Report to: Development Services Committee Date of Meeting:
SUBJECT: RECOMMENDATION REPORT
Yonge Steeles Corridor Study,
Draft Final Report
File MI 514
PREPARED BY:
West District Team
RECOMMENDATION:
That the report entitled
“Recommendation Report: Yonge Steeles
Corridor Study, Draft Final Report
That the draft final report prepared by DuToit Allsop Hillier, entitled “Town of Markham Yonge + Steeles Corridor Study, Draft Final Report July 31, 2008” (under separate cover) be endorsed as the basis for Town-initiated amendments to the Markham Official Plan and the Thornhill Secondary Plan;
That a public meeting be scheduled to consider Town-initiated amendments to the Markham Official Plan and the Thornhill Secondary Plan (PD 3-1) to implement the recommendations of the Yonge Steeles Corridor Study;
That staff report back to Development Services Committee with a draft Official Plan Amendment, to implement the Yonge Steeles Corridor Study;
And that Staff be authorized and directed to do all things necessary to give effect to this resolution.
EXECUTIVE SUMMARY:
The study area is bounded by
The Yonge Steeles Corridor Study was initiated in March 2007, in response to emerging Regional and Provincial planning policies, which promote intensification along the Yonge Street corridor; new transit initiatives, including the Yonge Street dedicated Transitway, which was in the design phase at the time of study initiation, and the more recent Provincial announcement of a Yonge Street subway extension from Finch to Highway 7; and also, a major redevelopment and intensification application, at the north east corner of Yonge Street and Doncaster (the Liberty application) which was submitted in July 2006.
The Yonge Steeles Corridor Study process has included an extensive public consultation program, consisting of a series of 4 Working Group meetings (the Working Group is composed of approximately 15 area residents, landowners and developers, who met periodically with the study team for more in-depth review and discussion of study recommendations); 4 Public Open Houses (the most recent on September 17 2008) and regular meetings with the Region and adjoining local municipalities.
The Yonge Steeles Corridor Study was initiated with the intention of fulfilling a number of key objectives for the area. These include providing a gateway to Markham; encouraging mixed use infill development; respecting and minimizing impacts on adjacent land-uses (e.g. low-density residential communities); encouraging high quality parks and open spaces; creating a great street environment; taking advantage of the planned transit corridor system; and promoting Markham’s green (sustainability) agenda. These objectives have played an important role in the study process and are reflected in the final study recommendations.
More specifically, the Yonge Steeles Corridor Study recommends:
§
An average density of 2.5 FSI on the
redevelopment blocks, plus an additional 1.0 FSI incentive for commercial/office
uses along the
§
A requirement for commercial uses at grade along
the Yonge Street frontage (as well as the first block fronting Steeles Avenue
east of Yonge Street) within the southern section of the corridor between
Steeles Avenue and the CN Rail line, with a more predominantly residential
character north of the rail line (although at-grade commercial would be
permitted, it will not be required along Yonge Street in this area);
§
A “transition strategy” for the redevelopment
blocks between
o Limiting building heights through the use of an “angular plane” that is lowest towards the low-rise neighbourhoods and increases in height away from the existing low-rise neighbourhoods at a 1:2 ratio (i.e. 1 m of height for every 2 m of horizontal distance);
o
Achieving a minimum street wall height of 15
metres (approx. 3 to 4 storeys) and a maximum street wall height of 30 metres
(7-9 storeys), with taller point towers in accordance with the angular plane,
along the length of each block fronting Yonge Street;
o Creating an integrated open space system consisting of a linear park and pedestrian connections on the eastern edge of the redevelopment blocks (adjacent to Dudley Avenue and the existing residential neighbourhoods to the east) to serve as a buffer between the redevelopment areas and the existing low rise residential area to the east; two publicly-owned neighbourhood parks; and a variety of privately owned but publicly accessible parkettes and squares;
§ The study also included a review of servicing and transportation capacity in the surrounding area. Currently, both of these infrastructure elements are close to, or at capacity, and will require significant upgrading to accommodate redevelopment and intensification;
Based on the proposals contained in this study, Town staff will prepare a detailed Official Plan Amendment and implementation strategy for late in 2008.
It is important to note that
the City of
FINANCIAL CONSIDERATIONS:
Not applicable at this time.
1. Purpose 2.
Background 3. Discussion 4.
Financial
5. Others (Environmental,
Accessibility, Engage 21st, Affected Units) 6. Attachment(s)
The purpose of this report is to
summarize the Consultant’s recommendations contained in the Yonge Steeles
Corridor Study Draft Final Report, July 31, 2008, undertaken by DuToit Allsop
Hillier (provided under separate cover), and to recommend that Council endorse
the study as the basis for an Official Plan Amendment to bring forward to a
public meeting.
Study Area and Surrounding Context
The study area includes the blocks
bounded by
The study area is characterized by a mix of commercial and
residential uses. On the block east of
North of the Yonge-Steeles intersection to
North of Meadowview Avenue, two large properties
accommodating retail plazas are located north and south of the CN Rail
line. Industrial uses are located
immediately to the east fronting
The Study Area north of
On the west side of
South of Steeles Avenue, in the
City of
Yonge Steeles Corridor Study initiated in response to a variety of
policy, development and transportation infrastructure initiatives
The Study was initiated in
response to a variety of recent planning, infrastructure, and development initiatives
within the Yonge Steeles area of
§ Regional Official Plan Amendment 43, which updates the Region’s policies for intensification within nodes and corridors;
§ The Provincial growth plan for the Greater Golden Horseshoe, which promotes intensification within existing urban boundaries;
§
York Region Transit’s plans for a dedicated
transit way along
§ The more recent Provincial Government announcement for funding of an extension of the Yonge subway line north to Highway 7;
§
Ongoing sanitary, storm and water servicing
constraints in the older portion of the Thornhill Community west of
§ Submission in July 2006 (revised April 2008) of applications for Official Plan and Zoning By-law Amendment to permit an intensive mixed use development at the north east corner of Yonge Street and Doncaster Avenue (the Liberty application). The original application (July 2006) proposed two 39 storey apartment buildings along the Yonge Street frontage, as well as a 10 storey office building and two 32 storey apartment buildings along the Doncaster frontage, with low-rise retail development at the north and east sides of the site. This proposal was revised in April 2008 to consist of an office and hotel building of 20 storeys, two residential towers on the Yonge Street frontage of 34 and 32 storeys and two additional residential towers fronting Doncaster of 27 and 22 storeys, and approximately 208,500 square feet of retail space distributed in podiums at the base of the residential and hotel/office buildings as well as in a stand-alone 1 and 2-storey retail building at the north east corner of the site. This level of intensification represented a major departure from the current intensification policies of the Thornhill Secondary Plan.
Study focuses on a new urban design vision for the Yonge Steeles
Corridor
The purpose of the study is to:
§ Identify a preferred redevelopment/intensification scenario and land use plan;
§
Ensure a pedestrian and transit supportive
street level environment on
§ Provide appropriate transition between redevelopment sites and existing low density residential neighbourhoods;
§ Provide park, recreation and community services suitable for the anticipated population in the redevelopment area;
§ Assess transportation and servicing infrastructure and to determine required improvements to accommodate the preferred scenario;
§ Establish appropriate phasing of development;
§ Prepare an implementation strategy, including amendments to the Thornhill Secondary Plan and implementing zoning by-law.
Work Program
In November 2006, the Development Services Committee endorsed the proposed work program for the Yonge Steeles Corridor Study (See Appendix 1) and authorized staff to begin the consultant selection process.
In February 2007, following a Request for Proposal process, the Town selected the consulting team of Du Toit Allsop Hillier; the Butler Group Consultants Inc.; Cansult Limited (a division of UMA Engineering); and N.Barry Lyons Consulting to undertake the study.
In March 2007, the study was
initiated. The consulting team began
work on Phase 1: Background Data Collection and Review. Phase 1 was completed in May 2007 and the
first public open house was held on
Work then began on Phase 2: Land Use and Urban Design Plan and
Guidelines. A second public open house
was held on
In September 2007, the consulting
team began work on the transportation, servicing and community services components
of the Phase 2 portion of the study.
Another series of public consultation meetings was held in late
September, with a working group meeting held on September 26 and a public open
house on October 3. The focus of these
meetings was to test the emerging Land Use and Urban Design Plan against
current and anticipated transportation and servicing infrastructure. This phase of the study also looked at Transportation
Demand Management strategies, such as reduced parking requirements in the
redevelopment blocks, as well as traffic calming and conceptual traffic
infiltration mitigation measures in the adjacent low rise residential
neighbourhood. Staff prepared an interim
report on the study in September 2007, and presented interim study recommendations
to Development Services Committee on
Staff’s original intention had
been to complete the study in the first quarter of 2008. However, in December 2007, the owners of the
In the Spring of 2008, Staff, with
the assistance of the Consulting team, focused on resolving the outstanding
issues associated with the
In August 2008, the Consulting
team submitted the draft final study report.
The final round of public consultation, to review the study
recommendations, has now been completed, consisting of a meeting with Working
Group (
Inter municipal Consultation has also played a key role in the study
process
Since the study area borders the
Cities of Toronto and Vaughan, staff are very aware of the need for inter municipal
input and coordination throughout the study process. Early in 2007, before the study officially
began,
It is important to note that the
idea of a joint study with the City of
Study Area subject to a number of jurisdictions and policy layers
The study area falls within the
jurisdiction of the Town of
Provincial Policies and new planning initiatives: The recent Provincial Policy Statement (2005), together with the Greenbelt Plan (February 2005) and the Places to Grow plan (2006) will shape future municipal policy directions and growth in the GTA. These documents are aimed at maximizing growth opportunities within existing urban areas through infill development and intensification. Higher order transit corridors within urban areas are identified as key areas for intensification and redevelopment.
Thornhill Secondary
Plan (OPA1): The lands fronting
North of the CN line, more moderate densities of 0.75 to 1.0
FSI are permitted within the Community Amenity Area designation fronting Yonge
Street (of which 0.3 FSI must be reserved for grade-related commercial); and
building height is generally limited to 4 storeys but may be increased through
rezoning in accordance with criteria set out in the Secondary Plan. The residential properties east of the
Planned transit
improvements will transform the Yonge streetscape
York Region Transit
A new vision for the Yonge Steeles Corridor
The Yonge Steeles Corridor Study
envisions Yonge Street transformed - from a somewhat non-descript traffic
artery into a vibrant, mixed-use main street with a balanced mix of
residential, retail and commercial redevelopment, and an extensive and
integrated system of open spaces, public squares and private gathering areas
(see Figure 2). The vision builds on the
corridor’s many strengths: its healthy residential neighbourhoods,
opportunities for mixed use intensification along
§
A “transition strategy” for the redevelopment
blocks between
o
Directing higher building heights to the western
(Yonge Street frontage) area of the redevelopment blocks through the use of an
“angular plane” that is lowest towards the low-rise neighbourhoods (located on
the east side of Dudley Avenue) and which increases in height with the distance
away from the existing low-rise area at a 1:2 ratio (i.e. 1 m of height for
every 2 m of horizontal distance) (See
Figure 3 – Angular Plane);
o
It is important to note that the study
recommends that building heights be governed by a 1:2 slope angular plane
rather than a 1:1 angular plane (i.e. 1 metre in height for 1 metre in
horizontal distance) that is used in many situations in the Greater Toronto
Area. The principle reason for adopting
a 1:2 angular plane is due to the 200 metre length of the proposed
redevelopment blocks between
o
Achieve a continuous, medium-rise building wall along
the perimeter of the redevelopment blocks, with taller point towers at the
Yonge frontage in accordance with the angular plane (See Figures 4 to 8 – Built
Form);
o
Buffering the eastern edge of the redevelopment
blocks (adjacent to Dudley Avenue and the existing residential neighbourhoods
to the east) with a north-south park system linking across the rail corridor
with a pedestrian bridge (See Figure 8 – Public Realm:
§
A requirement for at-grade commercial uses along
the
§ Provision of a generous public realm incorporating street trees, landscaping, public seating areas etc. along Yonge Street, Steeles Avenue, Dudley Avenue and the east-west streets;
§ Preserving and strengthening the existing pattern of streets and blocks;
§ Balancing pedestrian and vehicular priorities;
§ Developing an integrated pedestrian circulation network
An integrated Open Space system
The study recommends an integrated public open space system, including three publicly-owned neighbourhood parks; a variety of private open spaces, parkettes, courts and squares within the redevelopment blocks; and a publicly-owned linear park system on the west side of Dudley Avenue, which will also serve as a buffer between the low density residential to the east and the core of the redevelopment area to the west. In addition the study recommends enhancement of the Yonge Street Boulevard through redevelopment, including widening to accommodate street trees, seating areas, and cafes.
Comprehensive design guidelines
The design guidelines set out in the study promote high urban design standards for future redevelopment and infill, in order to enhance the pedestrian and visual character of the corridor and to implement the key urban design objectives set out in the study. The design guidelines address building heights and massing; development densities; transitions to the existing low density residential neighbourhoods; landscaping and public realm design; parking, loading and access; building orientation and setbacks; preservation of traditional street and block patterns; and developing an integrated public and publicly-accessible open space system.
Phasing and Implementation Strategy
The Yonge Steeles Corridor Study sets out a detailed Phasing and Implementation strategy. Key elements include:
As a first step in the implementation process, staff will be preparing a draft secondary plan amendment, for later submission to Development Services Committee, based on the land use and urban design recommendations set out in the study. Staff recommend that a public meeting be scheduled to receive input from the public in the policies contained in the draft Official Plan Amendment.
CONCLUSION:
The Yonge Steeles Corridor Study sets out a comprehensive redevelopment strategy for the Yonge corridor, which will enhance pedestrian amenity, preserve adjacent residential neighbourhoods, and allow for significant intensification of key redevelopment blocks. Staff recommend that the study be received and endorsed, and that staff be authorized to schedule a public meeting to consider a draft Official Plan Amendment, in the fall.
FINANCIAL TEMPLATE:
Not applicable
The draft recommendations of this study align with a number of strategic priorities including: growth management by promoting intensification with the existing urban area and transportation and transit by promoting transit-supportive forms of development. Environmental sustainability initiatives will also be key components of the implementation and development review process.
The application has been
circulated to all relevant departments and agencies. The comments received to date have been
incorporated into the recommendations of this report.
RECOMMENDED BY:
|
|
|
Valerie Shuttleworth, M.C.I.P., R.P.P. Director of |
|
Jim
Baird, M.C.I.P., R.P.P. Commissioner of Development Services |
Figure 1 – Study Area
Figure 2 – Demonstration Plan
Figure 3 – Angular Plane
Figure 4 – Built Form Yonge Street
Figure 5 – Built Form Steeles Avenue
Figure 6 – Built Form East/West Streets
Figure 7 – Built Form Highland Park
Figure 8 – Built Form
Q:\Development\Planning\MISC\MI
514 Yonge-Steeles Corridor Study\Report to DSC - final report.doc