Report to: Development Services Committee                            Report Date: June 15, 2010

 

 

SUBJECT:                        PRELIMINARY REPORT

                                            Stringbridge Investments Limited

                                            Southwest quadrant of Highway 7 and South Town Centre Boulevard

                                            Application for Zoning By-law and Precinct Plan Amendments

                                            File No. ZA 10 109997

                                               

PREPARED BY:              Scott Heaslip, Senior Project Coordinator

                                            Central District, extension 3140

 

 

RECOMMENDATION:

 

1)         That the staff report dated June 15, 2010 titled “PRELIMINARY REPORT, Stringbridge Investments Limited, Southwest quadrant of Highway 7 and South Town Centre Boulevard, Application for Zoning By-law and Precinct Plan Amendments File No. ZA 10 109997,” be received.

 

2)         That a Public Meeting be scheduled for the application.

 

3)         That staff be authorized and directed to do all things necessary to give effect to this resolution. 

 

EXECUTIVE SUMMARY:

 

Not applicable.

 

PURPOSE:

 

The purpose of this report is to provide preliminary information regarding an application by Stringbridge Investments Limited to amend the zoning by-law and precinct plan to permit  up to 500 residential apartment units in conjunction with a hotel and accessory uses at the southwest quadrant of Highway 7 and South Town Centre Boulevard. Amendments to the performance standards contained in the zoning by-law are also being requested. 

 

This report, which seeks authorization to hold a statutory Public Meeting, contains preliminary general information regarding applicable Official Plan or other policies as well as other issues, and should not be taken as Staff’s opinion or recommendation on the applications.

 

BACKGROUND:

 

Subject Property and Area Context (Figures 2 and 3)

This report references four areas of land which are identified on Figure 3, as follows:

  • Stringbridge’s Original Holding – the original Stringbridge holding, including the  lands subsequently conveyed to the Times Group for Majestic Court  
  • Stringbridge’s Current Holding – the lands currently owned by Stringbridge
  • Subject Lands – the lands proposed to be conveyed to Kaptyn Developments
  • Stringbridge’s Remainder Lands – the lands which will remain in Stringbridge’s ownership after the proposed conveyance to Kaptyn.

 

Stringbridge’s current holding comprises a total of 5.66 ha (14 acres) on the south side of Highway 7 between South Town Centre Boulevard and the H.E.P.C. at Rodick Road (Figure 2).  These lands are vacant except for two 1.5 storey office/warehouse buildings fronting on Clegg Road.

 

The focus of this application is the subject lands, approximately 1.1 ha (2.73 acres) in area, on the south side of Highway 7 immediately west of South Town Centre Boulevard. The subject lands are vacant and contain no significant vegetation, and slope southward across the site from Highway 7.   To the east across South Town Centre Boulevard are two office buildings (12 and 5 storeys) – Markham Liberty Square. To the south are two residential buildings (16 and 14 storeys) – Times’ Majestic Court project.  To the north across Highway 7 are two residential buildings (16 and 16 storeys) - Tridel’s Circa @ Town Centre project.  

 

Official Plan and Zoning

The subject lands are designated “Commercial – Community Amenity Area” in the Town’s Official Plan and Community Amenity Area – Major Urban Place in the Markham Centre Secondary Plan (OPA 21).  Lands designated “Community Amenity Area - Major Urban Place” are intended to develop with a mix of residential, commercial, employment and supporting uses, at a high density and intensity of development in keeping with the vision for Markham Centre.

 

The subject lands are zoned Markham Centre Downtown One (MC-D1) under By-law 2004-196.  This zoning permits a broad range of employment and commercial uses including business offices, hotels, trade and convention centres, banquet halls, health clubs, and  retail and service uses.  Residential uses are not permitted in the MC-D1 zone, as the intent of the Precinct Plan at the time of zoning was that these lands would be used for employment purposes.

 

Recent Development History

In 2005, the Town approved an updated precinct plan for Stringbridge’s original holding and incorporated the lands into the Markham Centre Zoning By-law, primarily to facilitate the sale of the south-east portion of lands to Times Investments Limited for their Majestic Court development.  Through this process Stringbridge’s current holding was zoned to permit office/commercial buildings across the Highway 7 frontage.  The overall density was increased to up to 2.5 FSI across the lands, with building heights ranging from 49 metres in the east portion, 40 metres in the centre portion, and 30 metres in the west portion (generally in the range of  7 to 12 commercial storeys).   The zoning permits a broad range of employment and commercial uses, including hotels, but does not permit any residential uses. 

 

In 2007, the Town approved amendments to the precinct plan and zoning by-law to increase the height of the Majestic Court development from 10/12 storeys to 14/16 storeys and to introduce a 0.4 ha (1 acre) public park north-west of the buildings.

 

Proposal

Stringbridge has an agreement to sell the subject lands to Kaptyn Realty, which proposes to develop them with a mixed-use project comprising a hotel and associated conference facility, a range of restaurant and retail uses at-grade along Highway 7, and up to 500 residential units. 

 

The proposed development consists of two buildings extending across the Highway 7 frontage of the lands. The easterly building comprises a 6 storey podium and 16 and 15 storey towers.  The westerly building continues the 6-storey podium and includes 15 and 13 storey towers. The two buildings are linked at the 2nd and 7th storeys [see Figures 4 (site plan) and 5-7 (perspective drawings)].  The hotel component, with a total of 190 guest rooms, occupies portions of the 2nd to 6th floors of the easterly building and tower.   Due to the grade change across the site, the grade-related uses internal and to the rear of the site would consist of residential units, lobbies, ballroom, and mechanical and service areas.  Two levels of below grade parking are proposed and above grade parking internal to the structure is proposed for retail and hotel patrons. 

 

The applicant advises that the proposal is for a high end, luxury hotel format. Although the applicant is not identifying a brand at this point, they advise that it will be a 4 to 4.5 star hotel with a wide range of services. Restaurants, a conference facility, retail stores, a health club and a spa are proposed in association with the hotel.

 

The applicant is requesting the following amendments to the zoning of the subject lands and Stringbridge’s remaining lands:

 

·        The addition of “hotel with apartment dwelling units” as a new permitted use on the subject lands.  (The applicant advises that the purpose of this request is to document their commitment that the proposed residential apartment units will be developed only in conjunction with the hotel.) 

  • Permission for up to 500 residential units on the subject lands, in addition to the 190 hotel suites.
  • Provision that a maximum of 67% of the total permitted floor area on Stringbridge’s current holding be located on the subject lands. (This would require the zoning by-law amendment to reduce the permitted floor area on Stringbridge’s remaining lands.)
  • Building heights over the entire subject lands of 15 metres (minimum) and 53 metres (maximum).  (The zoning by-law currently permits a maximum height of 49 metres over the easterly 50 metres of the subject lands and 40 metres over the remainder.)
  • Adjustments to the building setback requirements for the subject lands to reflect the proposed site plan.

 

 The applicant has not applied for site plan approval.

 

OPTIONS/ DISCUSSION:

 

Issues and concerns to be addressed

 

Loss of employment uses.  The precinct plan approved by Council in 2005 included a mix of employment and residential uses, with employment being the dominant use within the precinct.  The Highway7 frontage of the Stringbridge lands was intended for employment uses.

 

The current proposal significantly reduces the employment potential of the precinct, currently estimated at between 3300 and 4200 persons based on existing zoning permissions, down to between 1200 and 1600 persons.  

 

The Town’s Economic Development Department has reviewed the proposed development and advises that they are concerned with the proposed displacement of employment use with residential use as the subject lands are a prime location for prestige high rise office and other high quality employment uses.  They do acknowledge that high end hotels (as opposed to standard chain hotels) are a useful addition to Markham’s business community, especially if they include a “convention scale” conference facility (a minimum of 3,716 square metres or 40,000 square feet).  However, they note that the applicant has not committed to the type or brand of the hotel, and that the proposed conference facility, at 2,230 square metres or 24,000 square feet, would not be large enough to be a “convention scale” facility.

 

Impact on Stringbridge’s remaining lands:  Stringbridge is proposing to transfer density and building height from Stringbridge’s remaining lands to the subject lands, leaving Stringbridge’s remaining lands with only enough density to permit low rise, suburban type developments with surface parking. The precinct plan submitted by the applicant (Figure 9) illustrates this – 13-16 storey buildings with underground parking on the subject lands, and maximum 4-6 storey buildings with large areas of surface parking on Stringbridge’s remaining lands. This low density, suburban type development is not consistent with the vision for the “Community Amenity Area – Major Urban Place” designation, which is intended to be the location of the highest concentration of development in Markham Centre. 

 

Built form:  The applicant’s proposed massing and built form program, with point towers on podiums, is generally consistent with the overall direction of the Town’s emerging built form expectations for Markham Centre.  Staff do note that the proposed site plan shows 25 metre separation between towers, which is significantly less than the 34 metre separation required by the Town for the Times project.  It should be noted that the submitted plans are conceptual, and the applicant has not applied for site plan approval.

 

Other issues:   Issues identified from staff’s preliminary review of the application include:

 

  • The proposed residential units will generate a requirement for additional parkland dedication.   The Town has the discretion to require either land dedication or payment of cash-in-lieu. 
  • Given the intensity of residential development being proposed, improved access including pedestrian connectivity and potential for public streets will need to be further reviewed in the context of the precinct plan. 
  • The applicant will need to address sustainable development practices in the context of the precinct plan and as part of any site plan approval. 
  • The application will be presented to the Markham Centre Advisory for review and comment.
  • The potential for a Section 37 contribution for community benefits.
  • The application has been circulated to Town departments and public agencies, including York Region Transportation and Works, for review.  Issues including traffic, parking, access, employment lands, phasing, sustainable development practices, and design and built form will be addressed in future staff report(s) on the application. 
  • Comprehensive update to the precinct plan and zoning of Stringbridge’s remaining lands to ensure conformity with the modeling undertaken for Markham Centre in support of the Town’s growth strategy.
  • Consideration in the context of growth targets and transportation requirements for Markham Centre, as part of the Town’s Growth Management Strategy.
  • Potential need to amend Appendix A of the Markham Centre Secondary Plan (OPA 21) to reflect any revisions to the Stringbridge Precinct Plan.

 

 

FINANCIAL CONSIDERATIONS AND TEMPLATE: (external link)

 

Not applicable at this time.

 

 

HUMAN RESOURCES CONSIDERATIONS

 

Not applicable at this time.

 

 

ALIGNMENT WITH STRATEGIC PRIORITIES:

 

The proposed development must be considered in the context of the Town’s “Building Markham’s Future Together” strategic initiatives, in particular Growth Management, Transportation and Environment.

BUSINESS UNITS CONSULTED AND AFFECTED:

 

The applications have been circulated to Town departments and public agencies for comment, which will be addressed in detail in the recommendation report.

 

 

RECOMMENDED BY:

 

 

 

 

______________________________               ________________________

Biju Karumanchery, M.C.I.P., R.P.P.                James Baird, M.C.I.P., R.P.P.

Senior Development Manager                           Commissioner of Development Services

 

 

ATTACHMENTS:

 

Figure 1 – Property Location Map

Figure 2 – Area Context / Zoning  

Figure 3 – Air Photo

Figure 4 – Site Plan

Figure 5 – Perspective Drawing

Figure 6 – Perspective Drawing

Figure 7 – Perspective Drawing

 

Agent: Elizabeth Howson,

Macaulay, Shiomi Howson Ltd.

            600 Annette Street

            Toronto, Ontario

            M6S 2C4

           

            (416) 487-4101

            howson@mshplan.ca

 

 

File path: Amanda\File 10 109997\Documents\Preliminary Report