Report to: Development Services Committee                   Report Date: September 21, 2010

 

 

SUBJECT:                         RECOMMENDATION REPORT

                                            Times Group Inc. 

                                            South side of Highway 7, east of Village Parkway

                                            Application for site plan approval for a commercial development (Markham Uptown Interim Commercial Development)       

                                            File No. SC 10 122552    

                                                 

PREPARED BY:              Scott Heaslip, Senior Project Coordinator, Central District

 

 

RECOMMENDATION:

 

1)                  That the staff report entitled “Times Group Inc., South side of Highway 7, east of Village Parkway, Application for site plan approval for a commercial development (Markham Uptown Interim Commercial Development)” be received. 

 

2)                  That the application be endorsed, in principle, subject to the refinements to the plans and the conditions outlined in the staff report.

 

3)                  That site plan approval be delegated to the Commissioner of Development Services, or his designate, to be issued following execution of a site plan agreement (Site Plan Approval is issued only when the Commissioner has signed the site plan “approved”), when the following conditions have been met:

·         Plan of subdivision 19TM-070003 has been registered.

·         The Owner has entered into  a site plan agreement with the Town and the Region of York containing all standard and special provisions and requirements of the Town and public agencies and the provisions outlined in Appendix ‘A’ to the September 21, 2010 staff report. 

·         The Trustee for the applicable cost sharing group has advised the Town in writing that the Owner is in good standing with the group.

·         Minor variance A/97/10 has been approved and has come into force and effect.

·         The Holding provision has been removed from the zoning of the subject lands in accordance with the provisions of the by-law.

 

4)                  That, in the event the Owner participates in the enhanced hoarding program for Markham Centre, the Mayor and Clerk be authorized to execute a hoarding agreement with the Owner.

 

5)                  And that Staff be authorized and directed to do all things necessary to give effect to this resolution.

 

EXECUTIVE SUMMARY:

 

Not applicable.

1. Purpose                     2. Background                     3. Discussion                         4. Financial       

 

5. Others (HR, Strategic, Affected Units) 6. Attachment(s)

PURPOSE:

 

The purpose of this report is to discuss and recommend endorsement, in principle, of site plan approval of commercial development on the south side of Highway 7, east of Village Parkway (Future Birchmount Road extension).    

 

BACKGROUND:

 

Subject Lands (Figures 1, 3 and 4)

The subject lands have an area of 3.79 ha (9.4 acres) and are located at the south-east corner of Highway 7 and future Birchmount Road.  The lands are a block on a draft approved plan of subdivision 19TM-070003, which was approved by the Ontario Municipal Board on May 19, 2010 (Figure 4).  The lands are vacant and contain no significant vegetation. 

 

Official Plan and Zoning (Figure 2)

The subject lands are designated COMMERCIAL – COMMUNITY AMENITY AREA in the Official Plan.  They are further designated COMMUNITY AMENITY AREA – MAJOR URBAN PLACE in the Markham Centre Secondary Plan.

 

The lands are zoned “Markham Centre – Downtown Two (Hold 1 Hold 2)” (MC-D2*11*14 (H1 H2)) by By-law 2004-196, as amended.  This zoning was approved by the Ontario Municipal Board on May 19, 2010.  

 

Proposal

The proposed development comprises seven commercial buildings, having a total combined floor area 13250 square metres (142,700 square feet).  (Figure 5)

 

The proposed commercial buildings are deployed around the perimeter of the site enclosing the extensive surface parking lot from the street.  Six of the buildings will be one storey.  The seventh building, located at the corner of Highway 7 and Birchmount Road, will be a three storey office building. 

 

The largest building, with a floor area of 3350 square metres (36,000 square feet), is intended to be occupied by a supermarket. The other six buildings will accommodate a range of retail, service, restaurant and office uses.

 

The two buildings adjoining Birchmount Road will have demising walls in the middle to ensure that commercial units face directly onto Birchmount Road.   This is particularly important as the mixed-use buildings on the west side of Birchmount will incorporate street related commercial uses along the Birchmount Road frontage which will face onto these buildings. 

 

A total of 529 parking spaces are proposed. The majority (414 spaces) will be in a surface parking lot.  The remainder (115 spaces) will be in a one level underground parking garage serving the office building.  

The buildings will be faced with brick and stone veneer accented with architectural pre-cast moulding. (Figures 6-10)

 

OPTIONS/ DISCUSSION:

 

Subdivision and implementing zoning approved by Ontario Municipal Board

On May 19, 2010, the Ontario Municipal Board (OMB) approved the Times (Uptown Markham) draft plan of subdivision (see Figure 4), subject to conditions, together with implementing zoning by-law

 

The zoning by-law approved by the OMB for the Times lands include a site specific provision permitting the subject lands to be developed with an “interim commercial development” with surface parking. 

 

The commercial uses in the “interim commercial development” are intended to ultimately be incorporated into mixed-use buildings on this and other blocks within the plan of subdivision, allowing the subject lands to be redeveloped with high density mixed-use buildings, over time.

 

The Times Group has applied to the Committee of Adjustment to increase the maximum permitted net floor area of the proposed development from 12,000 square metres to

13,250 square metres.  The requested increase corresponds to the area of the third floor of the office building, which was previously proposed to be two storeys.  Staff support the addition of a third floor to the office building.  This application is scheduled to be heard by the Committee of Adjustment on September 8, 2010.

 

Proposed development generally consistent with Town’s built form objectives, but requires refinement 

The applicant has been requested to refine the project plans to address outstanding urban design issues, including:

The required refinements will be incorporated into the project plans before they are endorsed by staff.

 

The proposed development is scheduled to be reviewed by the Markham Centre Advisory Group in September.  Any requirements of the Advisory will be addressed in the final project plans.   

 

Environmental and sustainability initiatives

Times Group has committed to the following sustainable initiatives:

 

Markham District Energy has advised that “it makes most sense today not to connect the interim retail uses in Blocks 7 & 8.”   

 

Staff will ensure that appropriate Fatal Light Awareness Program (FLAP) measures are incorporated into the final project plans.

 

Project cannot proceed until required infrastructure secured  

The applicant has applied to the Town for a subdivision agreement for the first phase of the draft plan, which includes the subject lands.  Staff are currently reviewing technical submissions from the Times Group addressing the conditions of draft approval, and are processing the required subdivision agreement.

 

Staff will work with the applicant to expedite the issuance of building permits for this project.   However, before any building permits (including conditional permits) can be considered, the required sanitary and storm sewer, water and road infrastructure, including the Highway 7 sanitary sewer, needs to be secured.  The grading of the adjoining roads also needs to be finalized in order to ensure that the ground floor level of the buildings properly meets grade.  

 

A full building permit cannot be issued until after registration of the plan of subdivision and execution of the required site plan agreement.

 

 

FINANCIAL CONSIDERATIONS AND TEMPLATE: (external link)

 

Not applicable.

 

HUMAN RESOURCES CONSIDERATIONS

 

Not applicable.

 

ALIGNMENT WITH STRATEGIC PRIORITIES:

 

The proposed development supports the following Strategic Priority:

 

Environment - see Environmental and Sustainability Initiatives, above

 

BUSINESS UNITS CONSULTED AND AFFECTED:

 

The proposed development has been circulated to internal Town departments and external agencies. All comments/requirements of these departments and agencies are or will be reflected in the final project plans, or will be secured in the site plan agreement.   

 

 

 

RECOMMENDED BY:

 

 

 

_______________________________                ________________________

Biju Karumanchery, M.C.I.P., R.P.P.                   James Baird, M.C.I.P., R.P.P.

Senior Development Manager                              Commissioner, Development Services

 

 

ATTACHMENTS:

 

Figure 1         -  Location Map

Figure 2         -  Area Context

Figure 3         -  Air Photo

Figure 4         -  Draft approved plan of subdivision

Figure 5         -  Site plan

Figures  6-10 -  Elevations

Figure 11       -  Perspective of office building

Figure 12       -  Perspective of supermarket building 

 

APPENDIX A – Conditions of Site Plan Approval

 

 

 

APPENDIX A

Conditions of Site Plan Approval

Times Group Inc.

South side of Highway 7, east of Village Parkway

Markham Centre Community

 

           

Prior to the execution of the site plan agreement, the Owner shall submit:

1.         site plans, elevation drawings, underground parking garage layout plans, grading, servicing and engineering drawings that comply with all requirements of the Town, the Markham Centre Advisory, and authorized public agencies, to the satisfaction of the Commissioner of Development Services.  The final plans shall incorporate appropriate Fatal Light Awareness Program (FLAP) components to ensure more bird friendly buildings, to the satisfaction of the Town.  

2.         landscape Plans, including streetscape details, prepared by a Landscape Architect having membership with the Ontario Association of Landscape Architects.

3.         a storm water management report and a functional servicing report.

4.         a geotechnical report.

5.         an environmental site assessment report, phase 1/2.

for endorsement or approval by the Town.

 

The Owner shall enter into a Site Plan Agreement with the Town and the Region of York, containing all standard and special provisions and requirements of the Town, the Region and other public agencies including, but not limited to, the following:

1.      Provisions for the  payment by the Owner of all applicable fees, recoveries, development charges, parkland dedications (including cash-in-lieu) and financial obligations related to applicable Developers Group Agreements.

2.      That the location, size and construction of all refuse storage areas and recycling facilities, and arrangements for waste collection be to the satisfaction of the Town of Markham Waste Management Department.

3.      That the site be designed to ensure that there is no permanent underground encroachment into any municipal road right-of-way.

4.      That the Owner shall provide and implement a comprehensive Green Infrastructure plan to the satisfaction of the Commissioner of Development Services.  The plan shall include the following minimum elements – LEED certified buildings,  areas of permeable pavement within the surface parking lot, stormwater management system using infiltration galleries and underground trenches, drought resistant/low irrigation requirement landscaping,  limited irrigation using recycled rainwater, predominantly native species used in landscaping, use of high reflectivity paving materials to reduce urban heat island effect,  provision of bicycle racks, energy efficient lighting in the public realm.

5.      Provisions to ensure implementation of the recommendations of the approved studies and reports.

6.      Provisions for satisfying all requirements of Town departments and public agencies.  

7.      Provisions to ensure that all shopping carts will be equipped with devices to discourage them from being removed from the property.

8.      Provisions to ensure that any restaurant uses are equipped with odour control units.    

9.      That the Owner design the site to ensure that there is no permanent underground encroachment into any municipal road right-of-way.

10.  That the Owner provide confirmation the height of the buildings meets the requirements of Transport Canada, including applicable warning clauses.

 

This endorsement shall lapse and site plan approval will not be issued, after a period of three years commencing on September 21, 2010, in the event that the site plan agreement is not executed within that period.

 

 

 