CORNELL ADVISORY GROUP
MINUTES OF MEETING –
Attendees: |
Company/Agency: |
|
|
Jack Heath |
Regional Councillor |
John Webster |
Ward 5 Councillor |
Renee Torrington |
President, Cornell Ratepayers
Association |
|
Cornell Ratepayers Association
|
Robert Baird |
President,
Sherwood-Amberglen Ratepayers Association |
|
The Old Markham Village
Ratepayers Inc. |
Al Bishop |
Landowner Rep – Trustee,
Developers Group |
|
Landowner Rep – Cornell
Rouge |
Dan Leeming |
|
Christine Joe |
|
David Clark |
|
|
|
Kevin Huang |
|
Carolyn Woodland |
|
|
Town of |
Valerie Shuttleworth |
Director of |
Jim Jones |
Regional Councillor |
Biju Karumanchery |
Manager, East District |
Marg Wouters |
Senior Planner, East
District |
Wendy Bond |
Administrator |
Chair: Councillor John Webster
·
The motion to
accept the November 20, 2006
·
A copy of the
presentation “Cornell Business Park Interface with
2. Business
Arising from Minutes: Issues addressed
by Val Shuttleworth and Marg Wouters
Ø
Proposed land use designation at southeast corner of Hwy.
7 and 9th Line: The triangular piece of land at this corner is owned
by the Province (MTO) and will be designated Open Space in the updated draft
Secondary Plan. The ownership of the
rectangular parcel of land immediately to the south of the triangle (either the
Town or the Region) is to be confirmed. The portion of this parcel along 9th
Line will be designated Open Space, as a continuation of the 9th
Line Greenway. The designation of the remainder
of the rectangular parcel, for either residential or open space uses or a
combination of the two, is still under review.
The appropriate use for the remainder of the parcel will be determined
as part of the review of detailed plans for the completion of the residential
component of the Lindvest lands immediately to the south.
Discussion:
·
It was requested
that a special treatment be considered for the open space at the southeast
corner, given the prominence of the corner.
Remnant parcels at the northwest
corner of Hwy 7 and 9th Line and along Hwy 407 were also
discussed. The Advisory Group would prefer
all three parcels be designated as park/open spaces.
Action:
·
Staff will follow
up with MTO with respect to future plans for the open space(s).
·
Park development
staff will be asked to review the proposed open space at the southeast corner
of Hwy 7 and 9th Line and make recommendations for an appropriate
treatment.
Ø
Timing of the Master Servicing Study: The Cornell
Developers Group has initiated an update to the Master Servicing Study. Staff will be meeting with the Developer Group
representative and the consultant to discuss details.
Ø
MTO Intersection
Ø
Cornell Fire Hall:
There are no plans to build a
fire hall in Cornell area at this time. A
site for the proposed fire hall has not yet been acquired. Discussion ensued regarding current response
times and alternatives to improve service until the fire hall is built.
Ø
Proposed swap of the YRDSB and
would
therefore consider a swap of their site with the YCDSB site further south only if
there was a compelling operating reason for them to do so. It was suggested that the Advisory Group
have further discussions with the YCDSB regarding possibilities for shared uses
on their proposed high school site across from the proposed community
centre.
Action:
·
YCDSB (
1. Non
Lane-Based Products: Joint Presentation
by Val Shuttleworth (Town of
Val Shuttleworth provided the following introduction:
·
Mattamy’s proposal
for non lane-based housing was presented at Development Services Committee on
·
Residential development
in Cornell to date has been entirely rear lane based. First phases totaling approximately 1,900
units have been built. A review of the
Secondary Plan is currently taking place in order to conform with current
Provincial and Regional policy directions, finalize parkland and open spaces,
integrate current initiatives associated with the Master Plan for Markham
Stouffville Hospital, the East Markham Community Centre, Rapid Transit, Eastern
Markham Strategic Review and to address requests from landowners for non lane-based
housing.
·
Non lane-based
housing has been under discussion with developers and staff for a number of years. Developers have advocated non lane-based
housing as a means of broadening the range of housing options (i.e., larger
homes) in Cornell. Mattamy Homes have
developed a plan and draft development principles for their Phase 4
neighbourhood which would include non lane-based housing.
·
The proposed Phase
4 neighbourhood is designed as a comprehensive neighbourhood that is consistent
with the new urbanism principles of defined neighbourhood edges, walkability
and intergrated roads and open space, and linkages with other neighbourhoods. A park provides the central focus for the
neighbourhood. A mix of lot sizes are proposed including 36
ft, 44ft, 50ft and 60ft frontages. The
largest lots (60 ft) are proposed to frame the park. Garage presence from the street is minimized
by locating driveways on flankages, and by recessing garages and parking pads
or screening with architectural elements.
Val Shuttleworth outlined draft principles being
considered for inclusion in the Secondary Plan and the next steps as follows:
·
The draft
principles provide for non lane-based housing which would, among other things:
broaden the housing product mix; comply with the principles of new urbanism; be
consistent with the Cornell community to date in terms of building siting,
architectural styles and streetscapes; provide a central public open space
amenity; provide a dominant presence for large lots; minimize the visual impact
of the garage to the street and driveway; and limit the opportunity for parking
on the driveway.
·
The Town will
continue to work with Mattamy on the proposed neighbourhood plan.
Discussion:
·
Overall reaction
to presentation was positive.
·
Topics of
discussion included: strategies to prevent homeowners from widening their
driveways, or parallel parking on the driveway apron; the location of utility transformers
and other utilities; relative amounts of permeable area within lane-based vs
non lane-based development; impact on on-street parking; appropriate mix of lots;
how to limit permissions for this type of product; and garage size.
3. Next
Meeting:
·
·
Tentative agenda
item: revised draft Secondary Plan
Adjourned