Report to: Development Services Committee Date of Meeting: May 15, 2007
SUBJECT: RECOMMENDATION REPORT
Application for Site Plan
approval for a private school with associated student residence - J.
File Number: SC 05-011975
PREPARED BY: Doris Cheng, Planner II – West District, extension 2331
RECOMMENDATION:
THAT the staff report entitled “RECOMMENDATION REPORT: Application for Site Plan approval for a private school with associated student residence, J. Addison School, 2 Valleywood Drive, File Number SC 05-011975”, be received.
THAT site plan application SC 05-011975,
be endorsed in
principle, subject to conditions attached as Appendix ‘A’ to this report;
THAT site plan approval be delegated to
the Director of
AND THAT Staff be authorized and directed to do all things necessary to give effect to this resolution.
FINANCIAL CONSIDERATIONS:
Not applicable
1. Purpose 2. Background 3. Discussion 4. Financial 5. Environmental
6. Accessibility 7.
Engage 21st 8. Affected Units 9.
Attachment(s)
Proposal is for
Private School and Temporary Classroom Building
Official Plan and Zoning By-law Amendments have been approved by Council
Heritage
The development is within the Buttonville Airport
Zoning Regulation
With these changes, Staff considers
the proposed site plan acceptable.
There are no accessibility considerations associated with this application.
BY: ________________________ ________________________
Valerie Shuttleworth, M.C.I.P, R.P.P Jim
Baird, M.C.I.P, R.P.P
Figure 2 – Area Context and Zoning
Figure 5 –
Site Plan –
Appendix ‘A’ – Conditions for Site Plan Control Approval
APPLICA
\\MARKHAM.CA\APPS\AMANDADOCS\PLANNING\SAVEPATH\23543227063.DOC
Appendix ‘A’ – Conditions of Site Plan Endorsement
1. THAT the Owner shall enter into a Site Plan Agreement with the Town, containing all standard and special provisions and requirements of the Town and other public agencies, prior to final site plan approval, including the payment of all applicable fees, recoveries, development charges and cash-in-lieu of parkland;
2.
THAT prior to the execution of the site plan agreement,
the Owner shall submit final site plan and elevation drawings which include
building materials, colours and details, for endorsement by the Director of
3.
THAT prior to the execution of the site plan agreement,
Landscape Plans, including streetscape details, prepared by a Landscape
Architect having membership with the Ontario Association of Landscape Architects
shall be submitted to the Commissioner of Development Services for approval and
inclusion in the Site Plan Agreement.
The landscaping shall be installed properly, cared for and maintained to
the satisfaction of the Town;
4. THAT prior to final site plan approval, the owner submit a certificate, from a qualified land surveyor, confirming that the proposed development complies with the Buttonville Airport Zoning Regulation;
5. THAT the Owner obtain all necessary approvals from the Regional Municipality of York Transportation and Works Department, and further that the Owner provide confirmation the height of the buildings meets the requirements of Transport Canada, including applicable warning clauses;
6. THAT the Owner submit final engineering drawings to the Engineering Department for approval, prior to the Director of Planning and Urban Design stamping the site plan ‘approved’. Drawings are to be prepared and stamped by a Professional Engineer with a Certificate of Authorization from Professional Engineers of Ontario.
7. THAT the location, size and construction of all refuse storage areas and recycling facilities, and arrangements for waste collection be to the satisfaction of the Town of Markham Waste Management Department;
8. THAT prior to final site plan approval, the Owner shall meet with the Fire Department to finalize the location of fire access routes, signage, yard hydrants, siamese connections, rapid entry key box and other emergency access requirements to the satisfaction of the Fire Department;
9. THAT provision for snow storage, sidewalk alignment and maintenance be to the satisfaction of the Manager of Operations and Director of Engineering;
10. THAT the Owner pay for all costs associated with the relocation of utilities within the right-of-way, as may be required;
11. THAT the Owner provide and implement erosion control measures during construction and obtain a Topsoil Removal Permit to the satisfaction of the Director of Engineering;
12. THAT the temporary building be
removed, services capped, and the site restored as a play field prior to the
occupancy of the main building;
13. THAT solid hoarding be erected
around the construction site to the satisfaction of the Commissioner of
Development Services;
14. THAT vehicular
access to the Heritage Schoolhouse remain free and clear of obstructions during
the construction of the main building;
15. THAT
this endorsement shall lapse and site plan approval will not be issued after a period of three
years commencing
FIGURE 1: