Report to: Development Services Committee Report Date: June 10, 2008
SUBJECT: Application by Concord Hotels Springhill Suites for Site Plan Approval
to permit a 6 storey 178 room hotel at 525 Cochrane Drive, PLAN 65M2073 Lot 2
File:
SC-07131014
PREPARED BY: Geoff
Day, Planner - West Development Team ext.
3071
RECOMMENDATION:
That the report dated June 10,
2008, entitled “Application
by Concord Hotels Springhill Suites for
Site Plan Approval to permit a 6 storey 178 room hotel at 525 Cochrane Drive”,
be received;
That the Site Plan Control application (SC-07-131014) submitted by Concord Hotels
Springhill Suites, to permit a 6 storey 178 room
hotel at 525 Cochrane Drive,
be endorsed in principle subject to the conditions included in Appendix ‘A’;
And that site plan approval be
delegated to the Director of Planning and Urban Design or her designate, to be
issued following execution of a site plan agreement. Site Plan approval is issued only when the
Director has signed the site plan.
EXECUTIVE SUMMARY:
Not applicable
The purpose
of this report is to recommend that Development Services Committee endorse in
principle an application for Site Plan Approval for a proposed 6 storey 178 room
hotel located at 525 Cochrane Drive (Figure
1).
Location and
Area Context
The subject property has an area of 1.40 hectares (3.46
acres) and is located on the south side of Cochrane
Drive abutting the Highway 404/407
interchange (Figure 1). The parcel is
identified as Lot 2 on registered plan 65M-2073.
Adjacent uses include a Howard Johnson Hotel to the north, prestige employment
uses to the east, and the Highway 404/407 interchange to the south and west.
Official Plan
and Zoning
The subject
property is designated Business Park Area in the Official Plan (Revised 1987). The Business
Park Area designation provides for a range of employment uses including hotels
and ancillary retail and service uses and restaurants, where internally
integrated as a component of a hotel.
The subject lands
are currently zoned M.C. (100%) – Select Industrial
and Limited Commercial, by By-law 165–80, as amended (Figure 2). This designation permits the
proposed uses.
Proposal
The Owner proposes
to construct a 10,725 m2 (115,447 ft2) 6 storey hotel
containing 178 rooms, a restaurant and banquet hall. 223 surface parking spaces are proposed
(Figures 4&5).
Site Layout and design
The building
is aligned in a north-south orientation on the site. The parking is
located to the north west and south
east sides of the building. There is no
parking between the building and the street. The building material is
primarily stucco which has been applied in two colours, “Mahogany and
Buff”. The base of the building is clad with a “simulated stone veneer”.
Staff are continuing to work with the applicant on the
treatment of the transition between the stucco material on upper levels and the
base stone veneer material, the delineation of the top cornice of the building
and modifications to the entrance canopy to accommodate seasonal conditions. However in general, Staff are
satisfied with the colour and materials chosen for this site.
Enhanced landscaping and directional lighting
provided
Enhanced landscaping
will be installed around and throughout the site with specific focus on
screening the outdoor patio areas (Figure 6).
The landscaped areas will contain drought resistant plants and therefore
will be irrigation free. Permeable
paving will be installed on all patio areas which will assist in reducing any
impacts from stormwater run-off.
All lighting
will be of directional form in order to minimize lighting impacts on
surrounding properties and on night skies.
Green Initiatives
On April 23 2008, Staff received
a letter from the applicant committing to a number of green initiatives,
including:
·
Low-E windows
·
Use of native landscaping material that require less
water
·
Full cut-off exterior light fixtures to reduce light
trespass and promote “dark skies”
·
Installation of a white roof system
·
Permeable paving on all patio areas
·
All buffer areas to be irrigation free, containing
drought resistant plants
·
Auto shut off faucets and low flow toilets
·
Energy efficient florescent lighting installed
throughout the building
Technical studies finalized
The required technical studies addressing stormwater
management, site servicing and grading have been submitted and are acceptable.
The required Environmental Noise Report was submitted to
the Town and has been also been found satisfactory.
Not
applicable
Not
applicable
Growth
Management
This multi-storey building
promotes an intensive use of the land and provides lodging opportunities for
individuals doing business or vacationing in Markham. This development is an efficient use of the
land by infilling within an existing employment area.
Transportation/Transit;
The required traffic study has
been reviewed by both Town and MTO staff and has been found to be satisfactory.
Environment;
The applicant has committed to
several green initiatives as outlined in this report.
BUSINESS UNITS CONSULTED AND
AFFECTED:
The proposal has been circulated to
other Town Departments and agencies and all comments have been addressed in
this report.
RECOMMENDED BY:
______________________________ _______________________________
Valerie Shuttleworth, M.C.I.P, R.P.P Jim Baird, M.C.I.P,
R.P.P
Director, Planning & Urban Design Commissioner, Development Services
ATTACHMENTS:
File
path: Amanda\File 07 131014\Documents\Recommendation Report
APPENDIX A
- That final site plan, building elevation
and landscape drawings be submitted to the satisfaction of the Director of
Planning and Urban Design;
- That a Landscape Plan, prepared by a
Landscape Architect having O.A.L.A. membership, be submitted to the
satisfaction of the Director of Planning
and Urban Design;
- That
a letter be provided from an Ontario Land Surveyor (O.L.S), confirming that
the proposed development adheres to the height regulations for the Buttonville Airport as set out by Transport Canada;
- That the Owner enter
into a site plan agreement with the Town containing all the standard and
special provisions and requirements of the Town and public agencies
including the Region of York;
- And that a site plan agreement be executed prior
to final site plan approval; and,
- And further that this endorsement shall lapse and
final approval will not be issued, after a period of three years
commencing June 10, 2008 in the event a site plan agreement is not
executed within that period.