Report to: Development Services Committee Report Date:
SUBJECT: Recommendation Report
Bloorguard
Investment Co. Ltd.
Site
plan application to permit a 4918 square metre industrial building to
accommodate a PowerStream warehouse and service facility.
SC 08 124764
PREPARED BY: Anna Henriques, Planner II – Central District Team
RECOMMENDATION:
That the staff report entitled “Recommendation Report: Bloorguard Investment Co. Ltd. Site Plan application to permit a 4918 square metre industrial building to accommodate a PowerStream warehouse and service facility at 80 Addiscott Court” (SC 08 124764) be received;
That the site plan application to permit a 4918 square metre industrial building to accommodate a PowerStream warehouse and service facility at 80 Addiscott Court, be endorsed in principle, subject to the conditions attached as Appendix ‘A’;
That site plan approval be delegated to the Director of Planning and Urban Design or her designate, to be issued following execution of the site plan agreement and satisfaction of the attached conditions. Site Plan approval is issued only when the Director has signed the site plan;
And that Staff be authorized and
directed to do all things necessary to give effect to this resolution.
EXECUTIVE SUMMARY:
Not applicable
1. Purpose 2. Background 3. Discussion 4. Financial
5. Others (Strategic, Affected Units) 6. Attachment(s)
The purpose of this report is to
recommend that Committee endorse an application for site plan approval, subject
to the attached conditions, for a 4918 square metre industrial building to
accommodate a PowerStream warehouse and service facility at
Site Area and Context
The subject property encompasses
an area of approximately 4.65 hectares
(11.5 acres). The property is
bounded to the east by a future PowerStream transformer site and
Consent application
In June 2008, the Owners of the
subject property submitted a consent application to create a new 0.8 hectare (2
acre) parcel at the east end of the property, abutting the creek and
The Owner was seeking permission for consent and the easement in order to facilitate the sale of the severed parcel to PowerStream for use as a transformer site. The consent application was approved, subject to conditions, in July 2008. Staff had a pre-consultation meeting with PowerStream in October 2008, for the transformer site (severed parcel) and anticipate the submission of a site plan application in the near future.
The Owner is proposing to construct a 2 storey industrial building with approximately 4918 square metres (52,941 square feet). The proposed building is being built for use by PowerStream, as warehouse and service facility. PowerStream has negotiated a 25 year lease (with the Owner) with the option for purchase at the end of the lease.
The proposed building will consist of a warehouse component for the storage of materials, a garage component for the storage and servicing of fleet vehicles and a small office component for employees. The proposed development will also include an outdoor storage area at the west end of the property. This area will primarily be used for the storage of low profile materials such as transformers and hydro poles, as well as, vehicles. Approximately 318 parking spaces will be provided for employee vehicles and PowerStream fleet vehicles (Figure 4).
The Owner is proposing precast
concrete panels (white with grey accent) with spandrel glass panels for the
office portion of the building. The
warehouse and service portion of the building is proposed to be cladded with
ribbed precast concrete panels in grey.
Staff are generally satisfied with the proposed building materials and elevations.
Official Plan
The subject property is designated
“Industrial” and “
Zoning
The subject property is zoned (H)M [HOLD – Industrial] and O1 (Open Space) pursuant to By-law 165-80 as amended. The proposed use is permitted as a Public Use. Notwithstanding the HOLD provision, staff have advised the Owner that should PowerStream not occupy the building and/or terminate its lease, a Zoning By-law amendment will be required to lift the HOLD provision and to bring the development in conformity with the Zoning By-law with respect to development standards and storage permissions.
Permanent Cul-de-Sac
required for Addiscott Court
Through the site plan review process, it was determined that
The details and design of the permanent cul-de-sac are being prepared by the Owner for review by staff. During the design process for the permanent cul-de-sac, staff have requested that the Owner, with the adjacent property owners, take into account potential impacts on the adjacent properties such as access and on-site circulation at 70 and 75 Addiscott. Resolution of this matter, to the satisfaction of the Town Solicitor, the Director of Engineering and the Director of Planning and Urban Design, will be required as a condition of site plan approval.
TRCA approval
The subject property abuts Beaver Creek and associated valleylands. The Top of Bank limit has been staked by the TRCA and a 10 metre buffer will be required to be conveyed to the Town as a condition of site plan approval. The TRCA has provided comments with respect to stormwater management, water balance and erosion and sediment control. Approval from the TRCA will be required as a condition of site plan approval.
MTO approval
The subject property falls within the Ministry of Transportation’s permit control area. The MTO has requested additional information for their review. In addition, the MTO requires a minimum 14.0 metre setback along the Highway 407 Right-of-Way (ROW) or future highway ROW limits. All structures and elements essential to the site such as utilities, fire routes, required parking, etc. are proposed to be set back a minimum of 14 metres to meet MTO requirements.
Environmental Impact
Assessment required
Due to the site’s proximity to lands identified in the Official Plan as being potentially contaminated, staff have requested the submission of an Environmental Impact Assessment report for review.
Compensation for tree
removal
In earlier
discussions with the applicant on a previous development concept, staff
identified several trees which were on the property and had requested a tree
inventory and preservation plan be provided as part of a development
submission. Subsequent to this request, one significant tree was removed
without Town review or approval. As part of the discussions for this
proposal, the owner has been requested by staff to consider opportunities to
compensate for the loss of the mature tree. Suggestions by staff include
additional on-site landscape planting (enhanced size and numbers), valleyland
planting or restoration work, or perhaps a contribution to the Town’s Trees for
Tomorrow Program. This request will be discussed further with the Owner
and has been included as a condition of approval.
PowerStream Service
Facility was high parking demand
As per the Town’s parking by-law, a building of this size
would normally generate the need for approximately 98 parking spaces whereas
316 spaces are proposed. PowerStream has
indicated the proposed spaces are required in order to accommodate the parking
of employee vehicles (approximately 165 spaces) as well as the parking of
PowerStream fleet service vehicles (approximately 151 spaces). As mentioned below, staff have requested that
additional landscaping be provided on site to screen the parking area proposed.
Screening of outdoor storage/parking areas
The western half of the site is proposed to be used for outdoor storage of PowerStream materials and equipment. PowerStream has advised that the area will contain low profile (maximum 2 metres in height) items such as transformers and hydro poles. Through the site plan review process, staff have requested the Owner provide screening along the south property line, next to Highway 407. A minimum 6 metre landscape strip, densely planted with a combination of evergreen and deciduous trees has been recommended. The Owner is proposing a 3 metre landscape strip along the south property line, however, staff have identified an opportunity to reconfigure the driveway aisle width in order to accommodate additional landscaping without compromising the number of parking spaces proposed. A minimum 3 metre landscape buffer has been requested along all other property lines, with the exception of the valleyland 10 metre buffer required by the TRCA.
Sustainability measures
PowerStream has indicated that that are considering a number of sustainability measures for incorporation within the proposed development, such as:
· White reflective roof for entire building;
· Permeable surface for employee parking area;
· Rainwater harvesting for washing of fleet vehicles;
· Drought resistant grasses;
· Natural ventilation (no air conditioning) for the service area; and,
· High efficiency lighting and plumbing fixtures.
Due to the site’s close proximity to the creek and valleylands and the large amount of surface parking proposed, staff and the TRCA have recommended sustainable stormwater practices such as bio filters, infiltration galleries and bio swales. Staff will continue to work with the owner and PowerStream to incorporate additional sustainability measures, where possible, within the proposal.
Not applicable.
The Proposal aligns with the
Town’s strategic priority of Growth Management.
The proposed Power Stream facility will provide for improved hydro power
supply and service for growth in
This application has been circulated to applicable departments and agencies for comment, and their requirements have been included as conditions of approval.
RECOMMENDED BY:
________________________________ _________________________
Valerie Shuttleworth, MCIP, RPP Jim
Baird, MCIP, RPP
Director of Planning and Urban Design Commissioner of Development Services
Figure 1 – Location Map
Figure 2 – Area Context/Zoning
Figure 3 – Air Photo
Figure 4 – Proposed Site Plan
Figure 5 – Proposed Elevations
Applicant:
Wes Surdyka Architect Inc. – Wes
Surdyka
M3J 1M8
Tel: 416-630-2254
Fax: 416-630-5741
File path: Amanda\File 08
124764\Documents\Recommendation Report
APPENDIX ‘A’- Conditions of Site Plan Approval