Quality Management System Implementation Progress |
|
|
|
|
|
|
DWQMS Element |
Documentation Completed |
Implementation |
Target Date
to complete |
|
Partial |
All |
Partial |
Full |
1. Quality
Management System |
P |
|
P |
|
June 2008 |
Document a QMS that meets the
requirement of the DWQMS |
2. Quality Management System
Policy |
|
P |
|
P |
Completed |
Document a QMS Policy that
provides the foundation for the QMS |
3. Commitment and Endorsement |
|
P |
|
P |
Completed |
Contain a written endorsement
of its contents by Top Management and the Owner |
4. Quality Management System
Representative |
|
P |
|
P |
Completed |
Identify a QMS Representative |
5. Document and Records
Control |
|
P |
|
P |
Completed |
Document a procedure for
document and records control |
6. Drinking-Water System |
|
P |
|
P |
Completed |
Document to provide a
description of the drinking-water system |
7.
Risk Assessment |
|
P |
|
P |
Completed |
Document a risk assessment
process that identifies hazardous events |
8. Risk Assessment Outcomes |
|
P |
|
P |
Completed |
Document the identified
hazardous events & identified control measures |
9. Organizational Structure,
Roles, Responsibilities and Authorities |
|
P |
|
P |
June 2008 |
Document the org. structure
including respective roles, responsibilities and authorities, and |
communicate this information
to Operating Authority personnel and the Owner |
10. Competencies |
P |
|
P |
|
June 2008 |
Identify and arrange for
necessary training for all personnel whose work affects drinking water
quality |
11. Personnel Coverage |
P |
|
P |
|
June 2008 |
Ensure that sufficient
personnel meeting the identified competencies are available for duties that |
directly affect drinking water
quality |
12.
Communications |
P |
|
P |
|
June 2008 |
Describes how the relevant
aspects of the QMS are communicated between Top Management and |
Owner, Operating Authority
personnel, Suppliers and the Public |
13. Essential Supplies and
Services |
P |
|
P |
|
June 2008 |
Identify all supplies and
services essential for the delivery of safe drinking water, and to ensure the |
quality of essential supplies
& services in as much as they may affect drinking water quality |
14. Review and Provision of
Infrastructure |
P |
|
P |
|
June 2008 |
Document the annual review of
the adequacy of the infrastructure necessary to operate and maintain |
the subject system |
15.
Infrastructure Maintenance, Rehabilitation and Renewal |
P |
|
P |
|
June 2008 |
Document a summary of the
Operating Authority's infrastructure maintenance, rehabilitation and |
renewal programs for the
subject system |
16. Sampling,
Testing and Monitoring |
P |
|
P |
|
June 2008 |
Document sampling, testing and
monitoring activities throughout the drinking water system |
Quality Management
System Implementation Progress |
|
DWQMS Element |
Documentation Completed |
Implementation |
Target Date
to complete |
|
Partial |
All |
Partial |
Full |
17.
Measurement & Recording Equipment Calibration & Maintenance |
P |
|
P |
|
June 2008 |
Document the activity for
calibration and maintenance of measurement and recording equipment |
18. Emergency Management |
|
P |
P |
|
June 2008 |
Being
prepared for emergency situations that could result in the loss of the
ability to maintain the |
supply of safe drinking water
to consumers; Identify what could happen in the system to cause an |
emergency, and have processes
and procedures in place to prepare and response |
19. Internal Audits |
|
P |
P |
|
September 2008 |
Document and perform internal
audits that conform to the requirement of QMS at least one every |
twelve months |
20. Management
Review |
|
P |
P |
|
October 2008 |
Document and conduct
management review that evaluates the continuing suitability, adequacy and |
effectiveness
of the QMS at lease once every twelve months - Top Management must ensure
the |
review is performed identified
deficiencies, and reports the results to the Owner |
21. Continual Improvement |
P |
|
P |
|
June 2008 |
Continually improve the
effectiveness of its QMS through the use of corrective actions |
Documentation
Status |
|
Partial - Not all the required
documentations for the element have been completed |
|
All - All required
documentations for the element have been completed |
|
|
Implementation |
|
Partial
- Only part of the documentation and activity for the element have been
communicated to staff, and limited practice been put in place |
|
Full
- All completed documentations and activities for the element have been
communicated to staff, and all practice been put in place |
|
|
*
During the internal audit process, verification will be carried out in order
to determine the effectiveness of the implementation of each element |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|