Report to: Development Services Committee Date Report Authored: June 15, 2010
SUBJECT: Detailed
Design for Highway #404 Mid-Block Crossing Between Highway #7 and 16th
Avenue
PREPARED BY: Dale
MacKenzie, Senior
Alick
Wong, Manager
RECOMMENDATION:
1)
That
the report entitled “Detailed Design for Highway #404 Mid-Block Crossing
between Highway #7 and 16th Avenue”, be received;
2)
And
that the Mayor and Clerk be authorized to execute a cost sharing agreement for
the design of the Highway 404 Crossing (between Highway 7 and 16th
Avenue) between the Town of Markham, the Town of Richmond Hill and
the Region of York, to the satisfaction
of the CAO and the Town Solicitor;
3)
And
that the contract “116-R-10 Detailed Design of Highway 404 Crossing” (between
Highway 7 and 16th Avenue) and the “Detailed Design of the Highway
404 Off-Ramp Extension” be awarded to the highest ranked/ second lowest priced
bidder URS Canada Inc. subject to the execution of the cost sharing agreement;
4)
And
that the Town of Markham upfront the Highway 404 Crossing design cost
($ 839,637.84) with subsequent recovery from The Town of Richmond Hill
and the Region of York (33.3% each) within 45 days after receipt of invoices;
5)
And
that a contingency in the amount of $73,267.20 inclusive of HST be established
to cover any additional design costs for the Highway 404 Crossing and that the
Director of Engineering be authorized to approve the expenditure of this
contingency amount up to the specified limit in accordance with the Expenditure
Control Policy;
6)
And
that the Town of Markham be authorized to pay as much as 100% of the cost of
the ramp extension design ($772,517.28) if cost sharing arrangements
with the Region of York and/or the Town of Richmond Hill are not successful;
7)
And
that a contingency in the amount of $65,126.40 inclusive of HST be established
to cover any additional design costs for the Highway 404 off-ramp extension at
Highway 7 and that the Director of Engineering be authorized to approve the
expenditure of this contingency amount up to the specified limit in accordance
with the Expenditure Control Policy;
8)
And
that the Region of York and the Town of Richmond Hill be requested to cost
share the fees for the detailed design of the Highway 404 Northbound Off-Ramp Extension;
9)
And
that the successful Proposal be funded from the Capital Accounts as noted in
the report;
10)
And
that the Finance Department be directed to combine the following accounts
083-5350-7267-005, 083-5350-9318-005 and 083-5350-9319-005 into account 083-5350-10050-005
and that the new account be used to finance the design and construction of the
Highway 404 Crossing;
11)
And
that the Finance Department be directed to combine the following accounts 083-5350-7271-005
and 083-5350-7712-005 into account 083-5350-9317-005 and that the new account
be used to finance the design and construction of the Highway 404 Off-Ramp
Extension;
12)
And
that staff be authorized and directed to do all things necessary to give effect
to this resolution.
EXECUTIVE SUMMARY:
Not Applicable
1. Purpose 2. Background 3. Discussion 4. Financial
·
To
obtain Council approval to enter into a Cost Sharing Agreement with the Region
of York and the Town of Richmond Hill (33.3% each) for the detailed design of
the Highway 404 Mid-block crossing between Highway 7 and 16th
Avenue.
·
To
award the contract for the detailed design of the Highway 404 Mid-Block Crossing
between Highway 7 and 16th Avenue subject to the execution of the
cost sharing agreement;
·
To
award the contract for the detailed design of the Highway 404 off-ramp extension
at Highway 7 to be financed if necessary (100%) at the Town’s expense.
·
To
request the Town of Richmond Hill and the Region of York to cost share the
design of the Highway 404 northbound off-ramp extension at Highway 7.
·
To
obtain Council approval to combine the capital accounts for the Highway 404
Crossing and the Highway 404 Off-Ramp Extension for ease of financial
administration.
BACKGROUND INFORMATION
Between Highway 7 and
The Markham Transportation Planning Study (June 2002) indicated that
crossings of Highway 404 would help to achieve a balanced distribution of
traffic demand by providing capacity to the network. This balanced distribution is important given
that significant congestion currently being experienced on Highway 7.
To address these traffic issues a Municipal Class Environmental Assessment Study to explore the need for an additional east-west roadway across the Highway 404 between Highway 7 and 16th Avenue was completed in 2005. The Environmental Study Report noted that a mid-block collector crossing Highway 404 between Highway 7 and 16th Avenue will provide a direct route to the Valleywood Business Park, Allstate Business Park, East Beaver Creek Business Park and will reduce congestion on the adjacent arterial roads (Highway 7and 16th Avenue) by providing an alternative east-west connection between Richmond Hill and Markham as noted in Attachment ‘B’.
The next step in implementing the mid-block collector is to commence the
detailed design. This design is to be
cost shared equally by the Town of Markham, the Town of Richmond Hill and the
Regional Municipality of York (33.3% each to a maximum of $300,000.00 each).
In addition to the Highway 404 crossing, local traffic studies recommend
a northbound off-ramp extension for Highway 404 at Highway 7, which will
connect to the mid-block collector as noted in Attachment ‘B’. Existing conditions show operational problems
at intersections within the area that would be alleviated with the Highway 404
Ramp Extension.
The Town of Markham completed a Municipal Class Environmental Assessment
for the Highway 404 Off-Ramp Extension on January 31, 2008. The Class EA recommended that the off- ramp
be extended north of Highway 7 to the future Highway 404 crossing. We are now in a position where the detailed design of
the off-ramp extension can be completed.
Representatives from the Town of Richmond Hill, the Region of York and
the Town of Markham met several times and have finalized terms of a Cost
Sharing Agreement for the design works for the Highway 404 crossing.
The principles of the “Agreement” include the following:
HIGHWAY 404 OFF-RAMP EXTENSION AT HIGHWAY 7
As part of the EA study, detailed analyses of the traffic operations in
the area on each side of the Highway 404 from Highway 7 north to 16th
Avenue were completed.
The analyses found that many of the study area intersections are operating
at or above capacity. The intersections
experience notably high delays and high volume-to-capacity ratios with several
critical movements. The summary of the
analyses found that with the installation of the extension of the northbound
off-ramp north of Highway 7, traffic congestion on both sides of the Highway
404 corridor will improve and that the benefits of this roadway improvement
will be experienced by the Town of Richmond Hill, the Region of York and the
Town of Markham.
As the Town of Richmond Hill and the Region of York will also benefit
from this off-ramp extension, a request to both municipalities to participate
in the cost sharing of the design works is recommended. If the Town of Richmond Hill and the Region
of York decide not to participate in the cost sharing of the design works, a
“Right Turn Only” traffic sign will be installed at the intersection with the
Highway 404 crossing and the ramp extension.
This will restrict traffic from the Off-Ramp Extension to eastbound
movement only to service Markham businesses.
PROPOSAL
CALL INFORMATION
A Request for Proposal #116-R-10 was
issued in accordance with Purchasing By-Law 2004-341. Engineering staff from the Region of York,
Town of
The results of the proposals received are summarized below:
Request
for Proposal
Advertised |
|
Bid closed on |
|
Number obtaining Bid documents |
19 |
Number responding to Bid |
3 |
Company |
Score
(Out of 100 Points) |
Ranking |
URS Canada Inc. |
77.14 |
1 |
AECOM Canada Ltd. |
76.74 |
2 |
Morrison Hershfield Ltd |
68.98 |
3 |
A detailed analysis was completed on the proposals and URS Canada Inc. was awarded the highest scoring. We recommend awarding this contract to URS Canada Inc. as they received the highest scoring, their proposal included all of the required information, and they are acceptable to both the Town of Richmond Hill and the Region of York. (Price range for Highway 404 Mid-block Crossing – $674,394.05 to $866,086.48 and the range for Highway 404 Off-Ramp Extension at Highway 7 - $433,168.92 to $653,291.57)
The total cost of this detailed design project inclusive of
HST is as follows:
ITEM |
Inclusive of HST |
Account
# |
Highway 404 Mid-block Crossing |
|
|
Detailed Design Fees |
$730,213.99 |
10050* |
Contingencies |
$ 73,267.20 |
10050* |
Engineering Department
Capital Administration Fee (4.5%) |
$ 36,156.65 |
10050* |
Total |
$839,637.84 |
|
*Detailed design to be funded from account
#10050 upon consolidation with other accounts.
The Highway
404 Crossing currently has the following Capital Accounts:
a)
Highway 404 Crossing North of Highway #7
Capital Accounts Budget Available Amount
083-5350-7267-005 $1,500,000.00 $1,493,319.00
083-5350-9318-005 $
250,000.00 $ 83,333.00 (Markham Share Only)
083-5350-9319-005 $
448,000.00 $ 134,069.00 (Markham Share Only)
083-5350-10050-005 $1,000,000.00 $ 670,000.00
(Markham Share Only)
Total for all Accounts $3,198,000.00 $2,380,721.00
The Town of Markham’s share of the total design award cost for the
Highway 404 Crossing is $279,879.28 inclusive
of HST;
Highway 404 Off-Ramp Extension at Highway 7 |
Inclusive of HST |
Account
# |
Detailed Design Fees |
$653,291.57 |
9317* |
Contingencies |
$ 65,329.16 |
9317* |
Engineering Department Capital Administration Fee (7.5%) |
$ 53,896.55 |
9317* |
Total |
$772,517.28 |
|
*Detailed
design to be funded from account #9317 upon consolidation with other accounts.
The Highway 404 Off-Ramp Extension currently has the following Capital
Accounts:
b)
Highway 404 Off-Ramp Extension at Highway #7
Capital Accounts Budget Available
Amount
083-5350-7271-005 $199,846.00 $
31,430.44
083-5350-7712-005 $206,200.00 $206,200.00
083-5350-9317-005 $550,000.00 $550,000.00
Total for all Accounts $956,046.00 $787,630.44
The total design costs for the
Highway 404 Off-Ramp Extension is $772,517.28 inclusive of HST;
“Not applicable”
The Highway 404 Crossing and the Highway 404 Off-Ramp Extension provides
the necessary infrastructure to allow for improved traffic movement between the
Town of Richmond Hill and the Town of Markham, which in turn will improve the
traffic congestion along Highway 7 and the areas on either side of Highway 404.
The extension of the Highway 404 northbound off ramp will also improve the
level of service on Highway 7.
These projects are in line with the Town of
The Finance and Legal Departments have been
consulted and their comments have been incorporated.
RECOMMENDED BY:
________________________
______________________________
Alan Brown, C.E.T. Jim Baird, M.C.I.P., R.P.P.
Director of Engineering Commissioner, Development Services
Attachment ‘A’ Cost Sharing Agreement
Attachment ‘B’ Schematic of Highway 404 Crossing and Highway 404 Off-Ramp
Extension