularly, given the summer meeting schedule, staff are recommending that Council authorize the lifting of the (H) in advance of the subdivision and site plan agreements being executed. This would allow processing of the application to continue through the early summer and provide for the issuance of building permits as soon as they are available. The early (H) removal will be conditional on the Owner providing an undertaking to the Town committing to execute the agreements to the satisfaction of the Commissioner of Development Services and the Town Solicitor.
Markham Centre Advisory Group will Review the Proposal
This project is scheduled to be
presented to the Markham Centre Advisory on
Departmental/Agency Comments
The application has been
circulated to relevant agencies and municipal departments for review and
comment.
The Ministry of Transportation in
reviewing this proposal has requested the applicant address the draft plan
conditions, prior to proceeding with the office component. In this regard, staff note that the applicant
continues to address the conditions of draft plan approval and that as a
condition to site plan approval for the Honeywell building, staff require the
applicant to enter into an undertaking committing to execute the subdivision
agreement.
Fire Services advise that yard
hydrants and a
In order to provide full movement
access to the Honeywell site in advance of the construction of the
FINANCIAL TEMPLATE (Separate Attachment):
Not applicable
ENVIRONMENTAL CONSIDERATIONS:
This proposal will be evaluated against the Markham Centre Performance Measures. Issues of Green Infrastructure will continue to be addressed in concert with the Advisory’s on-going review of this and other applications in Downtown Markham. The project will connect to district energy.
There are no accessibility implications for the
Town in this report.
ENGAGE 21ST CONSIDERATIONS:
The
proposal aligns with the following key Town of
BUSINESS UNITS CONSULTED AND AFFECTED:
CONCLUSION:
The
Honeywell building represents a significant step in the development of Markham
Centre as a truly mixed-use community, and in the Town achieving its vision of
a dynamic, transit supportive, people-friendly and sustainable downtown.
RECOMMENDED BY:
________________________ ________________________
Director of Planning and Urban Design Commissioner of Development Services
Figure
1: Site Location
Figure
2: Area Context and Zoning
Figure
3: Aerial Photo
Figure
4: Proposed Site Plan
Figure
5: Proposed Elevations
Figure
6: Draft Block Plan
Appendix A:
Conditions of Site Plan Approval
Q:\Development\Planning\Teams\Markham
Centre\Coordinator\Remington\Honeywell Site Plan Recommendation Report.doc
Appendix A- Conditions
of Site Plan Approval
1. That prior to final site plan approval, the Owner provide an undertaking to the Town and Trustee of the Markham Centre Developers Group committing to execute a Developer’s Group Agreement and pay their proportionate share of the costs of community infrastructure and facilities in the Markham Centre area on a pro rata basis relating to the Honeywell building prior to site plan approval to the satisfaction of the Town Solicitor and Commissioner of Development Services;
2. That the Owner revise the building elevations and site plan to address the concerns raised by staff and the Markham Centre Advisory Committee to the satisfaction of the Commissioner of Development Services;
3. That the Owner revise the site plan to comply with the applicable zoning, or shall obtain variances for relief from the setback and other requirements of the by-law, including a possible temporary use permission for additional surface parking, to accommodate the building programme, as described in this report;
4. That the Owner enter into a Site Plan Agreement with the Town, containing all standard and special provisions and requirements of the Town and other public agencies, including the specific requirements identified in the staff report, prior to site plan approval or any land severance coming into full force and effect, including providing for the following:
·
That the Owner enter into an easement agreement
respecting access, egress, parking and other related shared facilities to the
satisfaction of the Commissioner of Development Services;
· That the Owner prepare an overall utility plan (Composite Utility Plan) to the satisfaction of the Town for this block. The plan shall comply with the approved streetscape design criteria for Markham Centre, and minimize the exposure of above grade service structure/equipment to the satisfaction of the Commissioner of Development Services;
· That the Owner provide and implement a comprehensive TDM plan which clearly identifies bike parking, carpool parking, provision of shower facilities for office staff using alternate forms of transportation and any other measures to promote alternative modes to the single occupant vehicle;
· That the Owner provide and implement a comprehensive Green Infrastructure plan which provides for connection to the District Energy network to the satisfaction of the Commissioner of Development Services;
5. That the Owner pay all applicable
fees, local service contributions, Town Wide and Area Specific Development Charges
and make arrangements to satisfy financial obligations related to applicable
Landowner/Developers Group Agreements, prior to the issuance of permits;
6. That prior to site plan approval the Owner satisfy cash-in-lieu of parkland obligations for the office building, in accordance with the Parkland Principles for Markham Centre and pursuant to the Markham Centre Secondary Plan, to the satisfaction of the Commissioner of Development Services.
7. That prior to the execution of the site plan agreement, the Owner shall submit final drawings including, but not limited to, site plans and elevation drawings, parking layout plan, grading, servicing and engineering drawings that comply with all requirements of the Town and authorized public agencies, to the satisfaction of the Commissioner of Development Services;
8. That the Owner submit a Landscape Plan, including a detailed lighting submission, prepared by a Landscape Architect, having O.A.L.A. membership for approval by the Commissioner of Development Services, prior to the execution of the site plan agreement;
9. That the location, size and construction of all refuse storage areas and recycling facilities, and arrangements for waste collection be to the satisfaction of the Town of Markham Waste Management Department;
10. That provisions for Fire Routes, yard hydrants, Siamese connections and other emergency access requirements be to the satisfaction of the Fire Department;
11. That provision for snow storage, sidewalk alignment and maintenance be to the satisfaction of the General Manager of Operations and Director of Engineering;
12. That the Owner provide and implement a detailed stormwater management plan, including quality control measures/devices to the satisfaction of the Director of Engineering;
13. That the Owner comply with all requirements of the Town and authorized public agencies, including PowerStream and MTO to the satisfaction of the Commissioner of Development Services;
14. That the Owner participate in
the enhanced hoarding programme for Markham Centre and that staff be authorized
to enter into a Hoarding Agreement with the Owner;
15. That Town support for minor
variances to the oversupply of parking be conditional on the parking surplus
being provided on a three-year temporary basis;
16. That
the Owner explore opportunities for shared access with the Motorola site and
that the break in the Enterprise Boulevard median to accommodate full movement
access to the Honeywell site be temporary only until Birchmount Road is extended
and/or alternate arrangements are available through the Motorola site; and,
17.
That this
endorsement shall lapse and site plan approval will not be issued, after a
period of three years commencing