Report to: Development
Services Committee Report Date:
SUBJECT: Class
Environmental Assessment for
Woodbine Avenue to
PREPARED BY: Allan Arbuckle, Manager, Infrastructure and Capital Works, ext. 3120
RECOMMENDATION:
That the report
entitled “Centurian Drive Class Environmental Assessment”, dated
And that the
preferred alternative for the reconstruction of
And
that subject to 2008 Capital Budget approval staff be authorized to proceed
with the detailed design for the
And that the Mayor and Clerk be authorized to enter
into agreements to acquire properties as may be required to implement the
recommended alternative subject to the approval of the CAO and the Town Solicitor
and 2008 capital budget approval;
And that in the
event that staff are unable to come to an agreement with the property
owners for the acquisition of
the required lands, the CAO, in conjunction with the Town Solicitor, be
authorized to expropriate the necessary property and/or easements;
And that staff be authorized and directed to do
all things necessary, including the execution of documents, to give effect to
the above.
PURPOSE:
The purpose of this report is to
seek Council’s endorsement of the preferred alternative for the reconstruction
of
BACKGROUND:
Increasing traffic congestion
along the road network bounded by
In January 2007, the engineering
consulting firm Cansult Ltd. was retained to prepare a Class Environmental
Assessment to confirm the need for improvements on
DISCUSSION
The Environmental Study Report recommends that in order to
accommodate projected traffic on Centurian Dr. associated with the construction
of a Highway 404 grade separation, the existing 2-lane road be widened from an
11.0m paved roadway to 12.5m to incorporate a centre lane for left turning
traffic.
Recommended
Alternative
The
recommended alternative for the reconstruction of
·
widening the existing
pavement along the north side of the road to create a continuous common center left
turn lane
·
Intersection
configuration improvements including the addition of turning lanes
·
The provision of
traffic signals at the
·
Creation of an
on-street parking lane along the south side of the road from
·
Improved pavement
markings and signage
·
Signed-only bicycle
route in accordance with Town’s cycling
master plan
Property Acquisition
The reconstruction of
Public Consultation
In accordance with the requirements of the Municipal Class
Environmental Assessment, a Public Information Centre was held on
Project Schedule
The Town’s capital plan currently
includes the detailed design for the
FINANCIAL CONSIDERATIONS
Funding in the amount of $599,200
is proposed in the draft 2008 Capital Budget (8080) for detailed design and
property acquisition in 2008. The total
cost for the widening of
The Legal Department has reviewed this report and its comments have been incorporated.
RECOMMENDED BY:
_______________________ ________________________
Alan Brown, C.E.T. Jim Baird, M.C.I.P., R.P.P.
Director of
ATTACHMENTS
“A” Preferred Alternative
“B” Preferred Cross Section
“C” Key Map
Q/development/engineering/reports/2007/november