APPENDIX 2

 

Town of Markham • Year 2002 Report

Local Government                              

1b.   OPERATING COSTS

Governance and political support, and corporate management support

 

Operating costs for governance and political

                 support, and corporate management and support          x100

Total Municipal Operating Costs

7.73% of total municipal operating costs

   Efficiency Measure

Governance and corporate management as a percentage of total municipal operating costs.

 

   Objective

Efficient municipal management.

 

This measure is reported if a municipality uses the general government categories developed by the Ontario Municipal CAO’s Benchmarking Initiative (OMBI) and approved by the province: governance and political support, corporate management and support, program support.

 

If the OMBI FIR categories were used, general government is defined as governance and political support, and corporate management and support.  This is shortened to the phrase “governance and corporate management”.

 

 

Fire Services         

2. OPERATING COSTS

 

Operating costs for Fire Services

(Total assessment  / 1,000)

$0.83 per $1,000 of assessment

   Efficiency Measure

Operating costs for fire services per $1,000 of assessment.

 

  Objective

Efficient municipal fire services.

 

 

 

 

 

 

 

 

 

Town of Markham • Year 2002 Report

Road Services                                    

5.  OPERATING COSTS FOR PAVED ROADS

6.  OPERATING COSTS FOR UNPAVED ROADS

 

Operating costs for paved roads

Total paved lane kilometres

 

Operating costs for unpaved roads

Total unpaved lane kilometres

$649.08 per paved lane kilometre

$4,972.00 per unpaved lane kilometre

    Efficiency Measure

Operating costs for paved (hard top) roads per lane kilometre.

 

    Objective

Efficient maintenance of paved roads.

    Efficiency Measure

Operating costs for unpaved (loose top) roads per lane kilometre.

 

    Objective

Efficient maintenance of unpaved roads.

 

 

7.  OPERATING COSTS FOR

WINTER CONTROL

8.   CONDITION OF ROADS

 

Operating costs for winter control maintenance of roadways

Total lane kilometres maintained in winter

 

         Number of paved lane kilometres rated as good to very good  x100

Total number of paved lane kilometres tested

$1,798.56 per lane kilometre

88.57% of lane kilometres

    Efficiency Measure

Operating costs for winter control maintenance of roadways per lane kilometre.

 

   Objective

Efficient winter control operation.

 

    Effectiveness Measure

Percentage of paved lane kilometres where condition is rated as good to very good.

 

   Objective

Provide a paved lane system that has a pavement condition that meets municipal standards.

 

9.  WINTER EVENT RESPONSES

 

Number of winter event responses

     that met or exceeded municipal road maintenance standards    x100

                           Total number of winter events

98.25% of winter event responses

    Effectiveness

Percentage of winter event responses that met or exceeded municipal road maintenance standards.

                     

   Objective

Provide appropriate winter response.

 

 

 

 

 

 

 

 

 

Town of Markham • Year 2002 Report

Wastewater                                       

12a.  OPERATING COSTS FOR COLLECTION

12b.  OPERATING COSTS FOR

TREATMENT AND DISPOSAL

 

Operating costs for collection of wastewater

Total kilometres of wastewater main

 

Operating costs for treatment and disposal of wastewater

Total megalitres of wastewater treated

$4,498.36 per kilometre of main

$386.50 per megalitre

   Efficiency Measure

Operating costs for the collection of wastewater per kilometre of wastewater main.

 

 

 

Objective

Efficient wastewater collection services.

Efficiency Measure

Operating costs for the treatment and disposal of wastewater per megalitre.

 

A megalitre equals 1,000,000 litres or 1,000 cubic metres.

 

Objective

Efficient water treatment and disposal services.

This measure is reported only if the municipality is responsible for wastewater collection and wastewater treatment and disposal. 

 

Municipalities with integrated systems may also report the individual measures for collection, treatment and disposal of wastewater.

 

 

 

 

 


 

Town of Markham • Year 2002 Report

Wastewater                                       

                                    

12c.  OPERATING COSTS FOR COLLECTION TREATMENT AND DISPOSAL

13.  MAIN BACKUPS        BA

 

Operating costs for wastewater collection, treatment and disposal

Total megalitres of wastewater treated

 

Total number of backed up wastewater mains

Total kilometres of wastewater mains /100

$479.41 per megalitre

1.69 per 100 kilometres of main

   Efficiency Measure

Operating costs for collection, treatment, and disposal of wastewater per megalitre.

 

A megalitre equals 1,000,000 litres or 1,000 cubic metres.

 

Objective

Efficient wastewater services.

Effectiveness Measure

Number of wastewater main backups per 100 kilometres of wastewater main in a year.

 

 

Objective

Prevention of human and environmental health hazards.

 

This measure is reported only if the municipality is responsible for wastewater collection and wastewater treatment and disposal. 

 

Municipalities with integrated systems may also report the individual measures for collection, treatment and disposal of wastewater.

 

 

14.  TREATMENT BYPASS

 

           Estimated megalitres of untreated wastewater        x100

Total megalitres of wastewater, including

 treated and untreated

N/A

    Effectiveness Measures

Percentage of wastewater estimated to have by-passed treatment.

 

 A megalitre equals 1,000,000 litres or 1,000 cubic metres.

 

Objective

Effective wastewater and treatment and disposal services.

 

 

 

 

 

 

 

 

Town of Markham • Year 2002 Report

Water Services                                   

15a.  OPERATING COSTS FOR TREATMENT

15b.  OPERATING COSTS FOR DISTRIBUTION

15c.  OPERATING COSTS

FOR TREATMENT AND DISTRIBUTION

 

Operating costs for treatment of water

Total megalitres treated

 

 

Operating costs for distribution of water

Total kilometres of distribution pipe

Operating costs for treatment and

 distribution of water

Total megalitres treated

$421.70 per megalitre

$6,773.73 per kilometre of distribution pipe

$583.68 per megalitre

    Efficiency Measure

Operating costs for the treatment of water per megalitre.

 

A megalitre equals 1,000,000 litres, or 1,000 cubic metres.

 

    Objective

Efficient production of potable water.

   Efficiency Measure

Operating costs for the distribution of water per kilometre of water distribution pipe.

 

    Objective

Efficient distribution of water.

    Efficiency Measure

Operating costs for the treatment and distribution of water per megalitre (Integrated System).

 

A megalitre equals 1,000,000 litres, or 1,000 cubic metres.

 

  Objective

Efficient production and distribution of water.

 

 

This measure is reported if the municipality is responsible for the treatment of water.

 

This measure is optional for municipalities with integrated water systems since the FIR does not record the measure.

 

 

This measure is reported if the municipality is responsible for the distribution of  water.

 

This measure is optional for municipalities with integrated water systems since the FIR does not record the measure.

 

 

This measure is reported only if the municipality is responsible for both the treatment and distribution of water.

 

Municipalities with integrated systems may also report the individual measures for treatment of water, and distribution of water.

 

 

 

16.  BREAKS IN WATER MAINS

17.  BOIL WATER ADVISORIES

 

Number of breaks in water mains

Total kilometres of water main pipe / 100

 

 

Summation of: number of boil water advisory days

 times the number of affected connections

Total connections in service area

5.69 breaks per 100 kilometres of main

0 days a year

    Effectiveness Measure

Number of breaks in water mains per 100 kilometres of water main pipe in a year.

 

    Objective

Improve system reliability and minimize water loss and operational costs.

    Effectiveness Measure

Weighted number of days when a boil water advisory issued by the Medical Officer of Health, applicable to a municipal water supply, was in effect.

 

    Objective

Water is safe and meets local needs.

 

 

 

 

 

 

Town of Markham • Year 2002 Report

Solid Waste                                         

   18a. OPERATING COSTS

   FOR COLLECTION

18b. OPERATING COSTS

FOR DISPOSAL

 

 

Operating costs for solid waste collection

Total tonnes received from all property classes

 OR total households

 

 

 

Operating costs for solid waste disposal

Total tonnes disposed from all property classes OR total households

$62.32 per tonne

$55.74 per tonne

    Efficiency Measure

Operating costs for garbage collection per tonne or per household.

 

  Objective

Efficient collection services without adverse affect on environment.

   Efficiency Measure

Operating costs for garbage disposal per tonne or per household.

 

   Objective

Efficient disposal of solid waste.

 

This measure is reported by municipalities which are responsible for garbage collection.

 

This measure is optional for municipalities with integrated solid waste management systems.

 

A municipality is required to report result in total tonnes.  If tonnage figure is unavailable, the household numbers may be used.

 

 

This measure is reported by municipalities which are responsible for solid waste disposal.

 

This measure is optional for municipalities with integrated solid waste management systems.

 

A municipality is required to report result in total tonnes.  If tonnage figure is unavailable, the household numbers may be used.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Town of Markham • Year 2002 Report

Solid Waste                                         

19. OPERATING COSTS

 FOR DIVERSION

19A. OPERATING COSTS – NET OF REVENUES FOR DIVERSION

 

Operating costs for solid waste diversion

Total tonnes diverted OR total households

 

 

 

 

 

Operating costs for solid waste diversion

Total tonnes diverted OR total households

 

 

 

 

$216.21 per tonne

N/A

   Efficiency Measure

Operating costs for solid waste diversion (recycling) per tonne or per household.

 

  Objective

Waste programs divert garbage from landfills and incinerators.

   Efficiency Measure

Operating costs for solid waste diversion (recycling) per tonne or per household.

 

  Objective

Waste programs divert garbage from landfills and incinerators.

 

This measure is reported by municipalities which are responsible for solid waste diversion.

 

This measure is optional for municipalities with integrated solid waste management systems.

 

A municipality is required to report result in total tonnes.  If tonnage figure is unavailable, the household numbers may be used.

 

 

This measure is reported by municipalities which are responsible for solid waste diversion.

 

This measure is optional for municipalities with integrated solid waste management systems.

 

A municipality is required to report result in total tonnes.  If tonnage figure is unavailable, the household numbers may be used.

 

 


 

Town of Markham • Year 2002 Report

Solid Waste                                         

 

            20.  OPERATING COSTS 

            FOR INTEGRATED SYSTEM

 

Operating costs for solid waste management

Total tonnes disposed of and total tonnes diverted OR total households

$152.20 per tonne

    Efficiency Measure

Average operating costs for solid waste management (collection, disposal and diversion) per tonne or per household.

 

    Objective

Efficient solid waste management programs.

 

This measure is reported only by those municipalities with integrated solid waste management systems.  These municipalities are responsible for garbage collection, garbage disposal, and solid waste diversion (recycling).

 

Municipalities with integrated systems may, if desired, report the individual measures for garbage collection, garbage disposal, and solid waste diversion (recycling). 

 

A municipality is required to report result in total tonnes.  If tonnage figure is unavailable, the household numbers may be used.

 

 


 

Town of Markham • Year 2002 Report

Solid Waste                                         

21a.   FACILITY COMPLIANCE

21b.  NUMBER OF SOLID WASTE MANAGEMENT SITES

22. COMPLAINTS FOR SOLID WASTE AND RECYCLING COLLECTION

 

Total number of days per year MOE compliance order was in effect

 

Total number of waste management sites

 

Number of Complaints

Total Households / 1,000

0 days

4 sites

28.67 complaints per 1,000 households

    Effectiveness Measure

Number of days per year when a Ministry of Environment compliance order for remediation concerning an air or groundwater standard was in effect for a solid waste management facility, by site.

 

    Objective

Municipal solid waste services do not have an adverse affect on environment.

   Effectiveness Measure

Total number of solid waste management sites owned by municipality.

 

   Objective

Effective management of solid waste.

   Effectiveness Measure

Number of complaints received in a year concerning the collection of solid waste and recycled materials per 1,000 households.

 

   Objective

Effective waste management services.

 

23a.  DIVERSION OF SOLID WASTE

 

 

                    Total tonnes of residential waste diverted            x100           

Total tonnes of residential solid waste disposed of

and total tonnes diverted

 

34.61% of solid waste

 

  Effectiveness Measure

Percentage of residential solid waste diverted.

 

   Objective

Municipal waste programs divert garbage from landfills and incinerators.

 

 

This measure is reported if the municipality records tonnage for residential solid waste separately from ICI tonnage.

 

 

 

 

 

 

 

 

 

 

 

 

Town of Markham • Year 2002 Report

Land Use Planning                             

24.  GROWTH AND SETTLEMENT PATTERN

 

Number of new lots, blocks and / or units with final

           approval which are located within the settlement area    x100

Total number of new lots, blocks and / or units

with final approval within entire municipality

 

100.00% of new development

    Effectiveness Measure

Percentage of new development with final approval which is located within settlement areas.

 

  Objective

New lot creation is occurring in settlement areas.

 

 

25a.  PRESERVATION OF AGRICULTURAL LAND IN REPORTING YEAR

25b.  CHANGE IN NUMBER OF DESIGNATED HECTARES IN REPORTING YEAR

 

Hectares of land designated for agricultural purposes

                in the Official Plan as of December 31, 2001     X100

Hectares of land designated for agricultural

 purposes in the Official Plan as of January 1, 2001

 

 

Number of hectares of land originally designated for agricultural purposes which was re-designated for other uses during 2001.

100.00% of agricultural land (reporting year)

0 hectares

    Effectiveness Measure

Percentage of land designated for agricultural purposes which was preserved during 2001.

 

   Objective

Preserve agricultural land.

    Effectiveness Measure

Number of hectares of land originally designated for agricultural purposes which was re-designated for other uses during 2001.

 

   Objective

Preserve agricultural land.

 

25c. AGRICULTURAL LAND RELATIVE TO BASE YEAR

25d.  REDESIGNATED AGRICULTURAL LAND

 

Hectares of land designated for agricultural purposes

              in the Official Plan as of December 31, 2001     X100

Hectares of land designated for agricultural

 purposes in the Official Plan as of January 1, 2000

 

 

Number of hectares of land originally designated for agricultural purposes which was re-designated for other uses relative to base year.

 

 

100.00% of agricultural land (relative to base year)

0 hectares

   Effectiveness Measure

Percentage of land designated for agricultural purposes which was preserved relative to base year of 2000.

 

   Objective

Preserve agricultural land.

    Effectiveness Measure

Number of hectares of land originally designated for agricultural purposes which was re-designated for other uses since January 1, 2000. 

 

   Objective

Preserve agricultural land.

 

q:\2003finadminctteereports\0359mpmp esults2002appendix2_2002.doc