Report to: Development Services Committee                           Report Date: December 2, 2008  

 

 

SUBJECT:                          Application for Zoning By-law Amendment to permit a gas bar, car wash, and convenience store with a drive-through facility at 2801 Elgin Mills Road East

                                            Clera Holdings Limited

                                            ZA 08 121296

PREPARED BY:               Geoff Day, Planner - West Development Team

 

 

RECOMMENDATION:

That the Staff report entitled “Application for Zoning By-law Amendment to permit a gas bar, car wash, and convenience store with a drive-through facility at 2801 Elgin Mills Road East”, be received;

 

That a Public Meeting be held to consider the zoning by-law amendment application, (ZA 08 121296) submitted by Clera Holdings Limited.

 

And that Staff be authorized and directed to do all things necessary to give effect to this resolution.

 

EXECUTIVE SUMMARY:

The subject lands (2801 Elgin Mills Road) is approximately 0.63 hectares (1.56 acres).  The application is to rezone the lands to permit a gas bar, car wash, and convenience store with a drive-through facility.  

 

Initial review of the concept plan has revealed that minor modifications will be required in order to address the outstanding issues from both the Toronto & Region Conservation Authority and Town Staff.  In addition, Staff will continue to work with the Owner in order to achieve the ultimate objectives of the recent planning study on regulating drive through facilities.

 

The Owner proposes that the site at 2801 Elgin Mills Road will operate as a self service gas bar facility with no full service component.

 

Council’s September 2005 resolution requested that the Canadian Petroleum Products Institute review with its Members the need to ensure that all gas stations make provision for full service to patrons having special needs.  The Planning Act identifies that accessibility for persons with disabilities to all facilities, and services is a matter of provincial interest for which municipalities shall have regard.  The Provincial Policy Statement states that healthy, liveable and safe communities are sustained by improving accessibility for persons with disabilities and the elderly by removing and/or preventing land use barriers which restrict their full participation in society.  The Accessibility for Ontarians with Disabilities Act, 2005 will require all private sector businesses and organizations that provide goods or services to people in Ontario make their customer services operations accessible to people with disabilities by January 1, 2012. This will be done by identifying and removing barriers to customer service in such areas as operational practices, policies and procedures, communications and staff training.

In order to allow for public input before Council makes a decision on the application, it is recommended that a public meeting be held. 

 

 

 

PURPOSE:

The purpose of this report is to provide preliminary information regarding the rezoning application to permit a gas bar, car wash, and convenience store with a drive-through facility on the southwest corner of Elgin Mills Road and the future Woodbine Avenue By-pass, and to recommend that a public meeting be scheduled to obtain public comment.

 

BACKGROUND:

Complete Application

A Zoning By-law Amendment application submitted by Clera Holdings Limited was deemed complete on August 3, 2008.

 

Property and Area Context

The subject property is approximately 0.63 hectares (1.56 acres) in area and is located at the southwest corner of Elgin Mills Road and the Future Woodbine Avenue By-pass, within the Cathedral Community (see Figure 1). The lands are presently vacant with a tributary of Carleton Creek located immediately to the west of the subject lands.  The application has been circulated to the Toronto Region Conservation Authority (TRCA).  Their comments are outlined later in this report.  

 

To the north, across Elgin Mills Road are vacant lands proposed for a stormwater management pond.  To the northeast and east are vacant lands proposed for residential plans of subdivisions.  To the south are vacant lands designated and zoned for employment uses.  To the west are lands zoned rural residential. 

 

Official & Secondary Plan and Zoning

The subject lands are designated Business Corridor Area in the Official Plan.  This designation may permit gas bars, car washes, and convenience stores, subject to the review of a specific development proposal and rezoning to the satisfaction of the Town.  The subject lands are also designated Business Corridor in the Cathedral Community Secondary Plan (OPA 42).  The Secondary Plan was originally approved by York Region in 1997, amended by Town Council in June 2004 and approved by the Region in 2005. 

 

The subject property is zoned Business Corridor (BC) by By-law 177-96, as amended (see Figure 2).  The BC zone does not permit the proposed uses.  

 

A site plan application has not yet been submitted for the gas bar, car wash, and convenience store with a drive-through facility.  However, a conceptual site plan and elevations are illustrated in Figures 4-6.  Staff anticipate that the site plan application will be submitted shortly.

 

POTENTIAL BENEFITS OF APPROVAL OF THE PROPOSAL

This proposed development would assist in meeting the local automotive needs of the residents of the surrounding neighbourhoods as well as the travelling public.

CONCERNS/ISSUES TO BE RESOLVED

The following is a brief summary of concerns/issues raised to date.  These matters, and any others identified through the circulation and detailed review of the proposal will be addressed in a final staff report to be presented to Committee at a later date.

 

Concept plan reviewed by Staff

A preliminary review of the conceptual site plan has identified the following matters to be addressed in the formal site plan submission:

 

1)      Elgin Mills Road & Woodbine Avenue By-pass frontages are proposed for large        landscape areas in order to mitigate the views of the proposed drive through           queuing lanes.  Townhouses are proposed on the east side of the By-pass,         opposite the proposed development;

2)      An increased landscape buffer (minimum 3.0m) will be required along the north           western portion of the property where it abuts the open space area adjacent to   the        drainage channel;

3)     A Noise Study will be required for the car wash facility in order to determine   noise impacts on the residential lands to the east and to determine preferred          mitigation strategies;

4)     Both driveways (Elgin Mills Road & Woodbine Avenue By-pass) cross over onto the abutting properties and will need to be realigned.

 

As of the date of this report, a formal site plan application has not been submitted for the proposed development.  Additional comments, requirements and restrictions will be identified once a site plan application has been formally submitted to the Town.

 

TRCA recommends minor modifications

The TRCA has identified a small area along the western portion of the property that is within the stream corridor of the East Branch of Carleton Creek.  This corridor is to be widened and enhanced through the associated plan of subdivision, Master Environmental & Servicing Plan (MESP) and Secondary Plan.  In order to ensure preservation of the stream corridor, a portion along the western boundary of the property will need to be zoned into an appropriate “Open Space” designation allowing only naturalized vegetation in that area. 

 

Subject to the modifications identified above, the TRCA has no objections to the rezoning of the site.  However, these comments are solely based on the rezoning application.  Additional comments, requirements and restrictions may be identified once a Site Plan application has been formally submitted to the Town and the TRCA.   

 

Restrictions on drive-throughs

On November 4th, Staff tabled a report titled “Potential Regulation of Drive-Through Facilities”.  In this report, Staff made recommendations regarding potential changes to development standards that may result in the following:

 

  • The potential prohibition or restriction of drive-throughs in specified zones;
  • The potential prohibition or restriction of drive-throughs within a certain distance of residential uses; and,
  • The potential prohibition or restriction of queuing lanes within certain distances of a street; and,
  • The potential prohibition or restriction of queuing lanes between the building and the street.

 

The report also identified potential new urban design guidelines which will assist in the following:

 

  • The integration of operational elements of sites, e.g. pedestrian, cyclist and motor vehicle movements;
  • Enhanced views from public streets and contributions to high quality public spaces;
  • Creation  of a safe and comfortable pedestrian and cyclist environment; and,
  • Minimization of negative impacts on adjacent or nearby land uses.

 

The next stage of this study will be to engage and consult with the development industry, before reporting back to the Development Services Committee.   

 

Staff will continue to work with the applicant in order to implement any provisions needed to assist in achieving the ultimate objectives of the planning study.   

 

Full service component of gas bar

On September 13, 2005, Council passed the following resolution:

“That the Canadian Petroleum Products Institute be requested to review with its Members the need to ensure that all gas stations make provision for full service to patrons having special needs;

And that the Province of Ontario be requested to address the issue of accessibility to gas station service in Provincial policies and guidelines pertaining to the accessibility needs of Ontarians;

And that the Town of Markham Council and Staff use all available tools to ensure the provision of a full service component for all future gas station facilities in the Town of Markham;

And that the Mayor’s Office write to all gas station operators in the Town of Markham to request them to review their current operations to see what can be done to accommodate patrons with special needs;

And further that copies of this resolution be forwarded to the Canadian Petroleum Products Institute, the Province of Ontario, Region of York municipalities, the Association of Municipalities of Ontario and the Markham Advisory Committee for Accessibility.”

Since the September 2005 resolution, Staff have been successful in ensuring the provision of a full service component for new gas station facilities in the Town of Markham.  Four specific examples are:

 

·  ESSO (9982 Highway 48 – split serve location  - 2 year pilot project – Approved 2005)

·  Petro Canada (4641 Highway 7 East – split serve location - Approved 2007)

·  Shell Canada (8510 Woodbine Avenue – split serve location - Approved 2005)

·  Canadian Tire Gas Bar (8675 McCowan Road – split serve location – Approved 2008 – not yet built)

 

Another ESSO station, located at 550 Bur Oak, was rezoned in 2004 and received site plan approval in April 2005, but these approvals pre-dated the September 2005 Council resolution on the provision of full services to customers with special needs.

 

The Owner, (Imperial Oil) is aware of this resolution having worked with Staff on previous applications. 

 

For the site at the southwest corner of Highway 48 and Major MacKenzie Drive East, the Owner agreed to a minimum two year pilot project to provide full pump service between the hours of 7:00 A.M. and 7:00 P.M. seven days per week and to install signage to this effect. 

 

On October 30 2008, Staff received a letter of intent from Imperial Oil (see Appendix ‘A’).  The letter outlines that since 2003, Imperial Oil has had a national program in place for “Drivers with Disabilities”.  The program identifies that “drivers with disabilities” can get full service gas at self serve locations by calling the given station approximately 24 hours in advance.  In addition, ESSO identifies that wheelchair accessible washrooms, dedicated parking spaces, wheelchair ramps into the stores, store layouts to accommodate wheelchairs and the “Speedpass” readers at the pumps and inside the store; are provided in most of their facilities.

It should be noted that the majority of the accessibility features identified are either already required by the Ontario Building Code or the Town’s Municipal Zoning By-laws.    

The letter continues by indicating that in the one year since the project has been implemented at the Highway 48 and Major MacKenzie Drive East site, full service sales “have been very disappointing”.  Full service labour costs account for roughly 40% of the total site labour costs yet only represent 1.4% of total sales.  The letter concludes by stating that the site at Elgin Mills and the Woodbine Avenue By-pass will operate as a self service location with no full service component. (see Appendix A).

 

The Provincial Policy Statement and the Planning Act supports accessibility

The Provincial Policy Statement (PPS) came into effect on March 1, 2005.  The PPS reflects the identification in the Planning Act of accessibility as a matter of provincial interest.

 

Section 2 subsection h.1) of the Planning Act identifies “the accessibility for persons with disabilities to all facilities, and services  ...” as a matter of provincial interest for which municipalities shall have regard. 

 

Section 1.1.1 f) of the PPS states that healthy, liveable and safe communities are sustained by:

 

“Improving accessibility for persons with disabilities and the elderly by removing and/or preventing land use barriers which restrict their full participation in society.”

 

Given the policies set out in the Planning Act and the PPS, Staff are of the opinion that further negotiation with the applicant is required to meet the intent of both documents as it relates to accessibility.

Accessibility for Ontarians with Disabilities Act, 2005

Ontario’s accessible Customer Service Standard is now in force.  It came into force on January 1, 2008.  By January 1, 2012, businesses and organizations that provide goods or services to people in Ontario will be legally required to make their customer service operations accessible to people with disabilities. This will be done by identifying and removing barriers to customer service in such areas as operational practices, policies and procedures, communications and staff training.

 

Planning Staff have consulted with Markham’s Accessibility Coordinator in drafting this report.  As this legislation is now in force and will be implemented by all businesses and organizations by 2012, Town Staff recommend that Imperial Oil be proactive, adhere to and implement Council’s September 2005 resolution pertaining to a full service component for all future gas stations.  Staff will continue to work with Imperial Oil to achieve this objective. 

 

FINANCIAL TEMPLATE

No financial considerations at this time.

 

ALIGNMENT WITH STRATEGIC PRIORITIES:

Staff recommend that Imperial Oil revisit their policies on accessibility to ensure that their products and services are fully accessible to all customers.  Imperial Oil’s adherence to Council’s mandate will further implement the strategic priority of Diversity.  

 

DEPARTMENTS CONSULTED AND AFFECTED:

The application has been circulated to various Town departments and external agencies.  Requirements of the Town and external agencies will be reflected in the preparation of the Zoning By-law amendment and in the site plan agreement.


 


RECOMMENDED   BY:     

 

 

 

 

 

 

Valerie Shuttleworth, M.C.I.P., R.P.P.

Director of Planning & Urban Design

 

Jim Baird, M.C.I.P., R.P.P.

Commissioner of Development Services

 

 

 

 

ATTACHMENTS:

 

Figure 1 - Applicant/Agent & Location Map

Figure 2 - Area Context/Zoning

Figure 3 - Air Photo

Figure 4 - Conceptual Site Plan

Figure 5 - Conceptual Elevations (Main Building)

Figure 6 - Conceptual Elevations (Main Building)

Appendix ‘A’ – Letter from Imperial Oil

 

 

File path: Amanda\File 08 121296\Documents\Preliminary Report

 

Figure 1

 

Applicant/Agent/Owner:

 

                                   Todd Trudelle

                                   Goldberg Group

                                   2171 Avenue Road, Suite 301

         Toronto, ON 

         M5M 4B4

                                   Tel: (416) 322-6364 ext. 2103

                                   Fax: (416) 932-9327

 

                                    Don Dussault

                                    Manager – Real Estate Development

                                    Imperial Oil Limited

                                    P.O. Box 1490

                                    Fonthill, ON

                                    L0S 1E0

                                    Tel: (905) 736-0194

                                   Fax: (905) 892-4995