Report to: Development
Services Committee Report
Date: May 5, 2009
SUBJECT: RECOMMENDATION
REPORT
Jade–Kennedy Development Corporation (South
Unionville Square)
East
side of Kennedy Road
between Castan Avenue
and future South Unionville Avenue
Applications for zoning
by-law amendment and site plan approval for a mixed-use development
File Nos. ZA 07 126612 and SC 08 128123
PREPARED BY: Scott
Heaslip, Senor Project Coordinator, Central District
RECOMMENDATION:
- That
the staff report entitled “Jade-Kennedy Development Corporation (South
Unionville Square), East side of Kennedy Road between Castan
Avenue and future South Unionville Avenue, Applications for zoning by-law
amendment and site plan approval for a mixed use development,” be
received.
- That
the zoning amendment application
(ZA 07 126612) be approved and the draft implementing zoning by-law
amendments attached as Appendix ‘B’ be finalized and enacted.
- That the application for site plan
approval for the first phase (the commercial and townhouse component) of
the development be endorsed, in principle.
- That site plan approval be delegated to
the Director of Planning or her designate, to be issued following
execution of a site plan agreement (Site Plan Approval is issued only when
the Director has signed the site plan “approved”), when the following conditions
have been met:
·
Ownership of the subject lands has been
consolidated.
·
The Owner has entered into a site plan agreement
with the Town and the Region of York containing all standard and special
provisions and requirements of the Town and public agencies and the conditions
outlined in Schedule ‘A’ to the May 5, 2009 staff report.
·
The Owner has conveyed to the Town and the
Region of York all of the lands required for South
Unionville Avenue extending from Kennedy
Road to the new north-south local road adjoining
the east boundary of the subject lands, and for the north-south local road,
extending from Ian Baron Avenue
to Helen Avenue.
·
The Owner has conveyed the neighbourhood
park and stormwater management lands on the east side
of the north-south local road to the Town for park and stormwater
management purposes.
·
The Owner has entered into a development
agreement (which may form a component of the site plan agreement) for the
construction of South Unionville Avenue
and the north-south local road and all related infrastructure including the stormwater management pond.
·
The trustee for the South Unionville Landowners
Group has advised the Town in writing that the Owner is in good standing with
the Group.
·
The zoning by-law amendment has come into force
and effect.
- That 78.96 persons (28 townhouse units) of servicing
allocation be granted by Council to Jade-Kennedy Development Corporation.
- That
Council authorize the Mayor and Town Clerk to
enter into a development agreement with the Owner (which may form a component
of the site plan agreement) for the construction of South
Unionville Avenue and the north-south local
road and all related infrastructure including the stormwater
management pond.
- That
the Mayor and Town Clerk be authorized to execute the transfer documents
for the rights-of-way of South Unionville Avenue
and the north-south local road and for the neighbourhood
park and stormwater management blocks.
- That the name “Unity
Gardens Drive” be approved for the
north-south local road from Castan
Avenue to Helen
Avenue.
- That
Council authorize the enactment of a truck
prohibition by-law for Castan
Avenue between the north-south local road (Unity
Gardens Drive) and Piera Gardens.
- That
Council authorize the enactment of a by-law
prohibiting through movements from the proposed driveway across Unity
Gardens Drive into Ian
Baron Avenue.
- That
Staff be authorized and directed to do all things necessary to give effect
to
this
resolution.
EXECUTIVE SUMMARY:
The subject lands have a combined area of 2.66 hectares (6.6
acres) and are located on the east side of Kennedy
Road between Castan Avenue and the proposed
extension of South Unionville Avenue.
The applicant is proposing a phased mixed-use development
including:
- a total of 23,180 m2 (274,447 ft2)
of commercial uses, including a food store (proposed tenant is a T and T
Supermarket) and a range of retail, restaurant, office and service uses.
- 28
three-storey townhouse units facing onto the local residential street to
the east.
- a future 8-storey, +/-200 unit apartment building
focused on the intersection of South Unionville
Avenue and Kennedy
Road.
In October, 2008 Council adopted Official Plan Amendment No.
173, which extended the “Community Amenity Area” designation across the entire
site and incorporated site-specific development standards reflecting the
proposed development. The staff report
recommending approval of the Official Plan Amendment advised that staff would
report on the implementing zoning by-law and site plan approval once the
project plans had been refined to the satisfaction of staff.
On Thursday
February 26, 2009, the Ward Councillor
hosted a Community Meeting to review the project plans with the community. The concerns raised by residents at the
meeting, including traffic impact, truck access, parking, completion of South
Unionville Avenue, park, etc. have been or are
being addressed as outlined in this report.
Currently available servicing
allocation is sufficient only for the 28 townhomes. The apartment component is not included in
the current site plan application. The zoning for the apartment component will
be subject to a holding provision to withhold construction until servicing allocation
has been assigned.
Staff recommend approval of the
applicant’s rezoning and phase 1 site plan applications as outlined in this
report.
The purpose
of this report is to discuss and recommend approval of rezoning and phase 1
site plan applications for a proposed mixed-use retail/residential development
on the east side of Kennedy Road, south of Highway 7.
Subject Lands and Area
Context
The overall
development site has an area of 2.66 hectares (6.6 acres) and is located on the
east side of Kennedy Road between Castan Avenue and the
proposed extension of South Unionville Avenue (Figure
1). Two portions of the development site
are not currently owned by the applicant.
The applicant has an agreement with Dougson
Investments Inc. (Village Nissan) to purchase the 0.37 ha (0.91 acre) parcel at
the north east corner of the future intersection of Kennedy
Road and South
Unionville Avenue.
The Town owns a small residual parcel in the interior of the site which
was originally
conveyed to the Town for a future municipal lane and is no longer
required. The Legal Services Department will be reporting to Council shortly
regarding the sale of this parcel to the applicant. Ownership of the site will
need to be consolidated before the proposed development can proceed.
The applicant
owns additional lands to the east which are designated “Neighbourhood Park” in the
South Unionville Secondary Plan.
Official Plan and Zoning
The lands are
designated “Community Amenity Area” by Official Plan Amendment No. 173, which
was adopted by Council in October, 2008. OPA 173 includes site-specific
development standards regulating the distribution of residential and
non-residential uses, residential density and building heights. It also includes design guidelines addressing
built form, massing, landscaped open space and other design matters.
The lands are
currently zoned with a number of different agricultural and residential zone
categories. (Figure 2)
Proposal (Figures 4 – 10)
The development includes a two-level, 1224 car underground
garage structure extending under the
entire site (see Figures 7 and 8), and the following structures erected above
this garage base (see Figure 4):
-
an
internal vehicular courtyard containing surface parking for 159 cars, access to
the service areas and the ramps to the underground parking garage.
- 8-storey mixed use Building ‘A’ with +/-
200 residential units above 1011 m2 (10,882 ft2) of
ground level commercial space and located at the corner of Kennedy
Road and South
Unionville.
- 2-storey
commercial Building ‘B’ with 3228 m2 (34,748 ft2) of
ground level commercial space and 1506 m2 (16,210 ft2) of
office space above.
- 2-storey
commercial Building ‘C’ with a 4663 m2 (50,192 ft2) supermarket
on the ground floor level (proposed tenant is T and T Supermarket) and a
multi-unit retail mall above.
- 2-storey
mixed use Buildings ‘D’ and ‘E’ with 3178 m2 (34,209 ft2)
of ground level retail
space and 4778 m2 (51,431 ft2)
of office space above.
-
28 3-storey townhouse units backing onto and attached to Buildings ‘D’
and ‘E’ and facing onto the future north-south local road.
-
a glazed central lobby containing escalators
connecting Buildings ‘B’ and ‘C’ to the
underground parking levels. The main
access to the supermarket is though this lobby.
The
townhouses will be faced with a combination of architectural masonry base and
brick. Each townhouse unit will have a
terrace at the third floor level and two parking spaces within underground
parking level P1, directly adjacent to the unit.
The principle vehicular access will be from South
Unionville Avenue.
Secondary accesses are proposed to Castan Avenue and the
proposed north-south local road on the east side.
Landscaping with trees will be provided at grade within
the courtyard and above on roofs of the buildings, as well as on the perimeter
landscape areas.
The exterior materials of the commercial component of the
project will include precast, glass and spandrel
glass (Figures 9 and 10).
The site plan application excludes the 8-storey +/- 200
unit apartment building proposed for the north-west corner of Kennedy
Road and South
Unionville Avenue because servicing allocation is not
currently available for this component.
However, the entire underground parking garage, including the parking
for the apartments, will be constructed with the first phase.
Road, Park
and SWM Dedication (Figure 11)
The project will facilitate the following: construction of
a new north-south local road between Castan Avenue and Helen
Avenue and the section of South
Unionville Avenue between Kennedy
Road and the new north-south local road;
and the completion of the adjoining neighbourhood
park/stormwater management block.
Retail component implements planned function of
Community Amenity designation
The
“Community Amenity Area” designation along the Kennedy
Road frontage of the South Unionville
Community is intended to be the location of commercial uses serving this
community, in pedestrian friendly, mixed-use development(s).
The proposed
development, with its mix of retail, food, office and residential uses,
implements this vision and addresses the need for local retail commercial
facilities to serve the residents of the South Unionville Community.
Appropriate location for higher density residential
component
The subject
property is adjacent to Kennedy Road, on VIVA and
YRT routes and within walking distance of the Unionville Go Train station.
Use and built form transition to low density
residential community to east
The development is comprised of a
series of interconnected buildings surrounding an internal vehicular
courtyard. The overall scale is
mitigated by locating the taller and more substantial structures along the
major arterial (Kennedy). In addition,
perception of mass is reduced by incorporating buildings of varied
architectural expression and by providing substantial setbacks, street-level
views in and pedestrian connections through the block at the transition points.
The 3 storey townhomes will provide an appropriate face to the purely
residential community to the east and a transition to the commercial component
of the development and the future higher density component.
Street Level Uses and Public Realm
The proposed
development has a strong street edge relationship with all of the adjoining
roads. Staff have
worked with the developer to ensure that the uses on the ground floor level
maintain an “at grade” relationship with the adjoining streets all around the
development notwithstanding the change in grade across the site. The developer has committed to provide a high
quality public realm throughout the project: safe, accessible, convenient and
attractive pedestrian connections and urban public amenities such as street
furniture, special finish materials and adequate landscaping. These details will be finalized during review
of the detailed plans for the project and secured in the site plan agreement.
Parking is well designed
Parking will
provided in accordance with the Town’s parking by-laws, which require parking
to be provided at the following ratios: :
retail - 1 space per 18.5 m2
office - 1 space per 30 m2
townhouses - 2 spaces per unit*
future apartments - a
maximum of 1.2 spaces per unit, inclusive of visitor parking*
* In consideration of the location of
the property on VIVA and YRT routes and
within walking distance of the Unionville Go Train station, the Markham Centre
parking standard is being applied to the residential components.
The majority
(over 85 %) of the parking is within a two-level underground garage. The surface parking area is internalized
within the development and located behind the buildings.
The surface parking
area and the upper level of the underground garage (level P1) are designated
for retail customers. The second level
of the underground (level P2) is designated for employees, and residents of and
visitors to the future apartment building.
The 28 townhomes will each have two parking
spaces within underground parking level P1 directly adjacent to the units.
To ensure
that Parking Level P1 is safe, convenient and attractive to customers, the
following features have been incorporated into the design:
Vehicular access designed to minimize impact on residential
community to east
Traffic
impact is a potential concern where a commercial development adjoins a
residential community. To address this
concern, the following features have been incorporated into the design of the
proposed development:
Servicing and garbage areas internalized
All of the
loading and waste collection facilities are oriented to the central parking
court and are inset into the buildings.
The residents of the 28 townhomes will take
their garbage to one of two communal waste pick up areas within parking level
P2. This will ensure that the residents
do not store their recycling containers on their front porches, which can be
unsightly. Staff will continue to work
with the applicant to ensure adequate screening of service, waste collection
areas and utilities enclosures along public streets.
Development will facilitate South
Unionville Avenue and local road connection to Castan
As a
condition of approval, the applicant will be required to enter into a
development agreement with the Town to secure the dedication and the
construction of the local road adjoining the east boundary of the development
from Castan Avenue south to Helen Avenue and the
section of South Unionville Avenue between Kennedy Road and the new local road,
as well as all related infrastructure (see Figure 11). All of the required lands are owned or
controlled by the applicant. This will
complete a key missing section of South
Unionville Avenue and provide a convenient north-south
road connection between Castan Avenue and the
signalized intersections at South Unionville/Kennedy and Helen/Kennedy.
The
intersection of South Unionville Avenue and the
local road will be a traffic circle. This is intended to identify this location
as the boundary between the higher density mixed-use and commercial area along Kennedy
Road and the lower density residential
community to the east.
Development will facilitate completion of adjoining neighbourhood
park
As a
condition of approval, the applicant will be required to convey the lands they
own to the east of the new local road to the Town for stormwater
management and parkland purposes. (see Figure 2) The Town owns the remainder of the lands to
be occupied by the park, so this conveyance will complete the park block,
allowing the Town to proceed with park development. Staff are working
with the applicant to have the stormwater management
facility be located underground, allowing the park programming to extend across
what would otherwise be a open stormwater management
pond.
Concerns expressed by area residents have been
addressed
On Thursday February 26, 2009, the Ward Councillor hosted a Community Meeting to review the project
plans with the community. While the
residents were generally supportive of the proposed development, a number of
concerns were expressed, as follows:
Traffic impact – a number of residents were
concerned that traffic generated by the proposed development will impact on
local streets. The traffic impact study
submitted by the applicant has been reviewed and accepted by the Transportation
Section of the Engineering Department.
As outlined above, staff have worked with the
applicant to focus vehicular access South
Unionville Avenue and away from the adjacent local
residential streets.
Truck access - Residents expressed concern that
trucks delivering to the proposed development will continue east on Castan Avenue. This concern will be addressed by the
recommended truck prohibition on Castan Avenue.
Parking capacity and street parking – Residents expressed concern that parking will
overflow onto nearby local streets.
However, the proposed development will be providing parking in
accordance with the Town’s by-laws. As outlined above, staff
have worked with the applicant to ensure that the underground parking
garage will be safe, convenient and attractive so that patrons will choose to
park in the garage and not on nearby streets.
Completion of South Unionville Avenue – The applicant
will be constructing the first section of South
Unionville Avenue, east of Kennedy
Road (see Figure 11). Residents expressed concern that there
continue to be gaps in South Unionville Avenue. The two remaining missing sections of South
Unionville Avenue are:
While staff
share the desire of the community to see South Unionville Avenue completed, the
largest gap, immediately east of the subject lands, is over non-participating
owner’s lands. Staff will report to
Development Services Committee separately regarding options for the completion
of these gaps in South Unionville Avenue. In the interim the roads to be constructed
with the proposed development will significantly improve access from the South
Unionville community to Kennedy Road with an additional signalized intersection
(South Unionville Avenue at Kennedy Road), and a new street between Castan Avenue and Helen Avenue.
Shopping carts – Residents expressed concern that
shopping carts will be left on local streets and parks. The applicant advises that the grocery carts
will be equipped with devices which disable the wheels when the carts are removed
from the property. This obligation will
be secured in the site plan agreement.
Neighbourhood park – The
residents are eager for the neighbourhood park to the
east of the subject property to be completed as soon as possible. The park and stormwater
management lands are to be conveyed by the applicant to the Town as a condition
of approval of the proposed development, and will complete the park block,
allowing park construction to proceed. The community will be consulted as part
of the design process for the park.
Environmental and Sustainability Initiatives
The
development incorporates the following environmental and sustainability initiatives:
- installation of a building automation system (BAS) or
energy management control system (EMS) to optimize the operation of
electrical and mechanical equipment – options include, but are not limited
to, time of day scheduling, optimized equipment start/stop and run times,
daylight control for ambient lighting, energy efficient motor and
electrical equipment, temperature and humidity controls, demand
ventilation and free cooling measures.
- roof-top rain
water harvesting and re-use to supplement water closets, urinals, and
irrigation systems. The applicant is considering installing on-site car
wash facilities within the underground garage, which would also use the
harvested rain water.
- high albedo (reflective) roofs to reduce heat island
effect.
- majority of
parking below grade minimizes the heat island effect of a large surface parking lot.
- dual flush
water closets, ultra low flow urinals and low flow sinks and lavatories.
- the use of
locally extracted and manufactured materials, wherever possible.
- use of
recycled materials including recycled steel and slag in concrete mixtures.
At the request of staff, the
applicant discussed with Markham District Energy the potential to connect the
development to district energy. Markham
District Energy advised staff and the applicant that because the subject lands
are a considerable distance from their existing infrastructure and since none
of the other lands in the vicinity are likely candidates for district energy,
it would be too costly to extend their system for this one development.
In accordance with Council direction
regarding servicing allocation, the future 8-storey apartment building will be
required to be minimum LEED Silver certified.
Project plans are acceptable subject to minor
refinements
The applicant
has worked very constructively with the Town Architect and has made significant
changes to the design of the development to address staff’s concerns. The overall design of the development is now
satisfactory to staff. Minor refinements
to address items including the interim treatment of the adjoining portion of
the development before the apartment component is constructed, as well as
finishing materials and detailing, will be incorporated into the final project
plans.
Name for new local road
When Helen
Avenue was subdivided in the 1920’s, it was
marketed under the name “Unity Gardens.” From the
1920’s to the mid 1950’s, the residents of Helen Avenue communally owned and
operated a community market/social hall, which they called “Unity Gardens,” on
the north side of Helen Avenue at Kennedy Road.
The name “Unity Gardens Drive” was
reserved a number of years ago for this street to recognize the local heritage.
Phase 2 apartment component must
wait for servicing allocation
A portion of the subject site was originally part of
the Chiavatti et. al. plan of subdivision (19TM-99021), which was draft approved
and assigned servicing allocation of 87 units in 2001. However, only 36 units
proceeded to registration. Of the
remaining servicing allocation, 20 apartment units were transferred to East
Markham Non-Profit Homes Inc.(EMNPH), leaving
sufficient residual allocation for the townhouse component of the
proposed development. There is no
available allocation for the +/- 200 proposed apartment units. The zoning by-law amendment will include a
holding provision to withhold construction of the apartment component until
servicing allocation has been assigned. Staff
will be reporting to Committee in May 2008 on the next round of 2011/2012
servicing allocation, and construction lead times.
Zoning By-law Amendment
The draft
zoning by-law (Appendix ‘B’) zones the property “Community Amenity Area” under
By-law 177-96, as amended. The by-law
incorporates site specific development standards (building height and setbacks,
residential unit counts, commercial floorspace, etc.)
reflecting the proposed development.
The by-law
includes two holding provisions, as follows:
·
to prohibit any development on the lands until the
Owner has conveyed to the Town and the Region of York the lands required for
South Unionville Avenue extending from Kennedy Road to the new north-south
local road adjoining the east boundary of the subject lands, the lands required
for the north-south local road, extending from Ian Baron Avenue to Helen
Avenue, and the neighbourhood park and stormwater management lands on the east side of the north-south
local road, and has entered into a development agreement with the Town to
secure construction of the roads, stormwater
management facility and related infrastructure and a site plan agreement for
the proposed development.
FINANCIAL
TEMPLATE
Not
applicable.
The proposed
development supports the Town’s Strategic Priorities, as follows:
Growth
Management - intensification
along a transit corridor
Transportation/Transit -
higher density, mixed-use along transit corridor and close
to the Unionville GO Station mobility hub.
Environment - project incorporates sustainable
development features.
The proposed
development has been circulated to internal Town departments and external
agencies. All comments/requirements of these departments and agencies are or
will be reflected in the final project plans, or will be secured in the site
plan/development agreement.
RECOMMENDED BY:
_____________________________ ________________________
Biju
Karumanchery, M.C.I.P., R.P.P. James
Baird, M.C.I.P., R.P.P
Senior
Development Manager Commissioner,
Development Services
Figure 1 - Location Map
Figure 2 - Area Context
Figure 3 - Air Photo
Figure 4 - Site plan
Figure 5 - Ground Floor Plan
Figure 6 - Second Floor Plan
Figure 7 - Parking Level P1
Figure 8 - Parking Level P2
Figure 9 - Perspective from West
Figure 10- Perspective from
East
Figure 11- External
Conveyances and Works
Appendix ‘A’ - Conditions of Site Plan Approval
Appendix ‘B’ - Draft Zoning By-law Amendments
Applicant: Hal Kersey
Mady Development Corporation
Tel: (905) 944 – 0907, ext.116
Email: hkersey@madycorp.com
APPENDIX A
Conditions of
Site Plan Approval
Jade–Kennedy Development Corporation (South
Unionville Square)
East
side of Kennedy Road between Castan Avenue and future South
Unionville Avenue
Prior to the
execution of the site plan agreement, the Owner shall submit:
- site plans,
elevation drawings, underground parking garage layout plans, grading,
servicing and engineering drawings that comply with all requirements of
the Town and authorized public agencies, to the satisfaction of the
Commissioner of Development Services.
- landscape Plans,
including streetscape details, prepared by a Landscape Architect having
membership with the Ontario Association of Landscape Architects.
- a storm
water management report and a functional servicing report.
- a
geotechnical report.
- an
environmental site assessment report, phase 1/2.
for endorsement or approval by the Town.
The Owner
shall enter into a Site Plan Agreement with the Town and the Region of York,
containing all standard and special provisions and requirements of the Town,
the Region and other public agencies including, but not limited to, the
following:
1.
Provisions for the payment by the Owner of all
applicable fees, recoveries, development charges, parkland dedications
(including cash-in-lieu) and financial obligations related to applicable
Developers Group Agreements.
2.
Provisions to ensure implementation of the
recommendations of the approved reports.
3.
Provisions for satisfying all requirements of Town
departments and public agencies.
4.
Provisions to ensure that all shopping carts will be
equipped with devices to discourage them from being removed from the property.
5.
Provisions to secure the Owners commitment to
implement the proposed environmental and sustainability initiatives.
6.
Provision that the Owner acknowledges and agrees that
the future apartment component will be minimum LEED
Silver certified.
7.
Provisions to ensure that any restaurant uses are
equipped with odour control units.
8.
Provisions to ensure that any car wash facilities
incorporate oil/grit separators.
This
endorsement shall lapse and site plan approval will not be issued, after a
period of three years commencing on May 5, 2009, in the event that the site plan agreement is not
executed within that period.