Report to: Development Services Committee                         Date of Meeting: October 7, 2008

 

 

SUBJECT:                          RECOMMENDATION REPORT

                                            Yonge Steeles Corridor Study,

                                            Draft Final Report July 31, 2008

                                            File MI 514

 

PREPARED BY:               Ron Blake, Development Manager

                                            West District Team

 

 

 

RECOMMENDATION:

That the report entitled “Recommendation Report:  Yonge Steeles Corridor Study, Draft Final Report July 31, 2008, File MI 514” be received;

 

That the draft final report prepared by DuToit Allsop Hillier, entitled “Town of Markham Yonge + Steeles Corridor Study, Draft Final Report July 31, 2008” (under separate cover) be endorsed as the basis for Town-initiated amendments to the Markham Official Plan and the Thornhill Secondary Plan;

 

That a public meeting be scheduled to consider Town-initiated amendments to the Markham Official Plan and the Thornhill Secondary Plan (PD 3-1) to implement the recommendations of the Yonge Steeles Corridor Study;

 

That staff report back to Development Services Committee with a draft Official Plan Amendment, to implement the Yonge Steeles Corridor Study;

 

And that Staff be authorized and directed to do all things necessary to give effect to this resolution.

 

EXECUTIVE SUMMARY:

The study area is bounded by Yonge Street on the west, Dudley Avenue on the east, Steeles Avenue to the south and the Farmers’ Market property, immediately south of Elgin Street to the north.  The block bounded by Dudley Avenue, Highland Park, Willowdale Avenue and Steeles Avenue is also included in the study area.  Uses within and adjacent to the study area include low rise commercial uses fronting Yonge Street, isolated pockets of medium and high rise apartment buildings, industrial uses north and south of the CN rail line east of Yonge Street, and a predominance of single detached residences in the interior of blocks east of Yonge Street.  Large format retail and numerous car dealerships are located on the west side of Yonge Street south of the CN rail line in the City of Vaughan.  Centrepoint Mall is located on the southwest corner of the Yonge Steeles intersection, in Toronto.

 

The Yonge Steeles Corridor Study was initiated in March 2007, in response to emerging Regional and Provincial planning policies, which promote intensification along the Yonge Street corridor; new transit initiatives, including the Yonge Street dedicated Transitway, which was in the design phase at the time of study initiation, and the more recent Provincial announcement of a Yonge Street subway extension from Finch to Highway 7; and also, a major redevelopment and intensification application, at the north east corner of Yonge Street and Doncaster (the Liberty application) which was submitted in July 2006.

 

The Yonge Steeles Corridor Study process has included an extensive public consultation program, consisting of a series of 4 Working Group meetings (the Working Group is composed of approximately 15 area residents, landowners and developers, who met periodically with the study team for more in-depth review and discussion of study recommendations); 4 Public Open Houses (the most recent on September 17 2008) and regular meetings with the Region and adjoining local municipalities.

 

The Yonge Steeles Corridor Study was initiated with the intention of fulfilling a number of key objectives for the area.  These include providing a gateway to Markham; encouraging mixed use infill development; respecting and minimizing impacts on adjacent land-uses (e.g. low-density residential communities); encouraging high quality parks and open spaces; creating a great street environment; taking advantage of the planned transit corridor system; and promoting Markham’s green (sustainability) agenda. These objectives have played an important role in the study process and are reflected in the final study recommendations.  

 

More specifically, the Yonge Steeles Corridor Study recommends:

§         An average density of 2.5 FSI on the redevelopment blocks, plus an additional 1.0 FSI incentive for commercial/office uses along the Yonge Street frontage;

§         A requirement for commercial uses at grade along the Yonge Street frontage (as well as the first block fronting Steeles Avenue east of Yonge Street) within the southern section of the corridor between Steeles Avenue and the CN Rail line, with a more predominantly residential character north of the rail line (although at-grade commercial would be permitted, it will not be required along Yonge Street in this area);

§         A “transition strategy” for the redevelopment blocks between Yonge Street and Dudley Avenue to reduce potential impacts of new development on existing residential neighbourhoods east of the corridor.  Key elements of this strategy include:

o       Limiting building heights through the use of an “angular plane” that is lowest towards the low-rise neighbourhoods and increases in height away from the existing low-rise neighbourhoods at a 1:2 ratio (i.e. 1 m of height for every 2 m of horizontal distance);

o       Achieving a minimum street wall height of 15 metres (approx. 3 to 4 storeys) and a maximum street wall height of 30 metres (7-9 storeys), with taller point towers in accordance with the angular plane, along the length of each block fronting Yonge Street;

o       Creating an integrated open space system consisting of a linear park and pedestrian connections on the eastern edge of the redevelopment blocks (adjacent to Dudley Avenue and the existing residential neighbourhoods to the east) to serve as a buffer between the redevelopment areas and the existing low rise residential area to the east; two publicly-owned neighbourhood parks; and a variety of privately owned but publicly accessible parkettes and squares;

§      The study also included a review of servicing and transportation capacity in the surrounding area.  Currently, both of these infrastructure elements are close to, or at capacity, and will require significant upgrading to accommodate redevelopment and intensification;

 

Based on the proposals contained in this study, Town staff will prepare a detailed Official Plan Amendment and implementation strategy for late in 2008. 

 

It is important to note that the City of Vaughan initiated a similar review of the west side of the Yonge Street Corridor in early 2008.  This study is ongoing, and Town staff continue to work closely with Vaughan to ensure compatibility between the two studies and implementing documents.

 

FINANCIAL CONSIDERATIONS:

Not applicable at this time.


1. Purpose                     2. Background                      3. Discussion                        4. Financial        

 

5. Others (Environmental, Accessibility, Engage 21st, Affected Units)             6. Attachment(s)

 


PURPOSE:


The purpose of this report is to summarize the Consultant’s recommendations contained in the Yonge Steeles Corridor Study Draft Final Report, July 31, 2008, undertaken by DuToit Allsop Hillier (provided under separate cover), and to recommend that Council endorse the study as the basis for an Official Plan Amendment to bring forward to a public meeting.


 

BACKGROUND:


Study Area and Surrounding Context

The study area includes the blocks bounded by Yonge Street to the west, Steeles Avenue to the south, Dudley Avenue to the east and one property south of the Farmer’s Market, which flanks onto Elgin Street.  In addition, the study area also include the first block east of Dudley, fronting onto Steeles Avenue. (See Figure 1 – Study Area)

 

The study area is characterized by a mix of commercial and residential uses.  On the block east of Dudley, fronting Steeles Avenue the original single detached housing remains in place.  The Block between Yonge and Dudley, also fronting on Steeles, contains a gas station and an older, mid rise apartment building.

 

North of the Yonge-Steeles intersection to Meadowview Avenue, the east side of Yonge Street is bordered by a mix of low rise retail and highway commercial uses. Single detached residential properties are located immediately to the east.  Generally this portion of the study area is characterized by small lot sizes and fragmented ownership patterns.

           

North of Meadowview Avenue, two large properties accommodating retail plazas are located north and south of the CN Rail line.  Industrial uses are located immediately to the east fronting Doncaster and Glen Cameron, on both sides of the CN line.

 

The Study Area north of Clark Avenue is characterized by older mid-rise apartment buildings.  Generally, these uses are well established and may have limited intensification or redevelopment potential.

 

On the west side of Yonge Street, in the City of Vaughan, land uses include a mix of large commercial properties from Steeles Avenue north to the CN Rail line.  North of the CN rail line, higher density, medium and high-rise buildings with at grade commercial uses fronting onto the Yonge Street corridor.

 

South of Steeles Avenue, in the City of Toronto, land use patterns on the east side of Yonge Street are similar to those in Markham.  Centrepoint Mall, a regional shopping centre, is located on the west side of Yonge Street. 

 

Yonge Steeles Corridor Study initiated in response to a variety of policy, development and transportation infrastructure initiatives

The Study was initiated in response to a variety of recent planning, infrastructure, and development initiatives within the Yonge Steeles area of Markham.  These include:

 

§      Regional Official Plan Amendment 43, which updates the Region’s policies for intensification within nodes and corridors;

§      The Provincial growth plan for the Greater Golden Horseshoe, which promotes intensification within existing urban boundaries;

§      York Region Transit’s plans for a dedicated transit way along Yonge Street. 

§      The more recent Provincial Government announcement for funding of an extension of the Yonge subway line north to Highway 7;

§      Ongoing sanitary, storm and water servicing constraints in the older portion of the Thornhill Community west of Bayview Avenue;

§      Submission in July 2006 (revised April 2008) of applications for Official Plan and Zoning By-law Amendment to permit an intensive mixed use development at the north east corner of Yonge Street and Doncaster Avenue (the Liberty application).  The original application (July 2006) proposed two 39 storey apartment buildings along the Yonge Street frontage, as well as a 10 storey office building and two 32 storey apartment buildings along the Doncaster frontage, with low-rise retail development at the north and east sides of the site.  This proposal was revised in April 2008 to consist of an office and hotel building of 20 storeys, two residential towers on the Yonge Street frontage of 34 and 32 storeys and two additional residential towers fronting Doncaster of 27 and 22 storeys, and approximately 208,500 square feet of retail space distributed in podiums at the base of the residential and hotel/office buildings as well as in a stand-alone 1 and 2-storey retail building at the north east corner of the site.  This level of intensification represented a major departure from the current intensification policies of the Thornhill Secondary Plan.

 

Study focuses on a new urban design vision for the Yonge Steeles Corridor

The purpose of the study is to:

§      Identify a preferred redevelopment/intensification scenario and land use plan;

§      Ensure a pedestrian and transit supportive street level environment on Yonge Street and Steeles Avenue;

§      Provide appropriate transition between redevelopment sites and existing low density residential neighbourhoods;

§      Provide park, recreation and community services suitable for the anticipated population in the redevelopment area;

§      Assess transportation and servicing infrastructure and to determine required improvements to accommodate the preferred scenario;

§      Establish appropriate phasing of development;

§      Prepare an implementation strategy, including amendments to the Thornhill Secondary Plan and implementing zoning by-law.

 

Work Program

In November 2006, the Development Services Committee endorsed the proposed work program for the Yonge Steeles Corridor Study (See Appendix 1) and authorized staff to begin the consultant selection process.

 

In February 2007, following a Request for Proposal process, the Town selected the consulting team of Du Toit Allsop Hillier; the Butler Group Consultants Inc.; Cansult Limited (a division of UMA Engineering); and N.Barry Lyons Consulting to undertake the study.

 

In March 2007, the study was initiated.  The consulting team began work on Phase 1: Background Data Collection and Review.  Phase 1 was completed in May 2007 and the first public open house was held on May 31, 2007.

 

Work then began on Phase 2:  Land Use and Urban Design Plan and Guidelines.  A second public open house was held on June 28, 2007, at which time the consulting team presented conceptual urban design and redevelopment options for the corridor and initiated public discussion of these alternatives.  In particular, this public open house focused on examples of corridor intensification elsewhere in the GTA, and the different ways that a sample target density of 2.5 FSI could be achieved on the redevelopment blocks through different building height and building coverage alternatives.  Copies of the consultants’ presentations from the open houses are available at: http://www.markham.ca/Markham/Departments/Planning/Studies/Studies_Yonge-Steeles.htm  During the summer of 2007, staff held the first meeting with the Yonge Steeles Working Group, a small group of approximately 15 residents, commercial property owners and developers who had indicated at the first two public open houses that they would be interested in participating more closely in the study process.  The material presented at the Working Group meetings is also available for viewing at the web link above. 

 

In September 2007, the consulting team began work on the transportation, servicing and community services components of the Phase 2 portion of the study.   Another series of public consultation meetings was held in late September, with a working group meeting held on September 26 and a public open house on October 3.  The focus of these meetings was to test the emerging Land Use and Urban Design Plan against current and anticipated transportation and servicing infrastructure.  This phase of the study also looked at Transportation Demand Management strategies, such as reduced parking requirements in the redevelopment blocks, as well as traffic calming and conceptual traffic infiltration mitigation measures in the adjacent low rise residential neighbourhood.  Staff prepared an interim report on the study in September 2007, and presented interim study recommendations to Development Services Committee on November 27, 2007.

 

Staff’s original intention had been to complete the study in the first quarter of 2008.  However, in December 2007, the owners of the Liberty site appealed their application to the Ontario Municipal Board.  A pre-hearing conference was held on May 1, 2008.  A second pre-hearing is scheduled for September 29, 2008.  A final hearing date has not yet been set. 

 

In the Spring of 2008, Staff, with the assistance of the Consulting team, focused on resolving the outstanding issues associated with the Liberty application.  Liberty submitted a revised development concept in April 2008, which addressed a number of the outstanding issues.  A detailed review of the current status of the Liberty application, and staff’s recommendations with regard to the revised application, is set out in a separate report to Development Services Committee, entitled: “RECOMMENDATION REPORT, Applications by 1691126 Ontario Inc. for Official Plan and Zoning By-law Amendments to permit high density residential, retail and office commercial uses at 7171 & 7161 Yonge Street, northeast corner of Yonge Street and Meadowview Avenue, Thornhill, File Nos. OP 06 127138 & ZA 06 127273”, dated October 7, 2008.

 

In August 2008, the Consulting team submitted the draft final study report.  The final round of public consultation, to review the study recommendations, has now been completed, consisting of a meeting with Working Group (August 27, 2008), a presentation to Development Services Committee (September 9, 2008), and a final Public Open House (September 17).

 

Inter municipal Consultation has also played a key role in the study process

Since the study area borders the Cities of Toronto and Vaughan, staff are very aware of the need for inter municipal input and coordination throughout the study process.  Early in 2007, before the study officially began, Markham staff met with their counterparts in these municipalities and the Region of York to advise them of the upcoming study.  Since then, staff representatives from these municipalities have attended a series of four Steering Committee meetings held through the course of the study, and have provided regular input into the study process.

 

It is important to note that the idea of a joint study with the City of Vaughan, similar to the approach taken with the Thornhill Yonge Street Study was considered early in 2007 but proved not to be feasible for the City of Vaughan from both a scheduling and budgeting standpoint.  However, Vaughan is now undertaking a similar study for the west side of the Yonge Corridor, which began earlier this year.  Their second public open house was scheduled on September 16, 2008,  with a further public meeting on October 20, 2008.

 

Study Area subject to a number of jurisdictions and policy layers

The study area falls within the jurisdiction of the Town of Markham Official Plan, the Thornhill Secondary Plan, the Region of York Official Plan and a variety of Provincial Plans and Policy Statements. 

 

Provincial Policies and new planning initiatives:  The recent Provincial Policy Statement (2005), together with the Greenbelt Plan (February 2005) and the Places to Grow plan (2006) will shape future municipal policy directions and growth in the GTA.  These documents are aimed at maximizing growth opportunities within existing urban areas through infill development and intensification.  Higher order transit corridors within urban areas are identified as key areas for intensification and redevelopment.

 

York Region Official Plan:  The York Region Official Plan establishes a commitment to invest in transit infrastructure, including streetscape enhancements within identified nodes and corridors.  The Yonge Street corridor is designated as a Regional corridor.  The Regional Plan supports mixed-use intensification along these corridors.  The Region refined its transit supportive land use policies, density targets and urban design performance standards through ROPA #43, adopted in December 2004.

 

Thornhill Secondary Plan (OPA1):  The lands fronting Yonge Street south of the CN rail line are designated as “Community Amenity Area.”  Within this designation, mixed use development consisting of retail at grade and residential/commercial above is encouraged; densities are restricted to 1.5 FSI, with a potential for 2.0 FSI subject to supporting transportation and infrastructure studies.  South of Meadowview, the eastern portions of the blocks to Dudley are designated “High Density Residential II.”

 

North of the CN line, more moderate densities of 0.75 to 1.0 FSI are permitted within the Community Amenity Area designation fronting Yonge Street (of which 0.3 FSI must be reserved for grade-related commercial); and building height is generally limited to 4 storeys but may be increased through rezoning in accordance with criteria set out in the Secondary Plan.  The residential properties east of the Yonge Street frontages are limited to Low Density Housing and Low Density Housing Special (which provides for low-rise non-residential development along the north side of Glen Cameron).  The block fronting Steeles Avenue, east of Dudley, is also designated Low Density Housing with a Low Density Housing Special designation along the Steeles Avenue frontage.

 

Planned transit improvements will transform the Yonge streetscape

York Region Transit Planning staff had been working on a detailed design for a new dedicated bus transit way along the Yonge Street Corridor at the time of study initiation.  In May 2007, the Province announced plans to fund a subway extension from Finch Avenue to Highway 7.  YRTP is now initiating work on an EA Study for the subway extension.  YRTP anticipates new stations at Yonge and Steeles, Clark Avenue, Royal Orchard, Langstaff and Richmond Hill Centre.  The construction of the subway will provide transportation infrastructure to support significant intensification along the Yonge Steeles Corridor.


 

OPTIONS/ DISCUSSION:


A new vision for the Yonge Steeles Corridor

The Yonge Steeles Corridor Study envisions Yonge Street transformed - from a somewhat non-descript traffic artery into a vibrant, mixed-use main street with a balanced mix of residential, retail and commercial redevelopment, and an extensive and integrated system of open spaces, public squares and private gathering areas (see Figure 2).  The vision builds on the corridor’s many strengths: its healthy residential neighbourhoods, opportunities for mixed use intensification along Yonge Street, and municipal, regional and provincial planning and transit initiatives.  Key elements of the vision and land use recommendations set out in the study include:

 

  • Intensification and redevelopment in the study area blocks.  The study proposes an average residential density of 2.5 FSI within the study area blocks, with an additional commercial/office incentive of 1.0 FSI. along the Yonge Street frontages.  The objective is to encourage mixed use development, and to provide opportunities for reverse commuting along the Yonge Street Corridor.

§         A “transition strategy” for the redevelopment blocks between Yonge Street and Dudley Avenue to reduce potential impacts of new development on existing residential neighbourhoods east of the corridor.  Key elements of this strategy include:

o       Directing higher building heights to the western (Yonge Street frontage) area of the redevelopment blocks through the use of an “angular plane” that is lowest towards the low-rise neighbourhoods (located on the east side of Dudley Avenue) and which increases in height with the distance away from the existing low-rise area at a 1:2 ratio (i.e. 1 m of height for every 2 m of horizontal distance)  (See Figure 3 – Angular Plane);

o       It is important to note that the study recommends that building heights be governed by a 1:2 slope angular plane rather than a 1:1 angular plane (i.e. 1 metre in height for 1 metre in horizontal distance) that is used in many situations in the Greater Toronto Area.  The principle reason for adopting a 1:2 angular plane is due to the 200 metre length of the proposed redevelopment blocks between Dudley Avenue and Yonge Street.  Applying a 1:2 angular plane measured from the established residential neighbourhood on the east side of Dudley Avenue, buildings up to 100 metres (approximately 30 storeys) would be permitted along the Yonge Street frontage and approximately 65 metre (20 storeys) in the middle of the blocks.  However, adopting a 1:1 angular plane from Dudley Avenue would allow up to 200 metre buildings (approximately 60 storeys) on Yonge Street and 100 metre buildings (approximately 30 storeys) in the middle of the blocks, which clearly would not serve as a meaningful maximum building height in this area, nor would it result in building heights that are compatible with the surrounding context.

o       Achieve a continuous, medium-rise building wall along the perimeter of the redevelopment blocks, with taller point towers at the Yonge frontage in accordance with the angular plane (See Figures 4 to 8 – Built Form);

o       Buffering the eastern edge of the redevelopment blocks (adjacent to Dudley Avenue and the existing residential neighbourhoods to the east) with a north-south park system linking across the rail corridor with a pedestrian bridge (See Figure 8 – Public Realm: Dudley Avenue);

§         A requirement for at-grade commercial uses along the Yonge Street frontages and the Steeles Avenue frontage between Yonge and Dudley, within the southern section of the corridor between Steeles Avenue and the CN Rail line.  North of the CN line the study proposes a more predominantly residential character and at-grade commercial uses are not mandatory.  However, at-grade commercial would be permitted and buildings must be designed with sufficient floor to ceiling heights on the ground floor to accommodate retail and restaurant uses. (See Figure 9 – Street-related uses);

§         Provision of a generous public realm incorporating street trees, landscaping, public seating areas etc. along Yonge Street, Steeles Avenue, Dudley Avenue and the east-west streets;

§         Preserving and strengthening the existing pattern of streets and blocks;

§         Balancing pedestrian and vehicular priorities;

§         Developing an integrated pedestrian circulation network

  • The study also included a review of servicing and transportation capacity in the surrounding area.  Currently, both of these infrastructure elements are close to, or at capacity, and will require significant upgrading to accommodate redevelopment and intensification;

 

An integrated Open Space system

The study recommends an integrated public open space system, including three publicly-owned neighbourhood parks; a variety of private open spaces, parkettes, courts and squares within the redevelopment blocks; and a publicly-owned linear park system on the west side of Dudley Avenue, which will also serve as a buffer between the low density residential to the east and the core of the redevelopment area to the west.  In addition the study recommends enhancement of the Yonge Street Boulevard through redevelopment, including widening to accommodate street trees, seating areas, and cafes.

 

Comprehensive design guidelines

The design guidelines set out in the study promote high urban design standards for future redevelopment and infill, in order to enhance the pedestrian and visual character of the corridor and to implement the key urban design objectives set out in the study.  The design guidelines address building heights and massing; development densities; transitions to the existing low density residential neighbourhoods; landscaping and public realm design; parking, loading and access; building orientation and setbacks; preservation of traditional street and block patterns; and developing an integrated public and publicly-accessible open space system.

 


Phasing and Implementation Strategy

The Yonge Steeles Corridor Study sets out a detailed Phasing and Implementation strategy.  Key elements include:

 

  • Adoption of a secondary plan amendment reflecting the key policy recommendations of the study;
  • The use of detailed holding provisions and H removal policies (both in the comprehensive secondary plan amendment and in site-specific zoning by-law amendments) to ensure that redevelopment is appropriately phased and proceeds concurrently with the provision of key transportation and servicing infrastructure improvements;
  • A requirement for comprehensive block plans to provide a context for coordinating incremental redevelopment applications within redevelopment blocks;
  • Amendments to the Zoning By-law to allow for mixed use intensification and redevelopment along the corridor.  Zoning amendments would likely occur at the time of redevelopment or infill applications;
  • The possible use of Section 37 bonusing to encourage the provision of key community facilities (such as day nurseries, community facilities) where appropriate.  The Town is currently undertaking a review of its Section 37 Official Plan Policies, as a separate study.

 

As a first step in the implementation process, staff will be preparing a draft secondary plan amendment, for later submission to Development Services Committee, based on the land use and urban design recommendations set out in the study.  Staff recommend that a public meeting be scheduled to receive input from the public in the policies contained in the draft Official Plan Amendment.

 

CONCLUSION:

The Yonge Steeles Corridor Study sets out a comprehensive redevelopment strategy for the Yonge corridor, which will enhance pedestrian amenity, preserve adjacent residential neighbourhoods, and allow for significant intensification of key redevelopment blocks.  Staff recommend that the study be received and endorsed, and that staff be authorized to schedule a public meeting to consider a draft Official Plan Amendment, in the fall.

 


 

FINANCIAL TEMPLATE:


Not applicable

 

 

ALIGNMENT WITH STRATEGIC PRIORITIES:

The draft recommendations of this study align with a number of strategic priorities including:  growth management by promoting intensification with the existing urban area and transportation and transit by promoting transit-supportive forms of development.   Environmental sustainability initiatives will also be key components of the implementation and development review process.

 

 

DEPARTMENTS CONSULTED AND AFFECTED:

The application has been circulated to all relevant departments and agencies.  The comments received to date have been incorporated into the recommendations of this report. 


 


RECOMMENDED BY:

 

 

 

 

Valerie Shuttleworth, M.C.I.P., R.P.P.

Director of Planning & Urban Design

 

 

Jim Baird, M.C.I.P., R.P.P.

Commissioner of Development Services

 


 

ATTACHMENTS:


Figure 1 – Study Area

Figure 2 – Demonstration Plan

Figure 3 – Angular Plane

Figure 4 – Built Form Yonge Street

Figure 5 – Built Form Steeles Avenue

Figure 6 – Built Form East/West Streets

Figure 7 – Built Form Highland Park

Figure 8 – Built Form Dudley Avenue

 

 

Q:\Development\Planning\MISC\MI 514 Yonge-Steeles Corridor Study\Report to DSC - final report.doc