Report to Development Services Committee                               Date of Meeting: May 2, 2006

 

 

SUBJECT:                          RECOMMENDATION REPORT

                                            Official Plan, rezoning and site plan applications by Forest Bay Homes Ltd., to permit a four storey condominium apartment building on the west side of Markham Road, north of Denison Street

 

PREPARED BY:               Nick Pileggi, Senior Planner, extension 4480

 

 

RECOMMENDATION:

THAT the Official Plan amendment application (OP 03-116717) submitted by Forest Bay Homes Ltd. for lands north of Denison Street, on the west side of Markham Road, be approved and the draft Official Plan amendment attached as Appendix ‘B’ be finalized and adopted;

 

THAT the zoning by-law amendment application (ZA 03-116709) to amend By-law 90-81 as amended, submitted by Forest Bay Homes Ltd. to permit a four-storey apartment building on the west side of Markham Road, north of Denison Street, be approved and the draft Zoning By-law amendment attached as Appendix ‘C’, be finalized and enacted;


THAT Forest Bay Homes Ltd. be granted a servicing allocation of 52 units, as per the November 22, 2005 servicing allocation strategy endorsed by Council on November 29, 2005;

 

THAT the applicant agree to pay their proportionate share of the Hwy. 48 flow control measures, to the satisfaction of the Director of Engineering;

 

THAT the Town reserves the right to revoke or reallocate servicing allocation should the development not proceed in a timely manner;

 

THAT the Site Plan application (SC. 03-116723) submitted by Forest Bay Homes Ltd. to permit a four-storey apartment building on the west side of Markham Road, north of Denison Street, be endorsed in principle, subject to the general and specific conditions in Appendix ‘A’.

 

 

EXECUTIVE SUMMARY:

The owner has submitted applications for Official Plan amendment, zoning by-law amendment and site plan approval to permit a 52-unit four-storey apartment building on the west side of Markham Road, north of Denison Street.  The proposed development is part of a larger block in a draft approved plan of subdivision and has been the subject of approved applications to permit a gas station, drive through restaurant and a 133 unit semi-detached/townhouse development.

 

A detailed review of the proposed development by internal and external departments determined the following issues and concerns have now been resolved:

·        The site plan is consistent with the Markham Road Corridor Study vision;

·        The site has been adequately integrated with the commercial uses to the south, and no links have been provided to the development to the west in order to reduce flow through traffic;

·        Traffic impact study has been completed and the recommendations have been implemented;

·        Stormwater management requirements have been addressed.

 

Staff have prepared draft Official Plan and Zoning By-law Amendments (Appendix ‘A’ and ‘B’) to implement the proposed development.  Staff are generally satisfied with the site plan and elevations for the proposed building.

 

 

FINANCIAL CONSIDERATIONS:

Not applicable.

 


1. Purpose                2. Background         3. Discussion             4. Financial         5. Environmental

 

6. Accessibility       7. Engage 21st             8. Affected Units       9. Attachment(s)

 


PURPOSE:


The purpose of this report is to recommend approval of the proposed Official Plan amendment, zoning by-law amendment and site plan applications by Forest Bay Homes Ltd. to permit a 52-unit four-storey apartment building on the west side of Markham Road, north of Denison Street.



 

BACKGROUND:


Subject lands and area context

The subject lands comprise approximately 0.72 hectares (1.8 acres) of a 6.1 hectare (15.1 acre) parcel north of Denison Street, west of  Markham Road (Figure 1).  The 6.1 hectare parcel is identified as a commercial block (Block 554) on the predominantly residential plan of subdivision 19T-89126, which was draft approved in 1994.  All lots and blocks within 19T-89126 have been registetred with the exception of Block 554, which is currently in the process of being registered.

 

 

Three separate development applications were submitted for the lands within Block 554 as follows and as shown in Figure 2:

§         commercial development, consisting of a gas station (Petro Canada) and drive-through restaurant (Tim Hortons), was approved and is now in operation, at the northwest corner of Denison Street and Markham Road;

§         a 133 unit semi-detached, condominium townhouse development on private roads, which was approved by Council in March 2006; and

§         the subject parcel, which is proposed to contain a four storey, 52-unit apartment building.

 

This report deals only with the proposed apartment building.  The subject lands are within the easterly portion of Block 554, with approximately 83.5 metres of frontage on Markham Road.  The lands are currently vacant.  Surrounding land uses include a contractors yard to the north, future low density residential development and a site intended for a future place of worhsip to the east across Markham Road, a restaurant and gas station to the south, and the vacant lands approved for the 133 unit semi-detached/townhouse development to the west.  (Figures 3)

 

Proposal consists of a four-storey condominium apartment building containing 52 units

The proposal is for a four-storey condominium apartment building containing 52 units, consisting of 4 one-bedroom, 40 two-bedroom and 8 three bedroom apartments.    The proposed density is 72 units per hectare (29 units per acre).  The proposed floor space index is 1.2.

 

The proposed development will have one full-moves access from Markham Road.  Access to Denison Street is possible through the commercial development to the south.   The parking by-law requires 78 parking spaces, whereas, 100 parking spaces are provided, with 64 surface parking spaces and 36 underground parking spaces.  Four of the surface parking spaces are reserved for the physically disabled (Figure 4).

 


 

OPTIONS/ DISCUSSION:


Markham Road Corridor Study vision approved in June, 2003

The subject lands were within the study area of the Markham Road Corridor Study, which was initiated in 2002 to develop an urban design vision for the Markham Road corridor between 14th Avenue and Steeles Avenue.  The resulting vision, adopted by Council in June, 2003, includes urban design guidelines for development along Markham Road.  The vision calls for a high density residential development in this area.  The proposed development is consistent with the vision as outlined in the Markham Road Corridor Study. 

 

Official Plan and Zoning by-law amendments

The subject lands are designated Community Amenity Area in the Armadale East Secondary Plan (PD-24-2), which provides for medium and high density residential development at appropriate locations.   The proposed apartment development complies with the Community Amenity Area designation.  However, as only residential uses are proposed, it is recommended that the Official Plan and Secondary Plan be amended to reflect an Urban Residential designation on this site, rather than a Commercial designation.  A draft Official Plan Amendment to designate the lands Urban Residential in the Official Plan and Urban Residential – High Density II in the Secondary Plan is attached as Appendix ‘A’.

 

The subject lands are zoned Community Commercial (CC) in By-law 90-81, as amended, which permits a shopping centre.   A draft amendment to Zoning By-law 90-81, as amended, to permit the proposed residential development is attached as Appendix ‘B’.  

 

Site Plan is consistent with the Markham Road Corridor Study and is acceptable

The proposed apartment building is consistent with the vision for Markham Road as outlined in the approved urban design guidelines.  The vision calls for development along Markham Road, particularly between Denison Street and Highglen Avenue, to provide a strong building street wall, with buildings set close to the street, providing visual interest and a diversity of uses along the street.   In addition, all building types should have direct pedestrian access to Markham Road to encourage pedestrian activity on the street  (Figure 4).

 

The proposed development provides a strong building presence along Markham Road.  The building is a maximum 8.7 metres (28 feet) from the front property line, at the north end (Figure 5).  The building will have direct access to a future sidewalk along Markham Road.  The building provides visual interest through the use of glazing, balconies and a varied façade. The building is proposed to be constructed with a mix of stucco, stone and glass facades (Figure 5).  Staff is generally satisfied with the site plan and elevations for the proposed development.

 

The proposed development also complies with the vision in terms of building height.  The urban design guidelines call for building heights on Markham Road generally not to exceed four storeys, which is the proposed height of this development (Figure 5).

 

The design guidelines also indicate that, whenever possible, parking should be located to the side and rear of buildings or in below-grade parking structures, and that access points should be consolidated as much as possible through shared driveways to minimize disruption of the public sidewalk.  Parking for the proposed development is located to the rear of the building, and in an underground parking structure which has access from the rear of the building.  The proposed access from Markham Road is a shared access with the commercial site to the immediate south.  In addition, the building has access to Denison Street through the commercial site. (Figure 4)

 

Issues in the January 20, 2004 staff report, March 2, 2004 Public Meeting and March 29, 2004 Public Information Meeting have been addressed

Concerns raised in the preliminary staff report, Public Meeting and a subsequent Public Information meeting, and in correspondence, are addressed below:

 

 

 

Integration of the commercial, apartment and semi-detached condominium sites

The proposed apartment site shares a common driveway off Markham Road with the commercial development to the south.  Access to Denison Street is also permitted through the commercial development to the south.  No vehicle access is proposed between the semi-detached condominium site to the west and the subject site, as this  would interfere with internal traffic circulation on these sites, or cause undesired infiltration from the commercial sites through the proposed residential semi-detached development. Pedestrian connections between the semi-detached condominium development and the commercial and apartment development to the east have been provided.

 

Traffic impact study completed and recommendations implemented

A traffic impact study for all three applications on Block 554 was submitted at the time of the approval of the commercial development at the Markham Road/Denison Street intersection.  The traffic study concluded that the subject development can be operationally accommodated based on a full moves access driveway at Markham Road (Figure 4) and a right in, right out access from the adjacent commercial development to the south, which is already in operation.  Recommended improvements to the Markham Road, Denison Street intersection (realignment) have been completed as part of the commercial development to the south.  The traffic study has been reviewed and approved by the Town and the Region.

 

 

Stormwater management requirements have been addressed

A concern was expressed by the public that alteration of the site would cause flooding on adjacent properties.  Currently, lands to the north and west drain onto Block 554.  A stormwater management report has been prepared to identify stormwater drainage design for the proposed developments within Block 554 as well as any required revisions to the storm drainage plan and overland flow routes for the larger subdivision.  The applicant has proposed a revised overland flow and drainage scheme along the north property line, which would allow for relatively flat grading at the north end of the building.  This scheme is currently under review by the Engineering Department.  A final revised stormwater management report, incorporating modifications agreed to with the applicant, is to be submitted and any requirements arising from it will be addressed as conditions of site plan approval.  The adjoining properties should not experience stormwater impacts as a result of this development.

 

Servicing Allocation

On November 22, 2005, Development Services Committee approved a new servicing allocation strategy.  The proposed 52 unit development was granted full allocation through the November 22, 2005 report. 

 

 


 

FINANCIAL TEMPLATE (Separate Attachment):


Not applicable

 

 


ENVIRONMENTAL CONSIDERATIONS:


The subject lands are not located within the Toronto and Region Conservation Authority (TRCA) Screening Zone, however, the TRCA was circulated the stormwater management plan for the proposed development and have agreed to the stormwater scheme to service this development and has no objections to the proposed applications on the subject lands.


 

 

 


ACCESSIBILITY CONSIDERATIONS:


The site plan and landscape plans have been reviewed for conformity with the accessibility guidelines.   Elevators, parking spaces for the disabled and ramp curbs have been provided at appropriate locations.


 

 


ENGAGE 21ST CONSIDERATIONS:


The proposed development promotes a number of key goals set out in “Engage 21st Century Markham” by providing for efficient use of infrastructure, transit-supportive land use patterns and density, compact development and high levels of architectural and urban design.  

 

 


BUSINESS UNITS CONSULTED AND AFFECTED:


These applications have been circulated to all Town departments and external agencies and all comments have been considered in this report and reflected, as required, in the conditions of site plan approval. 

 

 

RECOMMENDED BY:  

 

 

________________________                                    ________________________

Valerie Shuttleworth, M.C.I.P., R.P.P.                          Jim Baird, M.C.I.P., R.P.P.

Director of Planning and Urban Design              Commissioner of Development

                                                                                    Services

 



 

ATTACHMENTS:


Figure 1: Location Map

Figure 2: Area Context/Zoning

Figure 3: Aerial Photo 2005

Figure 4: Site Plan

Figure 5: Elevations

 

Appendix A – Draft Official Plan Amendment

Appendix B – Draft Zoning By-law

 

 

DOCUMENT FILE PATH:

Q:\Development\Planning\APPL\ZONING\03 116709 Forest Bay Denison\apartment\Final Report Template_forest bay apts

APPENDIX FILE PATH: Q:\Development\Planning\APPL\ZONING\03 116709 Forest Bay Denison\apartment\ OPA denison apt may 06

Q:\Development\Planning\APPL\ZONING\03 116709 Forest Bay Denison\apartment\ by-law denison apt

 

 

APPLICANT:             Forest Bay Homes Ltd

                                                1151 Denison   Street, Unit 18

                                                Markham, ON

                                                L3R 3Y4

 

AGENT:                                 Stephen Armstrong                               Tel: 416-332-7548

                                                Armstrong Goldberg Hunter                  Fax: 905-882-2069

9251 Yonge Street                                          

                                                Suite 302

                                                Richmond Hill, Ont.

                                                L4C 9T3                                 


APPENDIX ‘A’

 

1.      THAT site plan approval be delegated to the Director of Planning and Urban Design or her designate, to be issued following execution of a site plan agreement.  Site Plan approval is issued only when the Director has signed the site plan “approved”;

 

2.      That the final site plan and elevation drawings be submitted to the satisfaction of the Director of Planning and Urban Design, including the following revisions, if required:

a.       any revisions required to implement the recommendations of the traffic impact study, noise study and stormwater management study.

 

3.      That a Landscape Plan, prepared by a Landscape Architect having O.A.L.A. membership, be submitted to the satisfaction of the Director of Planning and Urban Design;

 

4.      That the Owner comply with all requirements of the Town and authorized public agencies, to the satisfaction of the Director of Planning and Urban Design, including fulfillment of the conditions of draft approval for plan of subdivision 19T-89126, as they pertain to Block 554;

 

5.      That the Owner enter into a site plan agreement with the Town, containing all standard and special provisions and requirements of the Town and public agencies including the following:

a.       Provision for the payment by the Owner of all applicable fees, recoveries, development charges, cash in lieu of parkland and financial obligations related to applicable Developers Group Agreements;

b.      Submission of a noise study and implementation of any recommended mitigation measures to the satisfaction of the Town;

c.       Submission of a final traffic impact study, incorporating the revisions required by the Town and the Region, including conveyance of any required road widenings, to the satisfaction of the Town;

d.      Submission of a final stormwater management report incorporating the revisions required by the Town, including the overland flow scheme at the north end of the property, to the satisfaction of the Town; and

e.       Conveyance of any additional required drainage easements identified in the stormwater management report.

 

6.   And that this endorsement shall lapse and site plan approval will not be issued, after a period of three years, commencing May 16, 2006, in the event that a site plan agreement is not executed within that period.