Report to: Development Services Committee Report Date:
SUBJECT: RECOMMENDATION REPORT
Applications
for Zoning By-law Amendment and Site Plan Approval to permit business and
professional offices at
Hunster Corporation
ZA 05 023385 & SC 05 023455
PREPARED BY: Sabrina Bordone, Planner
West District Team
RECOMMENDATION:
THAT the staff report entitled “Applications for Zoning By-law Amendment and Site Plan Approval to permit business and professional offices at 107-111 Glen Cameron Road, Hunster Corporation, ZA 05 023385 & SC 05 023455” be received;
THAT the Zoning By-law Amendment
application (ZA 05 023385) to amend By-law 2237, as amended, submitted
by Hunster Corporation to permit business and professional offices at 107-111
Glen Cameron Road, be approved and the draft Zoning By-law Amendment attached
as Appendix ‘A’ be finalized and enacted;
THAT the Site Plan
Control Application (SC 05 023455) submitted by Hunster Corporation to permit
business and professional offices at 107-111 Glen Cameron Road, be endorsed in
principle, subject to the conditions attached as Appendix ‘B’;
AND that site plan approval
be delegated to the Director of Planning and Urban Design or her designate, to
be issued following execution of a site plan agreement. Site Plan approval is issued only when the
Director has signed the site plan “approved”.
EXECUTIVE SUMMARY:
The 0.38 hectare (0.95 ac) site is located east of
Rezoning and site plan approval applications have been
submitted by Hunster Corporation to permit the construction of
a 2, 373 m2 (25, 548 ft2) three-storey business and
professional office building. A total of
64 surface parking spaces will be provided in accordance with the Town’s
Parking Standards By-law. The two
existing vehicular accesses off
The Official Plan designates the lands
“Industrial”. This designation is
further refined by the Thornhill Secondary Plan to “Business Corridor Area –
Glen Cameron/Doncaster”. The Thornhill
Secondary Plan provides for offices, commercial schools, and banks and
financial institutions, among other uses within this designation. The proposal to rezone the subject lands to
permit business and professional offices is consistent with the Thornhill
Secondary Plan.
The proposed rezoning and site plan approval
applications are considered appropriate for the development of the subject
lands. The subject lands are situated in
an established industrial area that is in need of revitalization. Staff believe that the proposal will act as a
catalyst to facilitating improvement in the area. In this regard, staff recommends that the
draft Zoning By-law Amendment attached as Appendix ‘A’ be finalized and enacted
and that the Site Plan application be endorsed in principle subject to the conditions
attached as Appendix ‘B’.
FINANCIAL CONSIDERATIONS:
Not applicable
The purpose of
this report is to review the proposed Zoning By-law Amendment and Site Plan
applications submitted by Hunster Corporation to permit a business and
professional office building at
Property and Area Context
The 0.38 hectare (0.95 ac) subject lands contain a
vacant single-storey industrial building located east of
Surrounding land uses include: the Canadian
National Railway (CNR) to the south and east, industrial buildings to the west,
and single-detached dwellings to the north (Figures 2 & 3).
Proposal is to permit business and professional offices
The applicant is
proposing to demolish the existing single-storey industrial building and
replace it with a 2, 373 m2 (25, 548 ft2) three-storey office
building. A total of 64 surface parking
spaces will be provided on site in the front, side and rear yards of the
site. Vehicular access will be from two
existing accesses off
The Official Plan designates the lands
“Industrial”. This designation is
further refined by the Thornhill Secondary Plan to “Business Corridor Area –
Glen Cameron/Doncaster”. The Thornhill
Secondary Plan stipulates that uses provided for within the “Business Corridor
Area – Glen Cameron/Doncaster” designation includes offices, commercial
schools, and banks and financial institutions, among other uses.
The
lands are zoned “Industrial” (M) by By-law 2237, as amended, which permits a
variety of industrial uses, but not office uses. The proposed amendment will rezone the lands
to permit business and professional offices on the subject lands.
OPTIONS/DISCUSSION:
Issues
at Public Meeting have been addressed
On
Sufficient on-site parking has been provided
The Parking Standards By-law requires that parking
for business and professional offices be provided at a rate of 1 parking space
per every 30 m2 of net floor area.
The net floor area of the proposed building is 1,920 m2
(20,671 ft2); therefore, a total of 64 parking spaces are required.
At the time of the public meeting, the parking
requirement for the proposed development was 56 parking spaces. A total of 48 parking spaces were to be
provided on site, fourteen of which were accommodated within an enclosed
parking area that was to be provided through the conversion of a portion of the
first storey of the building. This
represented a parking deficiency of 14%.
In order to provide the required parking, the
applicant purchased a 7.6 m (24.9 ft) wide strip of land from CN Rail, along
the entire length of the south property line.
In November 2006, the Committee of Adjustment approved the required
severance allowing the applicant to provide a total of 64 parking spaces on
site, in accordance with the Parking Standards By-law. Staff are satisfied with the proposed parking
layout, but note that one additional handicap parking space is required on the
site plan. Staff have requested that the
applicant revise the site plan accordingly.
Concerns related to site access and traffic
have been addressed
Vehicles will access the property via the two
existing driveways off
As originally proposed, the easterly driveway
encroached into the municipal boulevard.
Since the applicant has acquired additional lands from CN Rail, the
easterly driveway can now be accommodated without any encroachment on Town
land.
The analysis undertaken by BA Consultants also
recommended additional measures to ensure unobstructed sight lines at this
entrance including: i) that any new
tress planted on site be a minimum of 3 metres south of the Glen Cameron Road
edge of pavement, ii) that any tree canopy (including future tree canopies)
less than 3 metres south of the Glen Cameron Road edge of pavement must be a
minimum of 1.05 metres above grade (driver’s eye level), and iii) that any
shrubs planted within three metres of the Glen Cameron Road edge of pavement
must not grow taller than 0.5 metres.
Staff have reviewed these measures and will incorporate them into the
review of the landscape plans.
On-site landscaping
At the time of the public meeting, staff were
concerned about the minimal amount of on-site landscaping proposed due to the
limited site area. However, this issue
has been resolved through the purchase of additional lands from CN Rail,
allowing additional landscaping to be provided on site, primarily along the
front property line. This enhanced landscaping,
which will consist of coniferous trees and shrub planting, will provide a
buffer to the adjacent parking area. The
applicant is also providing new street tree planting along
Recycling bins and parking bicycle parking
In her letter dated
The applicant has also provided a bicycle parking
area at the east façade of the proposed building, also shown on the site
plan. As per staff’s recommendation, the
applicant has also extended the roof overhang along the east façade in order to
ensure the bicycle parking area will be adequately protected from the elements. Staff are satisfied that bicycle parking has
been addressed satisfactorily.
Proposed
building elevations are acceptable
The proposed three-storey building provides a
strong building presence along
The main building entrance is defined by a tower
element comprised of glass and spandrel panels.
A roof overhang has been provided at the main floor of the building to
provide some dimension and enclosure to this area. Staff are satisfied with the elevations as
proposed.
FINANCIAL TEMPLATE (external link):
Not applicable.
ENVIRONMENTAL CONSIDERATIONS:
As a condition of severance approval, the applicant was asked to submit a Phase I Environmental Site Assessment (ESA). The Phase I ESA concluded that no significant environmental issues were identified and that no further investigation was warranted, but also recommended that a chemical analysis be conducted to determine if the fill materials in the railway embankment meet the applicable MOE guidelines. The applicant subsequently submitted a soil sampling analysis of the CN Rail lands, which indicated that the soil samples submitted met the applicable specified regulatory standards and that no significant environmental concerns were identified.
The site plan shows two parking spaces for the physically disabled, which are located at the east building face. However, as per the Parking Standards By-law 28-97, as amended, a total of three parking spaces for the physically disabled are required. The applicant has been advised of requirement and will be revising the site plan accordingly.
ENGAGE 21ST CONSIDERATIONS:
The proposed
development is consistent with
optimizing the se of the Town’s current infrastructure.
BUSINESS UNITS CONSULTED AND AFFECTED:
The
application was circulated to all Town departments and external agencies, and
their recommendations/comments have been incorporated into this report.
RECOMMENDED
BY: ________________________ ________________________
Valerie
Shuttleworth, M.C.I.P, R.P.P Jim Baird, M.C.I.P, R.P.P
Director, Planning & Urban Design Commissioner,
Development
Services
File path: Amanda\File 05
023385\Documents\Executive Report Summary Template
ATTACHMENTS:
Figure 1 –
Location Map
Figure 2 – Area
Context and Zoning
Figure 3 – Air
Photo
Figure 4 – Site
Plan
Figure 5 –
Elevations
Appendix A –
Draft Zoning By-law Amendment
Appendix B – Site Plan Conditions
AGENT:
Mr. R. Librach
Tel. 416-482-9224
Fax. 416-781-2976